Project List
S.No. Financial Year Project Name Block Name Gram Panchayat Name Sancition Amount (Lakh) Status
1 2023-24 Construction of AWC Building at , village - Ukrid South Panchayat - Ukrid Chas Block Ukrid 11,72,600.00 Yet to Start
2 2023-24 Construction of AWC Building at , village - Ukrid North Panchayat - Ukrid Chas Block Ukrid 11,72,600.00 On going
3 2023-24 Installation of Three Units of Lift iat Sadar Hospital, Bokar Bokaro District Bokaro District 31,86,000.00 Completed
4 2023-24 Constrution of PCC road and Guard wall from house of Murli Yadav to Gomiya panchayat bhavan in panchayat Gomiya under block Gomia Gumia Block Gumia Block 47,96,000.00 Completed
5 2023-24 Construction of CLF Building at Panchayat - Bhalmara Nawadih Block Bhalmara 65,82,800.00 Completed
6 2023-24 Construction of CLF Building at Panchayat - Laghla Chandankiyari Block Laghla 65,82,800.00 Completed
7 2023-24 Construction of CLF Building at Panchayat - Batbinor Chandankiyari Block Batbinor 65,82,800.00 Completed
8 2023-24 Construction of CLF Building at Panchayat - Boryadih Chandankiyari Block Boriyadih 65,82,800.00 Completed
9 2023-24 Construction of CLF Building at Panchayat - Pindrajora Chas Block Pindrajora 65,82,800.00 Completed
10 2023-24 Construction of CLF Building at Panchayat - Pupunki Chas Block Pupunki 65,82,800.00 On going
11 2023-24 Construction of CLF Building at Panchayat - Tarmi Chandrapura Block Tarmi 65,82,800.00 On going
12 2023-24 Construction of CLF Building at Panchayat - Telo Middle Chandrapura Block Telo Middle 65,82,800.00 On going
13 2023-24 Construction of CLF Building at Panchayat - Govindpur - E Bermo Block Govindpur E 65,82,800.00 On going
14 2023-24 Construction of CLF Building at Panchayat - Mahuatand Gumia Block Mahua Tand 65,82,800.00 On going
15 2023-24 Construction of Road in Degree College, Gomia Gumia Block Gumia Block 24,99,700.00 Completed
16 2023-24 Construction of PCC Road, from Kalachand Mahto House to Lakhan Mahto House at Tantari South Panchayat, in Jaridih Block Jaridih Block Tatri South 17,96,200.00 Completed
17 2023-24 Construction of PCC Road from Sangajori Hari Madir to Kushal Bnadh Mhavir Mandir in Bhawanipur Panchayat Chas Block Bhawanipur 30,90,700.00 On going
18 2023-24 Construction of Boundary wall at UMS Narayanpur under Chas Block, Bokaro Chas Block Chas Block 21,80,800.00 On going
19 2023-24 Renovation of School Building & Construction of Additional Class room in 1st & 2nd floor at Rajkiye Madhya Vidhyalaya, New Bhagalapur, Phusro, Bokaro Bermo Block Phusro 98,82,500.00 On going
20 2023-24 Construction of PCC Road from Mukesh Ravidas House to Cricket Ground in Bandh Panchayat, Gomia Block Gumia Block Bandh 61,59,700.00 On going
21 2023-24 Construction of AWC building at Muslim Tola Angwali North Peterwar Block Angwali North 11,72,600.00 Yet to Start
22 2023-24 Construction of CLF building at Panchayat Angwali North Peterwar Block Angwali North 65,82,800.00 Completed
23 2023-24 Construction of Cow shed, poultry shed, Pever block road in Kasmar block Kasmar Block Kasmar Block 65,43,700.00 On going
24 2023-24 Redevelopment and various work of black smith training and productioion center at Bhendra under Nawadih block, Bokaro Nawadih Block Bhendra 21,10,100.00 On going
25 2023-24 Repair of shed, wall, and school building under village Suturghutu, panchayat Arjua, block Petwar Peterwar Block Arjuba 15,37,600.00 Completed
26 2023-24 BALA Painting at Rajykiyakrit Middle School, Bermo (Jaridih Bazar) Bermo Block Bermo East 20,96,000.00 Completed
27 2023-24 BALA Painting at Middle and High School, Chas Sonabad Chas Block Sonabad 65,82,800.00 Completed
28 2023-24 Construction of AWC building at Harijan Tola of Dugda East GP under Chandrapura Block Chandrapura Block Dugda East 11,72,600.00 On going
29 2023-24 Construction of AWC building at Turi Tola of Dugda East GP under Chandrapura Block Chandrapura Block Dugda East 11,72,600.00 On going
30 2023-24 Renovation of Pond Gobar Gadda part 1 at Jaridih West Panchayat in Bermo Block Bermo Block Jaridih West 7,73,000.00 Completed
31 2024-25 Renovation of MTC Center in Peterwar Block Peterwar Block Peterwar 10,15,300.00 Completed
32 2024-25 Construction of PPC Road and Sewer with Dhakkan at Khetko Panchayat from Madarsa to Paratand via Domuhan Peterwar Block Khetko 1,52,28,500.00 On going
33 2024-25 Setting up Mathematics & Science Labs in ten government schools Bokaro District Bokaro District 5,30,988.00 Completed
34 2024-25 One Year Salary Payment of Engaged support staff (doctors, paramedical staff & etc.) around District. (Phase-1) Bokaro District Bokaro District 56,97,176.00 Completed
35 2024-25 Construction of PCC at ward - 12 Khutri Panchayat, Jaridih Bolack from Sanjay Singh House Godamdih to Main Road Jaridih Block Khutri 75,25,100.00 On going
36 2024-25 Construction of guard wall on Khalcho Road, in front of Arjun Mahto Farm, at Telo west Panchayat in Chandrapura Chandrapura Block Telo West 24,66,500.00 Completed
37 2024-25 Construction of guard wall in Paplo Panchyat in Chandrapura from Shiv Mandir to Student Club Chandrapura Block Paplo 33,47,500.00 On going
38 2024-25 Construction of guard wall at Khelcho Joriya in Telo East Panchyat in Chandrapura Chandrapura Block Paplo 37,76,000.00 On going
39 2024-25 Construction of Classroom in Middle School at Swang Gumia Block Sawang North 1,60,26,900.00 On going
40 2024-25 Construction of Classroom in Middle School at Hosir Gumia Block Hosir East 1,43,57,500.00 On going
41 2024-25 Construction of Boundary wall, Gallary, Toilet and Painting at High School, Bandhadih in Jaridih Block Jaridih Block Badhadih 31,82,100.00 Completed
42 2024-25 Construction of Boundary wall, Gallary and Leveling of Play Ground at High School, Jarangdih in Bermo Block Bermo Block Jarangdih North 42,66,500.00 Completed
43 2024-25 Construction of Boundary wall, at High School, Kurpaniya in Bermo Block Bermo Block Kurpaniya 20,96,000.00 Completed
44 2024-25 Construction of PCC Road at Phusro Municipal, from Makoli Kanta to Karipani Municipal Council Phusro Municipal Council Phusro 44,23,000.00 Completed
45 2024-25 Construction of PCC Road from Dhamni to Kochagoda at Dhiyari Panchayat in Nawadih Block Nawadih Block Dahiyari 1,44,51,200.00 On going
46 2024-25 Construction of RCC Bridge between Tara Beda & Bandhu Beda at Bermo Block in Phusro Municipal Bermo Block Bermo Block 89,60,100.00 On going
47 2024-25 Construction of Road between Koriyabeda to Guhiyagadda at Kachho Panchyat in Nawadih Block Nawadih Block Kacho 1,65,76,300.00 On going
48 2024-25 Blocking both sides of the road from Tilaka Mnjhi Chowk to Jaridih Thana Jaridih Block Jaina 4,91,01,200.00 On going
49 2024-25 Blocking both sides of the road from Tilak Mnjhi Chowk to Jaridih Aryan Hotel Jaridih Block Jaina 4,10,45,000.00 On going
50 2024-25 Blocking both sides of the road from Four Laine Chowk to Tilak Mnjhi Chowk Jaridih Block Jaina 1,16,45,300.00 On going
51 2024-25 Pending Payment of Supply of COVID-19 Protection Kit at Sadar Hospital Bokaro District Bokaro District 2,89,14,300.00 Completed
52 2024-25 Pending Payment of Supply of COVID-19 Medicines at Sadar Hospital Bokaro District Bokaro District 2,82,80,000.00 Completed
53 2024-25 Training for marginalized youths to enhance their employability skills in electronic sector Bokaro District Bokaro District 4,97,20,000.00 On going
54 2024-25 Training program for youth to develop a skilling ecosystem in Farm Mechanization Bokaro District Bokaro District 4,92,18,587.00 On going
55 2024-25 Training Program for creating women Agri Entrepreneur & Professionals and Service Providers Bokaro District Bokaro District 4,96,32,183.00 On going
56 2024-25 Construction of PCC Raod with covered drain from house of Bharat Sahu to House of Purusottam Jha Chandrapura Block Chandrapura Block 1,82,33,200.00 Completed
57 2024-25 Deatiled Project Report of Water Supply of Gomia Degree College, under Gomia DW&S Division, Tenughat. Gumia Block Gumia Block 2,60,43,850.00 On going
58 2024-25 Training for marginalized youths to enhance their employability skills in the Instrumentation, Automation, Surveillance and Communication Sector Bokaro District Bokaro District 4,97,74,000.00 On going
59 2024-25 construction of PCC Road from Majhi Tola to Chaita Pull Ghat in Telo East Pnchayat Chandrapura Block Telo East 74,76,100.00 Completed
60 2024-25 Construction of Building of Rajendra Bhawan (Mahila Vradha Ashram) at Baradih Uper Tola in Baradih Panchayat Jaridih Block Baradih 91,49,700.00 On going
61 2024-25 Construction of Guardwall of Godan Gop Khet at Arjuba Panchayat - (350 Feet) Peterwar Block Arjuba 32,94,800.00 On going
62 2024-25 Construction of PPC Road and Bridge at Baluwadih Village in Baradih Panchayat Jaridih Block Baradih 85,78,900.00 On going
63 2024-25 Construction of PCC Road from Bahadurpur Bank of India to Trimurti Public School in Baradih Panchayat Jaridih Block Baradih 51,11,800.00 Completed
64 2024-25 Construction of Indoor Stadium at High School of Dhori Panchayat Bermo Block 3,87,90,827.00 On going
65 2024-25 Construction of RCC Sewer near JN Inter College in Jaina Panchayat Jaridih Block jaina 1,40,68,900.00 On going
66 2024-25 Construction of Panchyat Sachivalay building at Panchyat - Karma Tand Chandrapura Block Karma Tand 99,89,000.00 Completed
