1 |
2017-18 |
DMFT00017 |
Implementation of Rural Water Supply Scheme in Jhirki and adjacent villages for the purpose of the water supply system. |
Gumia Block |
JHIRKE |
638.48 |
Executive Engineer, P.H. E.D. Tenughat |
Completed |
2 |
2017-18 |
DMFT00021 |
Implementation of Rural Water Supply Scheme in Lalpaniya and adjacent villages for the purpose of the water supply system. |
Gumia Block |
LALPANIYA |
1,192.67 |
Executive Engineer, P.H. E.D. Tenughat |
Completed |
3 |
2017-18 |
DMFT00022 |
Implementation of Rural Water Supply Scheme in Pachmo and adjacent villages for the purpose of the water supply system. |
Gumia Block |
PACHMO |
696.20 |
Executive Engineer, P.H. E.D. Tenughat |
Ongoing |
4 |
2017-18 |
DMFT00025 |
Implementation of Rural Water Supply Scheme in Kathara villages for the purpose of the water supply system. |
Gumia Block |
KATHARA |
564.03 |
Executive Engineer, P.H. E.D. Tenughat |
Completed |
5 |
2018-19 |
DMFT00027 |
Implementation of Rural Water Supply Scheme in Kander and adjacent villages for the purpose of the water supply system. |
Gumia Block |
KANDER |
1,248.51 |
Executive Engineer, P.H. E.D. Tenughat |
Completed |
6 |
2018-19 |
DMFT00028 |
Implementation of Rural Water Supply Scheme in Hosir East and adjacent villages for the purpose of the water supply system. |
Gumia Block |
HOSIR EAST |
881.51 |
Executive Engineer, P.H. E.D. Tenughat |
Completed |
7 |
2018-19 |
DMFT00029 |
Implementation of Rural Water Supply Scheme in Siyari and adjacent villages for the purpose of the water supply system. |
Gumia Block |
SIYARI |
721.67 |
Executive Engineer, P.H. E.D. Tenughat |
Completed |
8 |
2018-19 |
DMFT00030 |
Implementation of Rural Water Supply Scheme in Chatrochati and adjacent villages for the purpose of the water supply system. |
Gumia Block |
CHATROCHATTI |
1,832.95 |
Executive Engineer, P.H. E.D. Tenughat |
Completed |
9 |
2018-19 |
DMFT00031 |
Implementation of Rural Water Supply Scheme in Khamhara and adjacent villages for the purpose of the water supply system. |
Gumia Block |
KHAMHARA |
839.38 |
Executive Engineer, P.H. E.D. Tenughat |
Completed |
10 |
2019-20 |
DMFT00033 |
Implementation of Rural Water Supply Scheme in Sawang South and adjacent villages for the purpose of the water supply system. |
Gumia Block |
SAWANG SOUTH |
974.84 |
Executive Engineer, P.H. E.D. Tenughat |
Completed |
11 |
2022-23 |
DMFT00539 |
Construction of Playground under the scheme of Veer Shaheed Poto ho at Upgraded High School, Gumia |
Gumia Block |
GOMIA |
5.26 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
12 |
2023-24 |
DMFT00568 |
Construction of Chhath Ghat in Bhagat Pond in Gumia GP of Gumia Block |
Gumia Block |
GOMIA |
15.00 |
Executive Engineer, MI Division, Bokaro |
Ongoing |
13 |
2023-24 |
DMFT00569 |
Construction of PCC road, culvert and guardwall on both sides from Mahendra Bhandari's house to Madhya Durga Temploe in Gomia GP of Gomia Block |
Gumia Block |
GOMIA |
23.50 |
Executive Engineer, MI Division, Bokaro |
Ongoing |
14 |
2023-24 |
DMFT00570 |
Construction of 1.25km PCC road from Old cinema hall in Palihari Gurudih GP of Gomia block to Railway Station Gomia. |
Gumia Block |
PALIHAARI GURUDIH |
60.00 |
Executive Engineer, MI Division, Bokaro |
Ongoing |
15 |
2023-24 |
DMFT00571 |
Construction of 600m PCC road from CPP power plant to the crematorium in Kathara GP of Gomia block. |
Gumia Block |
KATHARA |
30.00 |
Executive Engineer, MI Division, Bokaro |
Ongoing |
16 |
2023-24 |
DMFT00572 |
Construction of PCC road froom pipradih panch mandir to railway line on the way to Gomia station in Swang west GP of Gomia Block |
Gumia Block |
SAWANG NORTH |
48.70 |
Executive Engineer, MI Division, Bokaro |