67 2024-25 Construction of Sefty Tank at Rajendra Prasad Football Stadium at Dhori in Phusro Bermo Block Phusro 4,80,43,879.00 On going
68 2024-25 Construction of Pavilion at Rajendra Singh Football Stadium at Dhori, Phusro Bermo Block Phusro 4,96,76,073.00 On going
69 2024-25 Construction of PCC Road, between Mahaveer Sthan to Khas Mahal Colony Via Rai Sahan File in Kurpania Panchayat Bermo Block Kurpaniya 4,94,50,100.00 On going
70 2024-25 Construction of Road between Baradih to Paratand at Baradih Panchayat Jaridih Block Baradih 2,04,24,500.00 Yet to Start
71 2024-25 Construction of PCC between Jarangdih Over Bridge to Banaso Mandir in Bermo Block Bermo Block Bermo Block 23,05,100.00 Completed
72 2024-25 Construction of PCC Road between Bahar Cinema Hall to Panchayat via Imambada in Kurpania Panchayat Bermo Block Kurpaniya 24,95,600.00 Completed
73 2024-25 Construction of Boundary Wall of Upper Middle School, Sarhachiya in Gomia Block Gumia Block Sarhachiya 23,76,800.00 Completed
74 2024-25 Construction of PCC Road to connect Chilgadda Panchayat and Gopalpur in Chilgadda Panchayat Jaridih Block Chilgadda 64,19,500.00 On going
75 2024-25 Supply of ANC Bed, Examination Table , Screen Seperater & Foot Step Bokaro District 4,98,68,039.00 Completed
76 2024-25 Construction of Gurdwall Besides Godonala between Sumit Kesari House to Raja Ansari House at Jaridih panchayat in Bermo Block Bermo Block Jaridih East 20,08,100.00 On going
77 2024-25 Construction of Slab & Sewer Besides Upendra Gupta House to Deshraj Bhatia House at Jaridih panchayat in Bermo Block Bermo Block Jaridih East 8,39,900.00 On going
78 2024-25 Construction of PCC Road Between Hoter Park to Nandlal Mahto House at Jaina Panchayat in Jaridih Block Jaridih Block Jaina 16,07,000.00 Completed
79 2024-25 Construction of PCC Road Between Laxmi Sigh House, Rajput Tola to Kashinath Singh House at Jaina Panchayat in Jaridih Block Jaridih Block Jaina 18,72,000.00 Completed
80 2024-25 Construction of PCC Road till Dugda Basti Durga Mandir at Dugdha East Panchayat in Chandrapura Block Chandrapura Block Dugda East 98,41,100.00 Completed
81 2024-25 Construction of PCC Road between Bokaro Jharia Thana OP to New Samudayik Bhawan at Karmatand Panchayat in Chandrapura Chandrapura Block Karma Tand 11,41,400.00 Completed
82 2024-25 Renovation of Aditional Classrooms in Rajkikrit +2 High School Chandrapura Block Dugda East 63,08,500.00 On going
83 2024-25 Renovation of Aditional Classrooms in Rajkikrit +2 High School Bermo Block Bermo Block 63,08,500.00 On going
84 2024-25 Renovation of Aditional Classrooms in Rajkikrit +2 High School Chandrapura Block Taranga 63,08,500.00 On going
85 2024-25 Construction of Boundary wall of +2 High School Chandrapura Block Taranga 60,42,250.00 On going
86 2024-25 Construction of Boundary wall of +2 High School Chandrapura Block Bandio 37,58,820.00 On going
87 2024-25 Construction of Boundary wall of Middle School Chandrapura Block Dugda East 27,58,320.00 Completed
88 2024-25 Construction of Boundary wall of UPG Rajkiyekrit Middle School Telo at Telo Middle Panchyat Chandrapura Block Telo Middle 16,18,070.00 Completed
89 2024-25 Installation of Hand Wash (Wash Basins) at Rakiyekrit Middle School Koilyari in Bermo South Bermo Block Bermo South 5,29,600.00 On going
90 2024-25 Installation of Hand Wash (Wash Basins) at Rakiyekrit Middle School Subhas Nagar, Phusro Bermo Block Phusro 5,29,600.00 On going
91 2024-25 Installation of Hand Wash (Wash Basins) at UPG Primary School Nawatand Bermo Block Armo 5,29,600.00 On going
92 2024-25 Installation of Hand Wash (Wash Basins) at Rakiyekrit Middle School, Telo (Girls) in Telo Middle Chandrapura Block Telo Middle 5,29,600.00 Completed
93 2024-25 Installation of Hand Wash (Wash Basins) at Rakiyekrit Middle School, Paplo in Paplo Panchayat Chandrapura Block Paplo 5,29,600.00 Completed
94 2024-25 Installation of Hand Wash (Wash Basins) at UPG Primary School, Karmatand Chandrapura Block Karma Tand 5,29,600.00 Completed
95 2024-25 Construction of Drinking Water Facility at UPG Primary School, Bhalgadha in Telo East Panchayat Chandrapura Block Telo East 5,29,600.00 Completed
96 2024-25 Installation of Hand Wash (Wash Basins) at Rakiyekrit Middle School, Phusro Bazar Bermo Block Phusro 1,50,600.00 Completed
97 2024-25 Construction of Shade & Beautification work of Ambedkar Chowk, Asanatand at Barai Panchayat in Nawadih Block Nawadih Block Barai 10,00,000.00 Completed
98 2024-25 Construction of PCC Road ( 1000 Mtr.) between Fagu Ravidas House to Bahadur Ghasi House at Barai Panchayat Nawadih Block Barai 45,21,600.00 On going
99 2024-25 Construction of PCC Road between Simrabera Pul to Mandir at Birni Panchayat Nawadih Block Birni 36,54,000.00 On going
100 2024-25 Construction of PCC Road between Barmasiya Mahru Mahato House to Bijli Bandh Tola Nawadih Block Birni 47,36,700.00 Completed
101 2024-25 Construction of Boundary Wall Utkrimit Rajkiyakrit, Gunjardih, Nawadih Block Gunjardih 24,99,800.00 On going
102 2024-25 Construction of 1100 ft PCC Road between Bhola Yadav House to Uper Tola at Gairwadih Gumia Block Hazari 24,18,197.00 Completed
103 2024-25 Construction of 1130 ft PCC Road between Kamal Tola to Talab at Bandh Panchayat Gumia Block Bandh 24,84,158.00 Completed
104 2024-25 Construction of 4264 ft PCC Road Main Road Jamakdih to Tenughat Kinara at Lalpaniya in Hosir West Panchayat Gumia Block Lalpaniya 93,75,618.00 Completed
105 2024-25 Construction of 3200 ft PCC Road between Padariya Basti to Bokaro River Shamshan Ghat at Gomia Block Gumia Block Gomia 90,44,372.00 Completed
106 2024-25 Construction of 2952 ft PCC Road between Hemlata Rajbhar House to Bhagalpur Tola at Bandh Panchayat in Gomia block Gumia Block Bandh 99,43,931.00 Completed
107 2024-25 Construction of 3000 ft PCC Road & 200 ft Guard wall between Bandhan Lohar House to Bandh Colony via Partand Gumia Block Bandh 77,56,053.00 Completed
108 2024-25 Construction of PCC Road & Guard wall between Murli Yadav House to Panchayat Bhawan Gumia Block Gomia 45,05,977.00 Completed
109 2024-25 Supply of Books for Public Libraries 09 blocks Bokaro District Bokaro District 1,55,29,532.80 Completed
110 2024-25 Construction of PCC Road Between Birendra Sab House to Harijan Basti at Govindpur - A Panchayat in Bermo Block Bermo Block Govindpur A 7,64,600.00 Completed
111 2024-25 Construction of PCC Road Between Noori Nagar to Harijan Basti at Govindpur - A Panchayat in Bermo Block Bermo Block Govindpur A 21,34,800.00 On going
112 2024-25 Construction of PCC Road Between Sunil Sab House to Harijan Basti Pond at Govindpur - A Panchayat in Bermo Block Bermo Block Govindpur A 80,18,800.00 On going
113 2024-25 Construction of Boundary Wall & Leveling of Ground Near Panchayat Bhawan at Govindpur - A Panchayat in Bermo Block Bermo Block Govindpur A 37,87,000.00 On going
114 2024-25 Construction of Sewer with Dakkan bewteen Kurban Ansari House, Noori Nagar to Sujeet Ram House, Lal Chowk at Govindpur - A Panchayat in Bermo Bermo Block Govindpur A 62,42,700.00 On going
115 2024-25 Spread of Pavel Blocks beside Punch Mandir of Bokaro Thermal Bermo Block Govindpur A 30,79,900.00 Completed
116 2024-25 Construction of Guardwall of Niche Nala at Central Colony Durga Madap (250 Mtr. & 800 Mtr.) Bermo Block Ward No. 7 40,11,900.00 Yet to Start
117 2024-25 Construction of PCC Road between Rathtand Kali Madir to Jamakdih Bajrang Bali Madir Gumia Block Hosir West 54,84,896.00 On going
118 2024-25 Construction of PCC Road between Nainatand Sunil Yadav House to Tenughat Main Road Gumia Block 60,84,437.00 Yet to Start
119 2024-25 Construction of PPC Road between 03 No. Colony to Primary School Gumia Block Kathara 71,05,716.00 On going
120 2024-25 Construction of PPC Road between Panchayat Bhawan to Damodar River Shamshan Ghat Gumia Block Jhirke 99,44,263.00 Yet to Start
121 2024-25 Construction of PPC Road from Gajhudih to Mahavir Sthan at Gomia block Gumia Block Sawang North 95,79,317.00 On going
122 2024-25 Construction of PPC Road from Peepradih panch mandir to Karmatiya at Gomia block Gumia Block Sawang North 93,35,243.00 Yet to Start
123 2024-25 Construction of PPC Road between Degree College Mod to Degree College Main Road Gumia Block Gomia 24,97,233.00 Yet to Start
124 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 4,87,92,758.00 Completed
125 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 4,98,92,795.00 Completed
126 2024-25 Installation of 75 Lightning Conductor in Schools Bokaro District Bokaro District 3,60,00,000.00 Completed
127 2024-25 Implementation of a Coaching Project for Prepration of Competitive Exams & Government Services Exams for the students from Disadvantaged communities of Mining Bokaro District Bokaro District 4,57,88,000.00 On going
128 2024-25 Establishment of a Training Center cum Prodction unit to generate livelihood of 400 Women of SHGs & Belong from SC/ST/OBC/EWS category in Jainmore Cluster Jaridih Block jaina 4,89,86,000.00 On going
129 2024-25 Supply of 16 set of LED Van Bokaro District Bokaro District 2,99,56,256.00 Completed
130 2024-25 The hiring of 2 advertising vehicles and Covid awareness Bokaro District Bokaro District 25,91,280.00 Completed
131 2024-25 Installtion of Modular OT in 3 Blocks (CHC Jaridih, CHC Peterwar & SDH Bermo) Bokaro District Bokaro District 2,22,55,262.00 Completed
132 2024-25 Bala Painting at 16 (High & Middle) Schools Bokaro District Bokaro District 2,71,45,772.00 Completed
133 2024-25 Construction of Road Subhash Nagar Dampping to Jawahar Nagar Durga Mandir in Phusro Bermo Block Phusro 46,90,900.00 On going
134 2024-25 Construction of Road between Savita Medical to Subhash Nagar Shiv Mandir Via Durga Mandir in Phusro Bermo Block Phusro 43,50,600.00 On going
135 2024-25 Construction of Sport Complex Chas Block Chas Block 9,31,97,000.00 Yet to Start
136 2024-25 Constrution of Bridge between Banchas & Bahadurpur Jaridih Block Jaridih Block 3,86,46,700.00 On going
137 2024-25 Construction of PCC between Kali Singh House to Shamshan Ghat, Nutandih Via Mishra Tola Jaridih Block Tatri North 1,67,43,700.00 On going
138 2024-25 Construction of Road between Litatand Bridge to Pipartand Main Road, at Pichhri South(1.50 KM) Peterwar Block Tatri South 1,31,59,100.00 Completed
139 2024-25 Establishment of a Training Center cum Prodction unit to generate livelihood of 400 Women of SHGs & Belong from SC/ST/OBC/EWS category in Bermo Cluster Bermo Block Bermo Block 4,89,86,000.00 On going
140 2024-25 Construction of Road Jainamod Block road Durga Mandir Beside of Vastralay via Block office to Tetraiya Mod in Jaridih Block Bandhadih North Panchayat Jaridih Block Bandhdih North 79,44,100.00 On going
141 2024-25 Construction of PCC Bhawnipur Solagidih (1500 Feet) Chas Block Bhawanipur 92,22,900.00 On going
142 2024-25 Construction of Road between Four lane Road to Co-Operative via Police Colony Chas Block Ukrid 72,79,700.00 Completed
143 2024-25 Construction of Seaver in Mango Kewatdih to Uper Kulhari Chas Block Mango 59,73,200.00 Completed
144 2024-25 Construction of School Building of SS Balika High School in Bhawanipur Chas Block Bhawanipur 49,69,000.00 Yet to Start
145 2024-25 Construction of PCC between REO Road to Isree River at Barwadih in Chandankiyari, Block Chandankiyari Block Badajor 85,61,300.00 Completed
146 2024-25 Construction of PCC between Sawaldih Gram to Mantand REO Chandankiyari Block Badajor 64,14,700.00 On going
147 2024-25 Construction of PCC between Utkrimit Madhya Vidhyalaya Kaduaameetha to REO Road Rewani via Sawldih Chandankiyari Block Badajor 22,94,100.00 Completed
148 2024-25 Construction of Changing Room & Boundary Wall of Dugda Football Ground Chandrapura Block Dugda East 2,06,02,000.00 Yet to Start
149 2024-25 Renovation of MTC Center in Gomia Block Gumia Block Gomia 12,18,000.00 Completed
150 2024-25 Renovation of MTC Center in Bermo Block Bermo Block Bermo East 9,83,300.00 Completed
151 2024-25 Renovation of MTC Center in Chas Block Chas Block Chas Block 24,91,300.00 Completed
152 2024-25 Bala Painting in 1186 AWC centers (Kasmar -105, Jaridih- 99, Gomia - 176, Chas-80, Bermo-52, Nawadih - 142, Chandrapura - 82 Peterwar - 142) Bokaro District Bokaro District 6,65,15,139.00 Completed
153 2024-25 Designing, Engineering, Supply, Installation, and Testing, of High Mast Light of 12 Mtr./ 16 mtr. (18 Units) Chandankiyari Block Chandankiyari Block 1,65,67,200.00 Completed
154 2024-25 Training & Placement of candidates in (MEP/N9991 v1.0) Basic English For Employability & MS Office (Target 750 candidates) Bokaro District Bokaro District 25,13,400.00 On going
155 2024-25 Training & Placement of candidates in MS Office, English Speaking & Graphic Designers (MES/Q0601) (Target 600 candidates) Bokaro District Bokaro District 2,20,65,528.00 Completed
156 2024-25 Training & Placement of candidates in Basic English For Office executive Tally Beginner to Advance MS Office (Target 900 candidates) Bokaro District Bokaro District 2,79,92,090.00 Completed
157 2024-25 Training & Placement of candidates in course (MEP/Q0207)h For Office Operation Executive short hand typing, Hindi & English Typing, Steno & MS Office (Target 750 candidates) Bokaro District Bokaro District 2,64,02,028.00 On going
158 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 4,27,99,308.00 Completed
159 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 5,91,59,335.00 Completed
160 2024-25 Supply of Ambu Bags, Weighing Scale, Hemoglobinmeter, Hemoglobin meter strip Bokaro District Bokaro District 4,79,98,788.00 Completed
161 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 3,82,91,046.00 Completed
162 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 4,75,84,680.00 Completed
163 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 3,64,75,912.00 Completed
164 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 4,63,78,672.00 Completed
165 2024-25 Supply the weight Machines, Thermometer, BP Meter, Hemoglobin, Hemoglobin Strip, Ambu Bag, Nebulizer etc. Bokaro District Bokaro District 4,72,03,020.00 Completed
166 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 4,85,35,512.00 Completed
167 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 3,92,72,854.00 Completed
168 2024-25 Supply, Installation, Maintenance of 2 HP & 5 HP Solar Lift in 41 locations Bokaro District Bokaro District 3,63,06,074.00 Completed
169 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 4,82,49,550.00 Completed
170 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 4,83,41,708.00 Completed
171 2024-25 Supply the weight Machines, Thermo meter, BP Meter, Hemoglobin, Hemoglobin Strip Bokaro District Bokaro District 4,83,08,964.00 Completed
172 2024-25 Supply, Installation, Maintenance of VR Lab in 19 Schools Bokaro District Bokaro District 4,74,18,300.00 Completed
173 2024-25 Supply, Installation, Maintenance of VR Lab in 20 Schools Bokaro District Bokaro District 4,99,14,000.00 Completed
174 2024-25 Supply, Installation, Maintenance of VR Lab in 20 Schools Bokaro District Bokaro District 4,99,14,000.00 Completed
175 2024-25 Supply & installation of 173, GPS Based Face Recognition System Bokaro District Bokaro District 1,19,85,440.00 Completed
176 2024-25 Upgradation of Kasturaba Gandhi Residential School into Smart Model Residential School Bermo, Peterwar, Nawadih & Jaridih Bokaro District Bokaro District 2,37,24,147.00 Completed
177 2024-25 Upgradation of Kasturaba Gandhi Residential School into Smart Model Residential School in Jeridih, Nawadih and Peterwar block Bokaro District Bokaro District 4,59,88,631.00 Completed
178 2024-25 Supply of Chair, Table, Fans & Almira FOR 9 block libraries Bokaro District Bokaro District 30,88,350.00 Completed
179 2024-25 Supply of Ambu Bags, Weighing Scale, Hemoglobinmeter, Hemoglobin meter strip, Digital B.P Instrument, Digital Thermo Meter, Neubilizer Bokaro District Bokaro District 4,81,57,392.00 Completed
180 2024-25 Supply of BP Meter, Hemoglobin Meter, Hemoglobin Strip, Thermo meter Bokaro District Bokaro District 4,79,31,600.00 Completed
181 2024-25 Supply of BP Meter, Hemoglobin Meter, Hemoglobin Strip, Thermo meter Bokaro District Bokaro District 4,70,91,440.00 Completed
182 2024-25 Supply of Ambu Bags, Weighing Scale, Hemoglobinmeter, Hemoglobin meter strip, Digital B.P Instrument, Digital Thermo Meter, Neubilizer Bokaro District Bokaro District 4,81,87,706.00 Completed
183 2024-25 Supply of Ambu Bags, Weighing Scale, Hemoglobinmeter, Hemoglobin meter strip, Digital B.P Instrument, Digital Thermo Meter, Neubilizer Bokaro District Bokaro District 4,80,05,822.00 Completed
184 2024-25 Supply of Ambu Bags, Weighing Scale, Hemoglobinmeter, Hemoglobin meter strip, Digital B.P Instrument, Digital Thermo Meter, Neubilizer Bokaro District Bokaro District 4,85,57,000.00 Completed
185 2024-25 upgradation of Upper Primary Schools into Smart Model Upper Primary Schools in Gomia & Bermo Bokaro District Bokaro District 4,55,65,178.00 Completed
186 2024-25 upgradation of 20 Primary Schools into Smart Primary Schools Bokaro District Bokaro District 4,99,73,260.00 On going
187 2024-25 Supply, Installation, Maintenance of 2 HP Solar Lift in 18 locations Bokaro District Bokaro District 1,37,14,344.00 On going
188 2024-25 Supply of Generator in 46 Panchyats of Bokaro district Bokaro District Bokaro District 3,66,86,200.00 Completed
189 2024-25 Supply, Installation & Maintenance of Air Pollution Monitoring & Surveillance Systems in Bokaro Bokaro District Bokaro District 4,98,98,778.00 Completed
190 2024-25 Establishment of Modular Kitchen in Chas KGBV Bokaro District Bokaro District 69,08,714.00 Completed
191 2024-25 Establishment of Modular Kitchen in Kasmar KGBV Bokaro District Bokaro District 73,41,228.00 Completed
192 2024-25 Establishment of Modular Kitchen in Chadankiyari KGBV Bokaro District Bokaro District 65,57,240.00 Completed
193 2024-25 Establishment of Modular Kitchen in Gomia KGBV Bokaro District Bokaro District 72,20,164.00 Completed
194 2024-25 Establishment of Modular Kitchen in Nawadih KGBV Bokaro District Bokaro District 59,54,000.00 Completed
195 2024-25 upgradation of Upper Primary Schools into Smart Model Upper Primary Schools (Jaridih-33, Kasmar - 33 & Nawadih - 50) Bokaro District Bokaro District 4,90,59,210.00 Completed
196 2024-25 Construction of PCC Road of Ukrid Mod Via ward no.- 4 Transformer & Jaip - 4 road in Ukrid Panchayat Chas Block Ukrid 80,65,700.00 On going
197 2024-25 Construction of PCC Road between Damodar River Tat to Shamshan Ghat Shade in Pupunki panchayat Chas Block Pupunki 36,36,400.00 On going