Ongoing |
17 |
2023-24 |
DMFT00573 |
Construction of 500 m drain with cover from seva sadan hospital to railway line in Palihari Gurdih GP of Gomia Block |
Gumia Block |
PALIHAARI GURUDIH |
40.00 |
Executive Engineer, MI Division, Bokaro |
Ongoing |
18 |
2023-24 |
DMFT00574 |
Construction of 2km PCC road and guard wall from Dam Basti main road to Bokaro river in Bandh GP of Gomia block. |
Gumia Block |
BANDH |
99.50 |
Executive Engineer, MI Division, Bokaro |
Ongoing |
19 |
2023-24 |
DMFT00577 |
Construction of Auditorium Hall (500 seats) at Kasturba gandhi Girl High School under Gumia Block |
Gumia Block |
TENUGHAT |
203.81 |
Executive Engineer, Building Division, Bokaro |
Ongoing |
20 |
2022-23 |
DMFT00602 |
BALA Painting at Kasturba Gandhi Girls Residential School, Gomia, Sarhachiya, Gomia |
Gumia Block |
SARHACHIYA |
56.29 |
Trinetra Enterprises, Hazaribagh |
Completed |
21 |
2023-24 |
DMFT00605 |
Construction of AWC building at Asnapani Center no - 517 |
Gumia Block |
KATHARA |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
22 |
2023-24 |
DMFT00606 |
Construction of AWC building at Dudhmatia Center no - 518 |
Gumia Block |
BANDH |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
23 |
2023-24 |
DMFT00607 |
Construction of AWC building at Palani (Mini) Center no - 525 |
Gumia Block |
BANDH |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
24 |
2023-24 |
DMFT00608 |
Construction of AWC building at Rathtand Center no - 704 |
Gumia Block |
HOSIR EAST |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
25 |
2023-24 |
DMFT00609 |
Construction of AWC building at Dhende Niche Tola Center no - 707 |
Gumia Block |
HOSIR EAST |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
26 |
2023-24 |
DMFT00610 |
Construction of AWC building at Keri Niche Tola Center no - 824 |
Gumia Block |
LALPANIYA |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
27 |
2023-24 |
DMFT00611 |
Construction of AWC building at Badki Punnu Center no - 1022 |
Gumia Block |
|
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
28 |
2023-24 |
DMFT00612 |
Construction of AWC building at Tongari Basti Center no - 1027 |
Gumia Block |
|
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
29 |
2023-24 |
DMFT00613 |
Construction of AWC building at Post Office Mohalla Center no - 1030 |
Gumia Block |
|
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
30 |
2023-24 |
DMFT00614 |
Construction of AWC building at Harijan Tola Center no - 629 |
Gumia Block |
JHIRKE |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
31 |
2023-24 |
DMFT00615 |
Construction of AWC building at Yadav Tola Center no - 630 |
Gumia Block |
JHIRKE |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
32 |
2023-24 |
DMFT00616 |
Construction of AWC building at Bich Tola Center no - 631 |
Gumia Block |
JHIRKE |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
33 |
2023-24 |
DMFT00648 |
Construction of AWC building at Kendua tola of Bandh GP under Gomia Block |
Gumia Block |
BANDH |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
34 |
2023-24 |
DMFT00649 |
Construction of AWC building at Chatki Punnu of Badki Punnu GP under Gomia Block |
Gumia Block |
|
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
35 |
2023-24 |
DMFT00650 |
Construction of AWC building at Tarwagada Muslim Tola of Badki Punnu GP under Gomia Block |
Gumia Block |
|
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
36 |
2023-24 |
DMFT00651 |
Construction of AWC building at Chatniya Tola of Badki Punnu GP under Gomia Block |
Gumia Block |
|
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
37 |
2023-24 |
DMFT00652 |
Construction of AWC building at Amba Tola of Badki Punnu GP under Gomia Block |