198 2024-25 Construction of PCC Road between Kartik Chandra Upper School Chikitsiya ke gate and Pradhanmantri Gram Sadak Yojana Chas Block Kalapathar 23,98,400.00 Completed
199 2024-25 Supply of Ambu Bags, Weighing Scale, Hemoglobinmeter, Hemoglobin meter strip, Digital B.P Instrument, Digital Thermo Meter, Neubilizer Bokaro District Bokaro District 4,78,83,220.00 Completed
200 2024-25 Supply, Installation, Maintenance of VR Lab in 20 Schools Bokaro District Bokaro District 4,99,14,000.00 Completed
201 2024-25 Supply, Installation, Maintenance of VR Lab in 20 Schools Bokaro District Bokaro District 4,74,18,300.00 On going
202 2024-25 Development Training Program for creating women Agri Entrepreneur & Professional and Sefrvice Providers in the Agriculture sector in boakro district Bokaro District Bokaro District 4,96,32,910.00 On going
203 2024-25 Designing, Engineering, Supply, Installation, and Testing, of High Mast Light of 12 Mtr./ 16 mtr. (42 Units) Gumia Block Gumia Block 3,86,56,800.00 On going
204 2024-25 Installation of 470 Lightning Conductors in Schools ( Chandrapura & Peterwar) Bokaro District Bokaro District 8,46,00,000.00 Completed
205 2024-25 Supply, of 62.5 KVA DG Set Generator in Kasturba Gandhi Girls School Nawadih Block Nawadih Block 13,50,000.00 Completed
206 2024-25 Supply of learning Kits in 2260 Government AWC in Bokaro district Bokaro District Bokaro District 6,55,40,000.00 On going
207 2024-25 Supply of Installation & Maintenance of Tab Lab in 60 Government school of Bokaro Bokaro District Bokaro District 4,98,07,800.00 Completed
208 2024-25 Bala in 180 Schools in all 9 blocks 13,48,70,609.00 Completed
209 2024-25 Upgradation of Kasturaba Gandhi Residential School into Smart Model Residential School block Kasmar, Chandankyari and Chas block. Bokaro District Bokaro District 4,28,25,497.00 Completed
210 2024-25 Upgradation of Kasturaba Gandhi Residential School into Smart Model Residential School Chandankiyari Block Chandankiyari Block 67,55,500.00 On going
211 2024-25 Upgradation of Kasturaba Gandhi Residential School into Smart Model Residential School Bokaro District Bokaro District 3,43,97,000.00 On going
212 2024-25 Development of 226 AWCs in Model AWCs Chandankiyari, BS city, Chas gramin & Peterwar block Bokaro District Bokaro District 1,14,82,838.00 On going
213 2024-25 Development of 226 AWCs in Model AWCs Peterwar, Kasmar & Bermo block Bokaro District Bokaro District 1,14,82,838.00 On going
214 2024-25 Development of multiple Primary schools in Model Primary Schools Bokaro District Bokaro District 1,91,01,250.00 On going
215 2024-25 Development of multiple Primary schools in Model Primary Schools Bokaro District Bokaro District 1,67,32,695.00 On going
216 2024-25 Development of multiple Primary schools in Model Primary Schools Bokaro District Bokaro District 3,53,66,960.00 On going
217 2024-25 Development of multiple Primary schools in Model Primary Schools Bokaro District Bokaro District 3,02,71,720.00 Completed
218 2024-25 Development of multiple Primary schools in Model Primary Schools Bokaro District Bokaro District 3,02,71,720.00 On going
219 2024-25 Development of multiple upper Primary schools in Model Upper Primary Schools Bokaro District Bokaro District 27,61,200.00 Completed
220 2024-25 Installation of 75 Lightning Conductor in Schools 4,03,19,998.00 Completed
221 2016-17 Construction of Toilet under Swachh Bharat Mission Chandrapura Block All 10,00,00,000.00 Completed
222 2017-18 Implementation of Bermo Multi-Rural Water Supply Scheme. Bermo Block All 53,13,15,000.00 Completed
223 2017-18 Implementation of Haisabatu Rural Water Supply Scheme. Chas Block Hasabatu East 47,29,49,000.00 Completed
224 2017-18 Implementation of Bijuliya Rural Water Supply Scheme. Bijuliya 9,20,61,000.00 Completed
225 2017-18 Implementation of Rural Water Supply Scheme in Batbinor and adjacent villages for the purpose of the water supply system. Chandankiyari Block Batbinor 8,72,71,900.00 Completed
226 2017-18 Implementation of Rural Water Supply Scheme in Nawdiha and adjacent villages for the purpose of the water supply system. Chandankiyari Block Nawdiha 10,29,53,000.00 Completed
227 2017-18 Implementation of Rural Water Supply Scheme in Jhirki and adjacent villages for the purpose of the water supply system. Gumia Block Jhirke 6,38,48,000.00 Completed
228 2017-18 Implementation of Rural Water Supply Scheme in Angwali and adjacent villages for the purpose of the water supply system. Peterwar Block Angwali South 5,68,22,400.00 Completed
229 2017-18 Implementation of Rural Water Supply Scheme in Chapi and adjacent villages for the purpose of the water supply system. Peterwar Block Chapi 6,78,80,600.00 Completed
230 2017-18 Implementation of Rural Water Supply Scheme in Dahiyari and adjacent villages for the purpose of the water supply system. Nawadih Block Dahiyari 5,95,39,000.00 Completed
231 2017-18 Implementation of Rural Water Supply Scheme in Lalpaniya and adjacent villages for the purpose of the water supply system. Gumia Block Lalpaniya 11,92,67,000.00 Completed
232 2017-18 Implementation of Rural Water Supply Scheme in Pachmo and adjacent villages for the purpose of the water supply system. Gumia Block Pachmo 6,96,19,500.00 Completed
233 2017-18 Implementing Rural Water Supply Scheme in Tenughat Left bank joint and adjacent villages for the water supply system. Peterwar Block Tenughat 6,11,80,000.00 Completed
234 2017-18 Implementing Rural Water Supply Scheme in Tenughat Right bank joint and adjacent villages for the water supply system. Peterwar Block Tenughat 5,56,80,000.00 Completed
235 2017-18 Implementation of Rural Water Supply Scheme in Kathara villages for the purpose of the water supply system. Gumia Block Kathara 5,64,02,500.00 Completed
236 2018-19 Implementation of Rural Water Supply Scheme in Mahal and adjacent villages for the purpose of the water supply system. Chandankiyari Block Mahal West 19,54,87,000.00 On going
237 2018-19 Implementation of Rural Water Supply Scheme in Ranipokhar and adjacent villages for the purpose of the water supply system. Chas Block Ranipokar 9,98,85,500.00 On going
238 2018-19 Implementation of Rural Water Supply Scheme in Jainamod and adjacent villages for the purpose of the water supply system. Bermo Block Jaina 9,56,94,700.00 Completed
239 2018-19 Implementation of Rural Water Supply Scheme in Mayapur and adjacent villages for the purpose of the water supply system. Peterwar Block Mayapur 39,45,97,000.00 On going
240 2018-19 Implementation of Rural Water Supply Scheme in Kander and adjacent villages for the purpose of the water supply system. Gumia Block Kander 12,48,51,000.00 Completed
241 2018-19 Implementation of Rural Water Supply Scheme in Hosir East and adjacent villages for the purpose of the water supply system. Gumia Block Hosir East 8,81,50,700.00 Completed
242 2018-19 Implementation of Rural Water Supply Scheme in Siyari and adjacent villages for the purpose of the water supply system. Gumia Block Siyari 7,21,67,400.00 Completed
243 2018-19 Implementation of Rural Water Supply Scheme in Chatrochati and adjacent villages for the purpose of the water supply system. Gumia Block Chatrochatti 18,32,95,000.00 Completed
244 2018-19 Implementation of Rural Water Supply Scheme in Khamhara and adjacent villages for the purpose of the water supply system. Gumia Block Khamhara 8,39,38,000.00 Completed
245 2018-19 Implementation of Rural Water Supply Scheme in Chirudih and adjacent villages for the purpose of the water supply system. Nawadih Block Chirudih 14,32,93,300.00 Completed
246 2018-19 102 Nos. DTW and 3600 Nos RM t DT in 4 Blocks Bokaro District Bokaro District 95,92,164.00 Completed
247 2018-19 35 Nos. DTW, 10 Nos. HYDT & 406 Nos. RRP in 4 Blocks Bokaro District Bokaro District 94,34,678.00 Completed
248 2019-20 Implementation of Rural Water Supply Scheme in Pupunki and adjacent villages for the purpose of the water supply system. Chas Block Pupunki 35,02,60,000.00 Completed
249 2019-20 Implementation of Rural Water Supply Scheme in Armo and adjacent villages for the purpose of the water supply system. Bermo Block Armo 7,06,89,000.00 Completed
250 2019-20 Implementation of Rural Water Supply Scheme in Polkeri and adjacent villages for the purpose of the water supply system. Chandankiyari Block Polkiri 28,96,29,000.00 On going
251 2019-20 Renovation of 580 nos of Tube wells in 5 blocks Bokaro District Bokaro District 71,38,640.00 Completed
252 2019-20 Implementation of Rural Water Supply Scheme in Sawang South and adjacent villages for the purpose of the water supply system. Gumia Block Sawang South 9,74,84,000.00 Completed
253 2019-20 Implementation of Rural Water Supply Scheme in Pichari South and adjacent villages for the purpose of the water supply system. Peterwar Block Pichari South 6,55,81,000.00 On going
254 2019-20 Implementation of Rural Water Supply Scheme in Dharwa Tand and adjacent villages for the purpose of the water supply system. Peterwar Block Dharwa Tand 6,42,91,000.00 Completed
255 2019-20 Implementation of Rural Water Supply Scheme in Narri and adjacent villages for the purpose of the water supply system. Chandankiyari Block Narri 17,15,97,000.00 Completed