Gumia Block |
|
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
38 |
2023-24 |
DMFT00653 |
Construction of AWC building at Prajapati Tola of Hajari GP under Gomia Block |
Gumia Block |
HAZARI |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
39 |
2023-24 |
DMFT00654 |
Construction of AWC building at Lattkutha of Palihari Gurudih GP under Gomia Block |
Gumia Block |
PALIHAARI GURUDIH |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
40 |
2023-24 |
DMFT00655 |
Construction of AWC building at Kothitand of Palihari Gurudih GP under Gomia Block |
Gumia Block |
PALIHAARI GURUDIH |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
41 |
2023-24 |
DMFT00656 |
Construction of AWC building at Bhadwa Khet of Palihari Gurudih GP under Gomia Block |
Gumia Block |
PALIHAARI GURUDIH |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
42 |
2023-24 |
DMFT00657 |
Construction of AWC building at Kothitand Maidan of Palihari Gurudih GP under Gomia Block |
Gumia Block |
PALIHAARI GURUDIH |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
43 |
2023-24 |
DMFT00658 |
Construction of AWC building at Choudhary Tola of Gomia GP under Gomia Block (Center No-416) |
Gumia Block |
GOMIA |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
44 |
2023-24 |
DMFT00659 |
Construction of AWC building at Harijan Tola of Gomia GP under Gomia Block (Center No-417) |
Gumia Block |
GOMIA |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
45 |
2023-24 |
DMFT00660 |
Construction of AWC building at Padaria of Gomia GP under Gomia Block (Center No-418) |
Gumia Block |
GOMIA |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
46 |
2023-24 |
DMFT00661 |
Construction of AWC building at Bangla Tand of Gomia GP under Gomia Block (Center No-419) |
Gumia Block |
GOMIA |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
47 |
2023-24 |
DMFT00662 |
Construction of AWC building at Modi Tola of Gomia GP under Gomia Block (Center No-421) |
Gumia Block |
GOMIA |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
48 |
2023-24 |
DMFT00663 |
Construction of AWC building at Prajapati Tola of Gomia GP under Gomia Block (Center No-422) |
Gumia Block |
GOMIA |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
49 |
2023-24 |
DMFT00664 |
Construction of AWC building at Karmali Tola of Gomia GP under Gomia Block (Center No-423) |
Gumia Block |
GOMIA |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
50 |
2023-24 |
DMFT00665 |
Construction of AWC building at Kali Mandir Post Office Mohalla of Gomia GP under Gomia Block (Center No-424) |
Gumia Block |
GOMIA |
11.73 |
Executive Engineer, Rural Development Special Division, Bokaro |
YetToStart |
51 |
2023-24 |
DMFT00737 |
Construction of Paver Block and other miscellaneous works in Gandhi Gram premises of Siyari panchayat under Gomia Block. |
Gumia Block |
SIYARI |
68.70 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
52 |
2023-24 |
DMFT00744 |
Strengthening of source by Construction of intake well, Gangway supplying & layinig raw water raising main from konar river to existing WTP for Gomia Rural Water Supply Scheme |
Gumia Block |
GOMIA |
450.78 |
Executive Engineer, P.H. E.D. Tenughat |
YetToStart |
53 |
2022-23 |
DMFT00076 |
Construction of 400 feet P.C.C. road from school gate to school boundary wall in village-Dhardharwa under Siyari Panchayat. |
Gumia Block |
SIYARI |
14.06 |
Executive Engineer, Rural Work Division, Bokaro |
Completed |
54 |
2022-23 |
DMFT00077 |
Construction of 400 feet P.C.C. road from opposite school wall to old road in Dhardharwa village under Siyari Panchayat. |
Gumia Block |
SIYARI |
14.06 |
Executive Engineer, Rural Work Division, Bokaro |
Completed |
55 |
2022-23 |
DMFT00078 |
Construction of 500 feet guard wall from Naresh Chaudhary's house to Pyari Chaudhary's house of Panchayat Siyari village-Dumri Yadav Tola. |
Gumia Block |
SIYARI |
12.72 |
Executive Engineer, Rural Work Division, Bokaro |
Completed |
56 |
2022-23 |
DMFT00084 |
Construction of P.C.C. road at raw level below the transformer in Islam Gali of Jhirke Panchayat. |
Gumia Block |
JHIRKE |
28.06 |
Executive Engineer, Rural Work Division, Bokaro |
Completed |
57 |
2022-23 |
DMFT00085 |
UPG P S KUSUMDIH (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Barkipunu. |
Gumia Block |
BARKI PUNU |
4.30 |
Executive Engineer, Rural Work Division, Bokaro |
Completed |
58 |
2022-23 |
DMFT00086 |
UPG RAJKIYAKRIT M S KERI (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Tikahara |
Gumia Block |
TIKAHARA |
4.30 |
Executive Engineer, Rural Work Division, Bokaro |
Completed |
59 |
2022-23 |
DMFT00087 |
UPG RAJKIYAKRIT M S GANGPUR (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Mahuatand |
Gumia Block |
MAHUA TAND |
4.30 |
Executive Engineer, Rural Work Division, Bokaro |
Completed |
60 |
2022-23 |
DMFT00088 |
UPG P S KATHARA NO-4 (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Kathara panchayat |
Gumia Block |
KATHARA |
4.30 |
Executive Engineer, Rural Work Division, Bokaro |
Completed |
61 |
2022-23 |
DMFT00089 |
UPG P S KATHARA JHOPARPATTI (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Kathara panchayat |
Gumia Block |
KATHARA |
4.30 |
Executive Engineer, Rural Work Division, Bokaro |
Completed |
62 |
2022-23 |
DMFT00090 |
UPG P S RAILWAY COLONY (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Kathara |
Gumia Block |
KATHARA |
4.30 |
Executive Engineer, Rural Work Division, Bokaro |
Completed |
63 |
2022-23 |
DMFT00091 |
SSA NPS CHATNIYA JHIRKI, (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Jhirke |
Gumia Block |
JHIRKE |
4.30 |
Executive Engineer, Rural Work Division, Bokaro |
Completed |
64 |
2022-23 |
DMFT00092 |
UPG P S NAWATAND (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Siyari |
Gumia Block |
SIYARI |
4.30 |
Executive Engineer, Rural Work Division, Bokaro |
Completed |
65 |
2022-23 |
DMFT00116 |
Construction of boundary wall upgradred Middle school Mahli bandh.
|
Gumia Block |
GOMIA |
7.47 |
Executive Engineer, NREP Bokaro |
Completed |
66 |
2022-23 |
DMFT00117 |
Construction of boundary wall Repair in Middle School Swang (Purana Mines). |
Gumia Block |
SAWANG NORTH |
19.73 |
Executive Engineer, NREP Bokaro |
Completed |
67 |
2022-23 |
DMFT00118 |
Construction of Model School of Govt.
Middle School Hajari. |
Gumia Block |
HAZARI |
23.90 |
Executive Engineer, NREP Bokaro |
Completed |
68 |
2022-23 |
DMFT00119 |
Construction of boundary wall patwa hajari toli football ground of north side. |
Gumia Block |
HAZARI |
10.26 |
Executive Engineer, NREP Bokaro |
Completed |
69 |
2022-23 |
DMFT00120 |
Construction of boundary wall with main gate
in upgraded Middle School Gomiyadih. |
Gumia Block |
GOMIA |
14.28 |
Executive Engineer, NREP Bokaro |
Completed |
70 |
2022-23 |
DMFT00121 |
Construction of 300 m Drain under ground from House of Umashankar Prasad to House of Pashupati Prajapati in Patwa Toli. |
Gumia Block |
GOMIA |
24.92 |
Executive Engineer, NREP Bokaro |
Completed |
71 |
2022-23 |
DMFT00135 |
Construction of Boundary wall,P.C.C and Gate of Pradhan Mantri Awas Yojna for Landless Beneficiaries in Claster. |
Gumia Block |
SIYARI |
70.96 |
Executive Engineer, NREP Bokaro |
Completed |
72 |
2022-23 |
DMFT00179 |
Renovation of pond in buru sodo |
Gumia Block |
GOMIA |
24.81 |
Executive Engineer, MI Division, Bokaro |
Completed |
73 |
2022-23 |