256 2019-20 Renovation of 550 nos of Tube wells in 4 blocks Bokaro District Bokaro District 67,69,767.00 Completed
257 2019-20 Construction of Open Gym in Bokaro District Bokaro District Bokaro District 96,96,541.00 Completed
258 2019-20 Installation of modern materials & equipment related to Smart Classes for 62 nos of schools in Bokaro District. Bokaro District Bokaro District 1,87,89,099.00 Completed
259 2019-20 Skill Development training Chas Block Shivpuri Colony 65,68,800.00 Completed
260 2020-21 Implementation of Rural Water Supply Scheme in Fatehpur Village Chandankiyari Block Silfor 2,10,000.00 Completed
261 2020-21 Implementation of Rural Water Supply Scheme in Jaridihi Bazar Village Jaridih Block Jaridih East 2,30,000.00 Completed
262 2020-21 Implementation of Rural Water Supply Scheme in Sonabad Village Chas Block Sonabad 1,20,000.00 Completed
263 2020-21 Installation of Solar Motor Pump by Deep Boring in Birhora Tola, Dumri Panchayat of Nawadih Block Nawadih Block Dumri 4,88,356.00 Completed
264 2020-21 Purchase of Essential Items for Covid-19 Care Centre Bokaro District Bokaro District 44,95,220.00 Completed
265 2020-21 Purchase of Essential Food Items for Covid-19 Patients Bokaro District Bokaro District 19,45,385.00 Completed
266 2020-21 Operation of Chief Minister Didi Kitchen to deal with the situations arising out of Covid-19 Bokaro District Bokaro District 98,50,344.00 Completed
267 2020-21 Purchase of Ultrasound Machine Bokaro Steel City Sector-1 18,48,000.00 Completed
268 2020-21 Renovation of ANM Training Building and Jainmod Jaridih Hospital Bokaro District Bokaro District 37,76,444.00 Completed
269 2020-21 Installation of CCTV in Check Naka, Quarantine Centre and Containment Zone in Bokaro District Bokaro District Bokaro District 1,28,52,749.00 Completed
270 2020-21 Advertising of Coronavirus disease through campaigning vans, Flash Hoading, Pamphlets etc. in Bokaro District. Bokaro District Bokaro District 2,60,94,195.00 Completed
271 2020-21 Advertising of Coronavirus disease through Campaigning, Flash and Painting in Bokaro District. Bokaro District Bokaro District 1,30,87,207.00 Completed
272 2020-21 Advertising of Coronavirus disease through Campaigning in Bokaro District. Bokaro District Bokaro District 2,75,905.00 Completed
273 2020-21 Purchase of Medical types of equipment for the District Hospital, Bokaro Bokaro District Bokaro District 73,45,26,192.00 Completed
274 2020-21 Beautification of ITI Building, Chas to establish COVID center Bokaro District Bokaro District 77,73,912.00 Completed
275 2020-21 Purchase of Medical types of equipment for the District Hospital, Bokaro Bokaro District Bokaro District 16,96,10,765.00 Completed
276 2020-21 Payment of honorarium for the work done by Data Entry Operator in Covid-19. Bokaro District Bokaro District 67,337.00 Completed
277 2020-21 Tent Services for Covid-19 pendamic situation Bokaro District Bokaro District 27,07,981.00 Completed
278 2020-21 Tent Services for Covid-19 pendamic situation Bokaro District Bokaro District 27,85,511.00 Completed
279 2020-21 Beautification of Jaridih Hospital Bokaro District Bokaro District 24,06,296.00 Completed
280 2020-21 Supply of patient Beds for District Hospital Bokaro District Bokaro District 21,77,785.00 Completed
281 2020-21 Supply of patient Beds for District Hospital Bokaro District Bokaro District 13,45,540.00 Completed
282 2020-21 Supply of patient Beds for District Hospital Bokaro District Bokaro District 20,74,185.00 Completed
283 2020-21 Engagement of support staff for Covid Care Centre Bokaro District Bokaro District 58,00,211.00 Completed
284 2020-21 Advertising of Coronavirus disease through Campaigning, flex hoarding and GEO tags Photography in Bokaro District. Bokaro District Bokaro District 7,54,81,218.00 Completed
285 2020-21 Advertising of Coronavirus disease through Campaigning, flex hoarding and GEO tags Photography in Bokaro District. Bokaro District Bokaro District 1,59,66,216.00 Completed
286 2020-21 Supply of Desk Bench to DEO, Bokaro Bokaro District Bokaro District 4,01,63,682.00 Completed
287 2021-22 Road strengthening work from Bhandaridah railway crossing to Alargo water tank Chandrapura Block Alargo 3,87,33,500.00 Completed
288 2021-22 Construction of road from Armo Panchayat, Armo river bank to Butdada turn. Bermo Block Armo 98,45,000.00 Completed
289 2021-22 Construction of P.C.C. road leading to Friday market, double story Shiv temple and Bajrangbali temple. Bermo Block Bermo South 53,28,800.00 Completed
290 2021-22 Construction of PCC road from Bermo Western Panchayat Main Road Jarangdih Station to Lodharbeda Chowk up to 04 No. Rath Mandir. Bermo Block Bermo West 39,52,100.00 Completed
291 2021-22 Construction of PCC road from Jaridih West, Mahendra Soni ji's house to Kamli Ground. Bermo Block Jaridih West 33,12,400.00 Completed
292 2021-22 Jaridih East Panchayat, from Jodiya bridge via Godavari Nath temple, under the railway bridge to Fusro-Kathara main road Bermo Block Jaridih East 39,62,100.00 Completed
293 2021-22 Construction of PCC road from Jaridih East Panchayat, Kazim Meat Shop to Railway Gate No. 4. Bermo Block Jaridih East 53,68,800.00 Completed
294 2021-22 Road construction from Jaridih Godo Nala bridge to Bermo railway crossing via Pach No. 0 mine. Bermo Block Jaridih East 85,00,500.00 On going
295 2021-22 Construction of PCC road from the house of Sanjay Hembram of Tola Hathbajwa of Armo Panchayat, village Gandke to Tola Kustodag. Bermo Block Armo 61,63,300.00 Completed
296 2021-22 Construction of PCC road from Kharharia Bazartand to Hathbajwa main road of Armo Panchayat village Armo. Bermo Block Armo 54,20,800.00 Completed
297 2021-22 Rural road construction work at the house of Santosh Bhogta from PWD road of Armo panchayat village Lukubad. Bermo Block Armo 56,07,000.00 Completed
298 2021-22 Road construction from Armo Panchayat Gandke Tola Hathbajuwa PWD road to village Gandke Konar river. Bermo Block Armo 99,68,100.00 Completed
299 2021-22 Construction of PCC road from Jaridih Panchayat Mahendra Soni ji's house to SBI Bank. Bermo Block Jaridih East 14,26,500.00 Completed
300 2021-22 Construction of P.C.C. road up to Mahadev Ghansi's house via Sikandar Ghansi's house via Sahdev Ghansi's house via Bermo West Panchayat Binod Thakur's house. Bermo Block Bermo West 17,94,700.00 Completed
301 2021-22 Repair of PCC road from Armo Panchayat Shiv Mandir to Nadi Dhar of Bermo block under Bokaro district. Bermo Block Armo 99,69,300.00 Completed
302 2021-22 Construction of road from Armo panchayat, Konar river bridge to Hathbajwa of Bermo block under Bokaro district. Bermo Block Armo 97,80,500.00 Completed
303 2021-22 Construction of PCC road in Khararia Tola, Armo Panchayat of Bermo block under Bokaro district. Bermo Block Armo 38,92,000.00 Completed
304 2021-22 Construction of P.C.C. road from the Poultry farm of Ramnath Mahato to the crematorium in Bodiya Utari Panchayat of Bermo block under Bokaro district. Bermo Block Bodiya North 50,80,600.00 Completed
305 2021-22 Construction of PCC road from Jaridih East Panchayat, Kazim Meat Shop of Bermo block under Bokaro district to Bermo railway gate via old CCTT fork. Bermo Block Jaridih East 98,45,200.00 Completed
306 2021-22 Construction of P.C.C. road from the house of Joseph Murmu of Village Gandke Tola Hathbajwa to the pond of Mahabir Basak's house in Armo Panchayat, Bermo block under Bokaro district. Bermo Block Armo 17,91,000.00 Completed
307 2021-22 Road construction from railway crossing to Jaridih market in Bermo block under Bokaro district Bermo Block Jaridih East 38,71,300.00 Completed
308 2021-22 Construction of PCC road from Manoj Ravidas's house and Krishna Patel's house to Pavinishad's house in Bokaro colliery old workshop shifting area under Bermo Dakshini Panchayat of Bermo block under Bokaro district. Bermo Block Armo 58,08,600.00 Completed
309 2021-22 Construction of P.C.C road from Prince's house to the main road of South Panchayat of Bermo block under Bokaro district. Bermo Block Tatri South 37,73,600.00 Completed
310 2021-22 Construction of PCC road from Sibram Hembram household to Konar River in Ganrke village of Armo GP. Bermo Block Armo 23,67,400.00 Completed
311 2021-22 Construction of PCC road from Dr. Shahibudin household to Sishu Vikash School to A to Z road in Hariharpur village of Bermo GP. Bermo Block Bermo West 21,29,000.00 Completed
312 2021-22 Construction of PCC road from Santosh Pandit household to Bijay Pashwan to Guddu hari's house in Bermo of Bermo West GP. Bermo Block Bermo West 19,83,500.00 Completed
313 2021-22 Construction of PCC road from Binod Mahato household to Chando Tanti's house to Baleuri's House to Satkam Ghasi in Bermo of Bermo West GP. Bermo Block Bermo West 14,53,200.00 Completed
314 2021-22 Construction of PCC road from Patam Ghasi household to Ajanta ghasi's house to Goutam Domb's House in Bermo of Bermo West GP. Bermo Block Bermo West 14,35,200.00 Completed
315 2021-22 Construction of PCC road from Jarawa Basti Khatal to Basi Ghasi's house in Govindpur-B of Govindpur-B GP. Bermo Block Govindpur B 12,74,100.00 Completed
316 2021-22 Construction of PCC road from Imam Bada Kurpania to Raisahab File road. Bermo Block Kurpaniya 11,92,100.00 Completed
317 2021-22 Construction of PCC road from Sarafat ansari's house to Biru Ghansi's house to Suraj Ghasi's House to Shiv Mandir in Bermo of Bermo West GP. Bermo Block Bermo West 7,96,400.00 Completed
318 2021-22 Construction of PCC road from Babu Quarter to Minus Quarter in Jarangdih South. Bermo Block Jarangdih South 7,17,300.00 Completed
319 2021-22 Construction of PCC road from Riyajudin Khan's house to Safdar's house in Bermo of Bermo West GP. Bermo Block Bermo West 5,98,500.00 Completed
320 2021-22 Construction of PCC road from Narayan Karmali' house to Kiran Madari's house to Alijan ansari's House to Chandan Paswan's House to Mohan Nishad's house in Bermo of Bermo West GP. Bermo Block Bermo West 11,92,100.00 Completed
321 2021-22 Construction of PCC road from Kundan Sinha's house to Bhoda Sanjay's house to Bonid Munda's House to Ranjit's House in Bermo of Bermo West GP. Bermo Block Bermo West 7,96,400.00 Completed
322 2021-22 Construction of PCC road from Radha Krishna's house to Khalid Mia's house in Jaridih of Jaridih East GP. Bermo Block Jaridih East 5,58,600.00 Completed
323 2021-22 Construction of PCC road from Main road of Jarangdih to Church Gate. Bermo Block Jarangdih North 5,39,200.00 Completed
324 2021-22 Construction of PCC road from Shambhu Barnwal's house to Dipak Mahao's garden in Bermo of Bermo West GP. Bermo Block Bermo West 4,00,700.00 Completed
325 2021-22 Construction of PCC road in Jarangdih Bazar Bermo Block Jarangdih North 3,61,100.00 Completed
326 2021-22 Construction of P.C.C road from Mahuatand to Ralibeda dhena soren's house in Pac Panchayat of Nawadih block. Nawadih Block Penk 44,23,600.00 Completed
327 2021-22 Construction of P.C.C road from Meghlal Mahato's house to Kishun Mahato's house in Dhavaiyatola of Pac Panchayat of Nawadih block. Nawadih Block Penk 14,89,200.00 Completed
328 2021-22 Construction of P.C.C road from farm of Bhimlal Mahto to river/bridge at Rani Kura in Dokwatod of Pac Panchayat of Nawadih block. Nawadih Block Penk 16,18,200.00 Completed
329 2021-22 Construction of P.C.C road from Dhobiya REO Road to Lat Gajar of Paik Panchayat of Nawadih block. Nawadih Block Penk 21,61,200.00 Completed
330 2021-22 Construction of P.C.C. road from Ranikurda Kaliram Kisku's house to Bhaltongri of Nawadih Block Panchayat Pack. Nawadih Block Penk 85,25,000.00 Completed
331 2021-22 Construction of P.C.C. road from Rohaniantend Talab to Barwapani Adivasi Tola of Nawadih Block Panchayat Pack. Nawadih Block Penk 70,01,300.00 Completed
332 2021-22 Construction of 1000 feet P.C.C road from Kajkiro village Pipradih Asnatand to the river of Nawadih block. Nawadih Block Kanjkiro 27,70,000.00 Completed
333 2021-22 Construction of P.C.C. road from Misirbagi to Modiabeda of Nawadih Block Panchayat Penk. Nawadih Block Penk 21,61,200.00 Completed
334 2021-22 Construction of 800 feet P.C.C. road from R.E.O. Road to Mr. Teklal Mahto's house at Koriyabeda, Panchayat Kachho, Nawadih Block. Nawadih Block Kacho 48,91,200.00 Completed
335 2021-22 Construction of PCC Road between Amlabad basti to main road gate Kenduliya Basti. Chandankiyari Block Amlabad 15,83,900.00 Completed
336 2021-22 Construction of PCC Road between Amlabad prem nagar to Amlabad bazar. Chandankiyari Block Amlabad 36,65,200.00 Completed
337 2021-22 Construction of PCC Road between Amlabad hazaribag chowk to Kalimandir Chhat Ghat to BCCL Hospital. Chandankiyari Block Amlabad 30,55,100.00 Completed
338 2021-22 Construction of PCC Road between Silfor Panchayat, Fatehpur village to Talgadiya High School. Chandankiyari Block Silfor 28,21,800.00 Completed
339 2021-22 Construction of PCC Road between Nayawan Nimae Heler house to Sadhu Ashram. Chandankiyari Block Nayawon 16,51,000.00 Completed
340 2021-22 Construction of PCC Road between Nayawan Panchayat's Parvatpur village Guhiram singh house to Pahadi tola. Chandankiyari Block Nayawon 21,89,500.00 Completed
341 2021-22 Construction of PCC Road between Tantari Utari Panchayats Hareshwar Dham to Girendra Mishra house. Jaridih Block Tatri North 16,51,000.00 Completed
342 2021-22 Construction of PCC Road 500mtr. between Ramdas Manjhi house of Dumrigoda village of Tantari South Panchayat to Baba Pargana. Jaridih Block Tatri South 8,51,000.00 Completed
343 2021-22 Construction of PCC Road 1.5km. between Hariswar Dham chowk of Tantari Panchayat to Dhowatand. Jaridih Block Tatri North 46,30,000.00 Completed
344 2021-22 Construction of PCC Road from Gomia Thana Chowk to Kodi Tand at Gomia Panchayat under Gomia Block District Bokaro Gumia Block Gomia 46,69,600.00 Completed
345 2021-22 Construction of PCC Road from Ajit Tent House to Khudgadda at Khudgadda Panchayat Swang North under Gomia Block District Bokaro Gumia Block Hazari 43,57,700.00 Completed
346 2021-22 Construction of Drain from 1/B Market Main Road Bobi Dukan to Manoj Mandal Hotel at 1/B Market in Panchayat Swang North under Block Gomia District Bokar Gumia Block Sawang North 46,68,700.00 Completed
347 2021-22 Construction of PCC Road from Swang North in Kabristan to Konar River at Swang Panchayat Swang under Gomia Block District Bokaro Gumia Block Sawang North 45,17,000.00 Completed
348 2021-22 Construction of Bridge in Between Kandwatand to Nawatand under Armo Panchayat, Block Bermo District Bokaro Bermo Block Armo 49,55,000.00 Completed
349 2021-22 Construction of PCC Road at West Jarangdih(Near DRND incomplete Bridge) under Bermo Block District Bokaro Bermo Block Jaridih West 8,09,300.00 Completed
350 2021-22 Construction of PCC Road at over Bridge to Banaso Mandir Small Bridge Pathway West jarangdih under Bermo Block district Bokaro Bermo Block Jaridih West 23,17,300.00 Completed
351 2021-22 Construction of Drain size 2 feet x 2 feet at Bhamashah Building to Munna Sahani House under bermo Block District Bokaro Bermo Block Bermo East 14,89,800.00 Completed
352 2021-22 Construction of Drain at Binod shaw rasan dukan to Khadan Near sarswati bidya bhawan under bermo Block District Bokaro Bermo Block Bermo East 15,35,000.00 Completed
353 2021-22 Construction of PCC Road and Culvert west damodar River intac Well to Simragaraha (Shamshan Ghat) under Bermo Block District Bokaro Bermo Block Jarangdih North 14,08,000.00 Completed
354 2021-22 Construction of PCC Road and Culvert at near south Jarangdih damodar river16 number under Bermo Block District Bokaro Bermo Block Jarangdih South 12,07,000.00 Completed
355 2021-22 onstruction of P.C.C Road at Chandrapura Railway Bridge to Ghatiyari Basti under Chandrapura Bokaro District Chandrapura Block Chandrapura 99,93,600.00 Completed
356 2021-22 Construction of P.C.C Drain with slab at Dugdha east Kewat Kadam ped to mantu Dukan under Chandrapura Block Bokaro Chandrapura Block Dugda East 76,56,500.00 Completed
357 2021-22 Construction of P.C.C Road from Dugdha Mahuwa Tree to Vinod Bihari Chowk in Dugdha West Panchayat under Chandrapura Block Bokaro Chandrapura Block Dugda West 97,01,900.00 Completed
358 2021-22 Construction of P.C.C Road at Tarmi Railway Fatak to Via Ban pul Hirak Road under Chandrapura Bokaro District Chandrapura Block Tarmi 57,41,600.00 Completed
359 2021-22 Construction of Retaining Wall and filling at Lahar Beda at Panchayat Bandiyo under Block District Bokaro Chandrapura Block Bandio 52,63,000.00 Completed
360 2021-22 Construction of Retaining Wall PCC Road and SLR Bridge at Khalcho Panchayat Telo west under Block Chandrapura Block Chandrapura Block Telo West 61,90,000.00 Completed
361 2021-22 Construction of P.C.C Road at Birni REO Road to Barmasiya via Rameshwar Mahto House to Pratap pur REO Road under Chandrapura Bokaro Chandrapura Block Birni 66,55,900.00 Completed
362 2021-22 Construction of P.C.C Road at Khanudih to Rajabera School at panchayat Turiyo under Chandrapura Bokaro District Chandrapura Block Turio 24,22,600.00 Completed
363 2021-22 Construction of Retaining Wall and pcc road at Telo middle dumuhhan under chandrapura block Bokaro Chandrapura Block Telo Middle 23,90,000.00 Completed
364 2021-22 Construction of Retaining Wall PCC Road and Culvert at Paplo or Khalcho Joriya Panchayat Paplo under Chandrapura Block District Bokaro Chandrapura Block Paplo 13,41,000.00 Completed
365 2021-22 Construction of Retaining Wall, PCC Road and Culvert at Paplo Dahar Nala panchayat Telo under Block Chandrapura District Bokaro Chandrapura Block Chandrapura 24,84,500.00 Completed
366 2021-22 Construction of Retaining Wall PCC Road and Culvert at Kharkachwa Garha Tola Korkota Panchayat Bandio under Block Chandrapura District Bokaro Chandrapura Block Bandio 9,00,500.00 Completed
367 2021-22 Construction of P.C.C Road at Simrabera to Manjhlitnd at Birni Panchayat under Nawadih Bokaro District Nawadih Block Birni 49,91,400.00 Completed
368 2021-22 Construction of Retaining Wall and Road at Village Dhawatand Panchayat Parsbani in Parsatand Nala under Nawadih Block District Bokaro Nawadih Block Parsabni 9,14,600.00 Completed
369 2021-22 Construction of Retaining wall and Road between Barwadih and Manpur Tola at Birni Panchayat undr Nawadih Block District Bokaro. Nawadih Block birni 10,50,000.00 Completed
370 2021-22 Construction of Retaining Wall and Road at between Manpur Bazar and Manjhlitand , Panchayat Birni under Block Nawadih District Bokaro Nawadih Block birni 20,02,300.00 Completed