DMFT00182 |
Construction of 400 feet PCC Road from Islam gali budhwa tongri to Ghagharia |
Gumia Block |
JHIRKE |
18.91 |
Executive Engineer, MI Division, Bokaro |
Completed |
74 |
2022-23 |
DMFT00183 |
Construction of 500 feet PCC road and guard wall from Kendua tola to Chhutu Singh's house in Mahalibandh. |
Gumia Block |
BANDH |
24.90 |
Executive Engineer, MI Division, Bokaro |
Completed |
75 |
2021-22 |
DMFT00188 |
Construction of PCC Road from Gomia Thana Chowk to Kodi Tand at Gomia Panchayat under Gomia Block District Bokaro |
Gumia Block |
GOMIA |
46.70 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
76 |
2021-22 |
DMFT00189 |
Construction of PCC Road from Ajit Tent House to Khudgadda at Khudgadda Panchayat Swang North under Gomia Block District Bokaro |
Gumia Block |
HAZARI |
43.58 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
77 |
2021-22 |
DMFT00190 |
Construction of Drain from 1/B Market Main Road Bobi Dukan to Manoj Mandal Hotel at 1/B Market in Panchayat Swang North under Block Gomia District Bokar |
Gumia Block |
SAWANG NORTH |
46.69 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
78 |
2021-22 |
DMFT00191 |
Construction of PCC Road from Swang North in Kabristan to Konar River at Swang Panchayat Swang under Gomia Block District Bokaro |
Gumia Block |
SAWANG NORTH |
45.17 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
79 |
2021-22 |
DMFT00219 |
Construction of Guard Wall and PCC Road from Mahlibandh (Baburam Tola) H/o Ramchandra to Bokaro River (Chhath Ghat) at Mahlibandh(Baburam Tola) in Panchayat Bandh under Gomia Block District Bokaro |
Gumia Block |
BANDH |
49.25 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
80 |
2021-22 |
DMFT00220 |
Construction of PCC Road from Bandh Basti Samudayik Bhawan Yadav Tola to Kathara Main Road at Village Bandh panchayat Bandh under Gomia Block District Bokaro |
Gumia Block |
BANDH |
49.62 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
81 |
2021-22 |
DMFT00221 |
Construction of PCC Road from Gorkhwar to Bokaro River at Hajari Patwa Tola in Panchayat Hajari under Gomia Block District Bokaro |
Gumia Block |
HAZARI |
39.43 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
82 |
2022-23 |
DMFT00486 |
Repair of Community Health Centre, Gomia |
Gumia Block |
GOMIA |
92.99 |
District Engineer, Zilla Parishad, Bokaro |
YetToStart |
83 |
2023-24 |
DMFT00748 |
Construction of 1.05 KM road from REO road Lalpania, Beldih Chowk Etoram Kisku's house to REO main road Mithun Hembram's house via Beldih Bich tola. |
Gumia Block |
BARKI PUNU |
94.62 |
Executive Engineer, Rural Work Division, Bokaro |
YetToStart |
84 |
2023-24 |
DMFT00822 |
Construction of Panchayat Bhawan at Siyari GP of Gomia Block |
Gumia Block |
SIYARI |
99.89 |
Executive Engineer, Building Division, Bokaro |
YetToStart |
85 |
2023-24 |
DMFT00823 |
Construction of Panchayat Bhawan at Lalpaniya GP of Gomia Block |
Gumia Block |
LALPANIYA |
99.89 |
Executive Engineer, Building Division, Bokaro |
YetToStart |
86 |
2023-24 |
DMFT00824 |
Construction of Panchayat Bhawan at Tikahara GP of Gomia Block |
Gumia Block |
TIKAHARA |
99.89 |
Executive Engineer, Building Division, Bokaro |
YetToStart |
87 |
2023-24 |
DMFT00825 |
Construction of Panchayat Bhawan at Goniyato GP of Gomia Block |
Gumia Block |
GONIYATO |
99.89 |
Executive Engineer, Building Division, Bokaro |
YetToStart |
88 |
2022-23 |
DMFT00326 |
Construction work of Dinning Hall and PCC Work Kasturba Gandhi Girls Hostel Building at Gomia, Bokaro |
Gumia Block |
GOMIA |
24.92 |
Executive Engineer, Building Division, Bokaro |
Completed |
89 |
2022-23 |
DMFT00327 |
Renovation of Kastuba Gandhi Girls hostel Building at Gomia, Bokaro |