371 2021-22 Construction of Retaining Wall and PCC Road at Dahi Joriya Birni Part Panchayat Birni under Block Nawadih District Bokaro Nawadih Block birni 18,66,000.00 Completed
372 2021-22 Construction of Retaining Wall and Road at between Village Dahi or Gadratand Panchayat Parasbani under Block Nawadih District Bokaro Nawadih Block Parsabni 19,42,400.00 Completed
373 2021-22 Construction of Retaining Wall and Road at Village Dhahiyari between Dhamni or Telo Panchayat Parasbani under Nawadih Block District Bokaro Nawadih Block Parsabni 19,89,100.00 Completed
374 2021-22 Construction of Guard Wall and PCC Road from Mahlibandh (Baburam Tola) H/o Ramchandra to Bokaro River (Chhath Ghat) at Mahlibandh(Baburam Tola) in Panchayat Bandh under Gomia Block District Bokaro Gumia Block Bandh 49,25,000.00 Completed
375 2021-22 Construction of PCC Road from Bandh Basti Samudayik Bhawan Yadav Tola to Kathara Main Road at Village Bandh panchayat Bandh under Gomia Block District Bokaro Gumia Block Bandh 49,61,700.00 Completed
376 2021-22 Construction of 1.2km PCC Road from Gorkhwar to Bokaro River at Hajari Patwa Tola in Panchayat Hajari under Gomia Block District Bokaro Gumia Block Hazari 39,42,800.00 Completed
377 2021-22 Construction of P.C.C Road from Budhidih Railway siding naya road to Shanti chowk (Railway Siding to Railway Bridge via Middling) under Chandrapura Bokaro District Chandrapura Block Karma Tand 99,23,600.00 Completed
378 2021-22 Construction of P.C.C Road from Budhidih Railway siding naya road to Shanti chowk (Siddhu Kanhu Chowk to Railway under Pass Bridge via House of Sadhu Yadav) under Chandrapura Bokaro District Chandrapura Block Karma Tand 99,23,600.00 Completed
379 2021-22 Purchase of Essential Medical items for the prevention of Coronavirus disease. Bokaro District Bokaro District 10,43,93,881.00 Completed
380 2021-22 Purchase of Essential Medical items for the prevention of Coronavirus disease. Bokaro District Bokaro District 1,58,14,800.00 Completed
381 2021-22 Installation of CCTV in Zonal Office, Block Office, Sub Division Office and PHCs in Bokaro District Bokaro District Bokaro District 5,39,48,131.00 Completed
382 2021-22 Purchase of Essential Medical items for the prevention of Coronavirus disease. Bokaro District Bokaro District 7,60,78,043.00 Completed
383 2021-22 Purchase of Essential Medical items for the prevention of Coronavirus disease. Bokaro District Bokaro District 12,98,60,212.00 Completed
384 2021-22 Purchase of Essential Medical items for the prevention of Coronavirus disease. Bokaro District Bokaro District 2,26,78,372.00 Completed
385 2021-22 Advertising of Coronavirus disease through Campaigning in Bokaro District. Bokaro District Bokaro District 18,35,136.00 Completed
386 2021-22 Installation of 2 nos of Medical PSA Oxygen Generator in Bokaro District Bokaro District Bokaro District 99,58,472.00 Completed
387 2021-22 Advertising of Coronavirus disease through Campaigning in Bokaro District. Bokaro District Bokaro District 5,98,000.00 Completed
388 2021-22 Installation of 2 nos of 200 KVA transformer in District Hospital, Bokaro Bokaro Steel City Sector-1 20,12,196.00 Completed
389 2021-22 Installation of 200 KVA transformer in Sub Division Hospital, Bokaro Bermo Block Bermo East 4,99,238.00 Completed
390 2021-22 Installation of Silent Type DG Set in District Hospital, Bokaro Bokaro Steel City Sector-1 74,72,364.00 Completed
391 2021-22 Installation of 250 KVA Silent Type DG Set in District Hospital, Bokaro Bokaro Steel City Sector-1 40,00,278.00 Completed
392 2021-22 Purchase of Oxygen Cylinder, Follow meter and Fold Mask Bokaro District Bokaro District 6,50,260.00 Completed
393 2021-22 Supply and installation of Tab Lab for 60 nos of High Schools of Bokaro district Bokaro District Bokaro District 4,78,96,200.00 Completed
394 2021-22 Installation of Automatic Oxygen Gas Generator 15 M3 - 250 LPM in sub-divisional hospital, bermo, Bokaro Bermo Block Bermo East 56,25,000.00 Completed
395 2021-22 Construction of PSA Oxygen Plan Shed a makeshift Covid Hospital, Sector-6, BS City, Bokaro Bokaro Steel City Sector-6 9,00,617.00 Completed
396 2021-22 Construction of PSA Oxygen Plan Shed a makeshift at SDH, Bermo (Phusro) District Bokaro Bermo Block Bermo East 9,03,300.00 Completed
397 2021-22 Construction of Approach RRC path connecting of Oxygen Plant in Sadar Hospital entire Area. Bokaro Steel City Sector-1 2,46,600.00 Completed
398 2021-22 Construction of Separation wall in Hall at Health Centre Sector-V B.S. City Bokaro for Modification RTPCR Lab. Bokaro Steel City Sector-5 2,48,250.00 Completed
399 2021-22 Emergent work for Health Centre Sector-V, BS City Bokaro for modification RTPCT Lab Bokaro Bokaro Steel City Sector-5 2,49,200.00 Completed
400 2021-22 Strengthening of the Labour Room in narayanpur panchayat at Chas Block and Bermo East in Bermo block Chas Block Narayanpur 4,57,600.00 Completed
401 2021-22 Establishment Oxygen pipeline of 100 bed in the General Ward, Isolation Ward, Covid-19 Ward, Emergency Ward, Operation Theatre and laboure room and 80 bed in ANM hostel in Sadar hospital bokaro Bokaro District Bokaro District 47,45,988.00 Completed
402 2022-23 Construction of road from Pichhi North Panchayat Pichhi Talab to canal side. Peterwar Block Pichari North 72,73,900.00 Completed
403 2022-23 Road construction from Angwali Dakshin Panchayat Behragora to Barukendra via Jhopro Tod. Peterwar Block Angwali North 93,55,600.00 Completed
404 2022-23 Road construction from Angwali Dakshin Panchayat High School to REO Road Gabhar Mochro. Peterwar Block Angwali North 98,35,700.00 Completed
405 2022-23 Road construction from Angwali Dakshin via Gabhramachro , Chhechhara Chowk, Kasraibeda, Peterwar Block Angwali North 99,85,100.00 Completed
406 2022-23 Road construction from Angwali Dakshini Panchayat Jhoprotod Durgamanjhi's house to Dubraj Mojhi's house. Peterwar Block Angwali North 18,90,700.00 Completed
407 2022-23 Construction of PCC road till Mayapur Panchayat Jamunia Tand. Peterwar Block Mayapur 59,92,400.00 Completed
408 2022-23 Construction of guard wall along with P.C.C. path till the house of Palamu Budhidih Techo Prajapati. Nawadih Block Palamu 18,14,200.00 Completed
409 2022-23 Construction of P.C.C road from Manpur Lahikocha Karmik Baske's house under Penk Panchayat of Nawadih Block to Chhote Lal Tudu's house via Koche Talab. Nawadih Block Nawadih 24,83,000.00 Completed
410 2022-23 Construction of PCC road from the house of Borvapani Shahud Ansari to the river under Penk Panchayat of Nawadih block. Nawadih Block Penk 19,50,500.00 Completed
411 2022-23 Construction of 1.5 km PCC road from Nawabodh to Teliadhara middle under Nawadih Block Panchayat Kanjkiro. Nawadih Block Kanjkiro 46,34,000.00 Completed
412 2022-23 Construction of 600 meter P.C.C. road from Penk Kolhi Turi's house to Chamgarhwa bridge via Chhath Ghat. Nawadih Block Penk 32,46,100.00 Completed
413 2022-23 Construction of 500 meter PCC road from Main Road Penk to Jamunia Beda. Nawadih Block Penk 34,64,800.00 Completed
414 2022-23 Construction of 500 meter P.C.C. road from Birmundu Lalchandra Murmu's house via Darwari Murmu's pond under Penk Panchayat of Nawadih block. Nawadih Block Penk 38,47,500.00 Completed
415 2022-23 Construction of 3.00 km road including guard wall from Pipradih Khairagadha of Kanjkiro Panchayat to Abhiyan Vidyalaya. Nawadih Block Kanjkiro 44,82,100.00 Completed
416 2022-23 Construction of 400 feet P.C.C. road from school gate to school boundary wall in village-Dhardharwa under Siyari Panchayat. Gumia Block Siyari 14,05,700.00 Completed
417 2022-23 Construction of 400 feet P.C.C. road from opposite school wall to old road in Dhardharwa village under Siyari Panchayat. Gumia Block Siyari 14,05,700.00 Completed
418 2022-23 Construction of 500 feet guard wall from Naresh Chaudhary's house to Pyari Chaudhary's house of Panchayat Siyari village-Dumri Yadav Tola. Gumia Block Siyari 12,71,500.00 Completed
419 2022-23 Construction of road from Durga Mandap to Friday market in Panchayat Palamu of Nawadih block. Nawadih Block Palamu 84,55,500.00 Completed
420 2022-23 Construction of P.C.C. road from Penk Panchayat's Manpur Harichandra Murmu's house to Karma river. Nawadih Block Penk 45,93,700.00 Completed
421 2022-23 Construction of P.C.C. road with guardwall from REO road to Deepchandra Soren's house in Kachho Dalkiro. Nawadih Block Kacho 27,83,300.00 Completed
422 2022-23 Construction of road from Palamu Aidalbeda to Chhotki Kudi. Nawadih Block Palamu 44,84,200.00 Completed
423 2022-23 Construction of road from Kubiyabeda main road of Pilpilon to Imli tree under Nawadih Block Panchayat Kanjkiro. Nawadih Block Kanjkiro 62,47,600.00 Completed
424 2022-23 UPG P S KUSUMDIH (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Barkipunu. Gumia Block Barki Punu 4,30,000.00 Completed
425 2022-23 UPG RAJKIYAKRIT M S KERI (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Tikahara Gumia Block Tikahara 4,30,000.00 Completed
426 2022-23 UPG RAJKIYAKRIT M S GANGPUR (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Mahuatand Gumia Block Mahua Tand 4,30,000.00 Completed
427 2022-23 UPG P S KATHARA NO-4 (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Kathara panchayat Gumia Block Kathara 4,30,000.00 Completed