Gumia Block |
GOMIA |
24.82 |
Executive Engineer, Building Division, Bokaro |
Completed |
90 |
2022-23 |
DMFT00346 |
Construction of ECO park in Chharchhariyan Dham (Luguburu Dham) pond of kodwa tand GP under Gomia Block |
Gumia Block |
KODWA TAND |
83.34 |
Executive Engineer, MI Division, Bokaro |
Completed |
91 |
2022-23 |
DMFT00348 |
BALA Painting at Upgraded Middle School, Pipradih |
Gumia Block |
SAWANG SOUTH |
8.88 |
Trinetra Enterprises, Hazaribagh |
Completed |
92 |
2022-23 |
DMFT00350 |
BALA Painting at Middle School, Gumia |
Gumia Block |
PALIHAARI GURUDIH |
10.80 |
Trinetra Enterprises, Hazaribagh |
Completed |
93 |
2022-23 |
DMFT00353 |
BALA Painting at Primary School, Kaswagada |
Gumia Block |
KHAMHARA |
11.12 |
Trinetra Enterprises, Hazaribagh |
Completed |
94 |
2022-23 |
DMFT00365 |
BALA Painting at Upgraded Middle School, Punnu, Gomia |
Gumia Block |
GOMIA |
12.25 |
Trinetra Enterprises, Hazaribagh |
Completed |
95 |
2022-23 |
DMFT00370 |
BALA Painting at +2 High School, Gomia |
Gumia Block |
GOMIA |
13.78 |
Trinetra Enterprises, Hazaribagh |
Completed |
96 |
2022-23 |
DMFT00381 |
Construction of 16 nos of Additional Classroom and 2 nos of Multipurpose rooms in 10+2 High School, Gumia under Gumia Block |
Gumia Block |
GOMIA |
364.35 |
Executive Engineer, Building Division, Bokaro |
Ongoing |
97 |
2022-23 |
DMFT00407 |
Supply of 50 nos of Bunk beds in the hostel of Kasturba Gandhi girls residential schools, Gumia |
Gumia Block |
SARHACHIYA |
12.99 |
M/s Prakash Xerox, Bokaro |
Completed |
98 |
2022-23 |
DMFT00503 |
Construction of Playground under the scheme of Veer Shaheed Poto ho at Putkadih of Badkiputru Tola |
Gumia Block |
BADKI CHIDRI |
5.26 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
99 |
2022-23 |
DMFT00504 |
Construction of Playground under the scheme of Veer Shaheed Poto ho at Dhadri of Badki Punnu |
Gumia Block |
BADKI CHIDRI |
5.26 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
100 |
2022-23 |
DMFT00505 |
Construction of Playground under the scheme of Veer Shaheed Poto ho behind of ungraded middle school in bandh |
Gumia Block |
BANDH |
5.26 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
101 |
2022-23 |
DMFT00506 |
Construction of Playground under the scheme of Veer Shaheed Poto ho at Israel Ansari High School of Jhirke |
Gumia Block |
JHIRKE |
5.26 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
102 |
2022-23 |
DMFT00507 |
Construction of Playground under the scheme of Veer Shaheed Poto ho at new primary school of siyari |
Gumia Block |
SIYARI |
5.26 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
103 |
2022-23 |
DMFT00508 |
Construction of Playground under the scheme of Veer Shaheed Poto ho at Belhor dera of Kaso |
Gumia Block |
SIYARI |
5.26 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
104 |
2022-23 |
DMFT00509 |
Construction of Playground ground leveling work under the scheme of Veer Shaheed Poto ho of sindhu kandu in Kasiadih village |
Gumia Block |
TIKAHARA |
5.26 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |
105 |
2022-23 |
DMFT00510 |
Construction of Playground under the scheme of Veer Shaheed Poto ho at Dania village |
Gumia Block |
TILAIYA |
5.26 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
106 |
2022-23 |
DMFT00511 |
Construction of Playground under the scheme of Veer Shaheed Poto ho at Modha village |
Gumia Block |
TILAIYA |
5.26 |
Executive Engineer, Rural Development Special Division, Bokaro |
Ongoing |
107 |
2022-23 |
DMFT00530 |
Construction of Playground under the scheme of Veer Shaheed Poto ho at badki pannu |
Gumia Block |
BADKI CHIDRI |
5.26 |
Executive Engineer, Rural Development Special Division, Bokaro |
Completed |