428 2022-23 UPG P S KATHARA JHOPARPATTI (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Kathara panchayat Gumia Block Kathara 4,30,000.00 Completed
429 2022-23 UPG P S RAILWAY COLONY (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Kathara Gumia Block Kathara 4,30,000.00 Completed
430 2022-23 SSA NPS CHATNIYA JHIRKI, (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Jhirke Gumia Block Jhirke 4,30,000.00 Completed
431 2022-23 UPG P S NAWATAND (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Siyari Gumia Block Siyari 4,30,000.00 Completed
432 2022-23 UPG P S HATHBAJWA (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Armo panchayat Bermo Block Armo 4,30,000.00 Completed
433 2022-23 UPG P S NAWATAND (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Armo panchayat Bermo Block Armo 4,30,000.00 Completed
434 2022-23 UPG RAJKIYAKRIT +2 HIGH SCHOOL MAHAL (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Mahal West Chandankiyari Block Mahal West 4,30,000.00 Completed
435 2022-23 RAJKIYAKRIT P S BABUGRAM (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Nayawon Chandankiyari Block Nayawon 4,30,000.00 Completed
436 2022-23 UPG RAJKIYAKRIT M S KADUABHITHA (Solar Based water Supply Scheme and Hand wash basin without Deep Boring) in Badajor panchayat Chandankiyari Block Badajor 4,30,000.00 Completed
437 2022-23 Renovation of Pond in Penk Hetbahiyar. Nawadih Block Penk 14,16,700.00 Completed
438 2022-23 Construction of boundary wall upgradred Middle school Mahli bandh. Gumia Block Gomia 7,47,100.00 Completed
439 2022-23 Construction of boundary wall Repair in Middle School Swang (Purana Mines). Gumia Block Sawang North 19,72,600.00 Completed
440 2022-23 Construction of Model School of Govt. Middle School Hajari. Gumia Block Hazari 23,89,900.00 Completed
441 2022-23 Construction of boundary wall patwa hajari toli football ground of north side. Gumia Block Hazari 10,26,300.00 Completed
442 2022-23 Construction of boundary wall with main gate in upgraded Middle School Gomiyadih. Gumia Block Gomia 14,28,000.00 Completed
443 2022-23 Construction of 300 m Drain under ground from House of Umashankar Prasad to House of Pashupati Prajapati in Patwa Toli. Gumia Block Gomia 24,92,200.00 Completed
444 2022-23 Construction Of Guard Wall at Singari road khet in alargo Panchayat, Dist- bokaro Chandrapura Block Alargo 22,21,300.00 Completed
445 2022-23 Construction of PCC (Plain Cement Concrete) Road From Puneshwar mahto House to Primary School at Taranga in Taranga Panchayat, Dist- Bokaro. Chandrapura Block Taranga 19,59,200.00 Completed
446 2022-23 Construction of Guard Wall From H/O- Deepak Mahto to Transformer at Bahiyartant in telo east Panchayat, Block- Chandrapura, Dist- Bokaro Chandrapura Block Telo East 19,22,100.00 Completed
447 2022-23 Construction Of 600 feet Pcc from Jamuatanr Private school to Kanahal Nonlya House in Tranga Panchayat, Block- chandrapura , Dist- Bokaro Chandrapura Block Taranga 15,70,667.00 Completed
448 2022-23 Construction Of Common toilet in Upgraded Middle School Kachho, Block- Nawadih , Dist- Bokaro. Nawadih Block Kacho 12,96,900.00 Completed
449 2022-23 Construction Of Snangghat at Puranipokhar Talab, Block- Nawadih , Dist- Bokaro. Nawadih Block Palamu 4,74,700.00 Completed
450 2022-23 Construction Of Drain at Phurso Nagar Parished, Makoli area From School to main Road Bridge , Dist- bokaro. Bermo Block Phusro 11,47,700.00 Completed
451 2022-23 Panchayat of Chandrapura Pankhand Telo East Chhotka Lal Dam to Adivasi Talab Mandap Tola Badka Dam of 1300 Feet Drain. Chandrapura Block Telo East 38,65,200.00 Completed
452 2022-23 Constrution of PCC road at village alargo UMS to Lipahir GP Alargo block Chandrapura district Bokaro Chandrapura Block Alargo 48,48,600.00 Completed
453 2022-23 Contruction of Big Drain from Sub- Health Center to Main road Bridge at Makoli in Phusro . Bermo Block Phusro 69,76,800.00 Completed
454 2022-23 Contruction of Drain upto The House of Ragho yadav in Makoli of phusro Municipal Council Area. Bermo Block Phusro 35,71,000.00 Completed
455 2022-23 Construction of PCC Road at Vill- Alargo, Panchayat Bhawan to Rakhwa, Block-Chandrapura, Dist- Bokaro. Chandrapura Block Alargo 71,19,700.00 Completed
456 2022-23 Renovatio of Pond Farmtand, Block- Kasmar. Kasmar Block Kasmar 16,80,800.00 Completed
457 2022-23 Construction of Boundary wall,P.C.C and Gate of Pradhan Mantri Awas Yojna for Landless Beneficiaries in Claster. Gumia Block Siyari 70,95,700.00 Completed
458 2022-23 Preparation of Playground Construction Changing room with two units toilets and Boring Installation with hand pump. Jaridih Block Bandhdih North 5,25,800.00 Completed
459 2022-23 Preparation of Playground Construction Changing room with two units toilets and Boring Installation with hand pump. Jaridih Block Baradih 5,25,800.00 Completed
460 2022-23 Preparation of Playground Construction Changing room with two units toilets and Boring Installation with hand pump. Jaridih Block Bhaski 5,25,800.00 Completed
461 2022-23 Preparation of Playground Construction Changing room with two units toilets and Boring Installation with hand pump. Jaridih Block Baru 5,25,800.00 Completed
462 2022-23 Preparation of Playground Construction Changing room with two units toilets and Boring Installation with hand pump. Jaridih Block Jaina 5,25,800.00 Completed
463 2022-23 Preparation of Playground Construction Changing room with two units toilets and Boring Installation with hand pump. Kasmar Block Ponda 5,25,800.00 Completed
464 2022-23 Preparation of Playground Construction Changing room with two units toilets and Boring Installation with hand pump. Kasmar Block Sonpura 5,25,800.00 Completed
465 2022-23 Preparation of Playground Construction Changing room with two units toilets and Boring Installation with hand pump. Kasmar Block Tangtona 5,25,800.00 Completed
466 2022-23 Preparation of Playground Construction Changing room with two units toilets and Boring Installation with hand pump. Kasmar Block Daatu 5,25,800.00 Completed
467 2022-23 Preparation of Playground Construction Changing room with two units toilets and Boring Installation with hand pump. Kasmar Block Sijua 5,25,800.00 Completed
468 2022-23 Preparation of Playground Construction Changing room with two units toilets and Boring Installation with hand pump. Chas Block Kumardhaga 5,25,800.00 Completed
469 2022-23 Preparation of Playground Construction Changing room with two units toilets and Boring Installation with hand pump. Chandankiyari Block Kusumkiyari 5,25,800.00 Completed
470 2022-23 Construction of both site drain and block along with cover of Bandhdih Uttari Panchayat NH Road of Jaridih Block. Jaridih Block Bandhdih North 98,76,900.00 Completed
471 2022-23 Gangjori Panchayat village Veersadam Tola Padanatand while passing by the memorial of late Ratanpuri Construction of about 1600 feet P.C.C. road from Jackfruit Tree to R.E.O. Road. Jaridih Block Gangjori 62,56,700.00 Completed
472 2022-23 Construction of PCC road from Aluar Machatand Kali Temple (Nawabandh) to Dalghatiya Ghat Damodar river of Batbinor GP. Chandankiyari Block Batbinor 57,20,600.00 Completed
473 2022-23 Construction of PCC road from Shiv Babudih railway station main road to hirak main road via Harijan tola Chandankiyari Block Shiv Babudih 60,43,200.00 Completed
474 2022-23 Construction of PCC Road from Banddih North GP's Brahmdev Prasad's house to Jai Shankar Varnwal's house. Jaridih Block Bandhdih North 7,45,600.00 Completed
475 2022-23 Renovation of Check Dam built in front of Jagasur Jawabeda located in Araldih GP Jaridih Block Araldih 9,43,000.00 Completed
476 2022-23 Construction of PCC road from birubandh of mahal western panchayat to keratock main road via Bhandaridih village. Chandankiyari Block Mahal West 11,80,200.00 Completed
477 2022-23 Construction of PCC Road from Pathgadiya to Babur Bahal of Batbinor GP Chandankiyari Block Batbinor 9,96,200.00 Completed
478 2022-23 Construction of PCC road from next to Devgram football ground to Devgram school via Bauri Tola. Chandankiyari Block Devgram 26,95,000.00 Completed
479 2022-23 Construction of PCC road from Bajrangbali turn of Mahal Village to railway line main roadvia Singh Tola. Chandankiyari Block Mahal West 44,49,800.00 Completed
480 2022-23 Construction of PCC Road from Devgram Sandeep Manjhi's house to Talgadiya main road. Chandankiyari Block Devgram 30,27,400.00 Completed
481 2022-23 Renovation of Government pond in front of new primary school of Bangadiya Chandankiyari Block Badajor 24,03,300.00 Completed
482 2022-23 Renovation of pond in buru sodo Gumia Block Gomia 24,80,800.00 Completed
483 2022-23 Renovation of Bangadiya pond of Simuliya village Rangamati GP of Chandankiyari Block Chandankiyari Block Simuliya 11,81,200.00 Completed
484 2022-23 Renovation work of Jalohi Pond of village Muktapur GP of Biryadih under Chandankiyari Block Chandankiyari Block Boriyadih 24,97,200.00 Completed
485 2022-23 Construction of 400 feet PCC Road from Islam gali budhwa tongri to Ghagharia Gumia Block Jhirke 18,91,200.00 Completed
486 2022-23 Construction of 500 feet PCC road and guard wall from Kendua tola to Chhutu Singh's house in Mahalibandh. Gumia Block Bandh 24,90,300.00 Completed
487 2022-23 Construction of PCC road from Pahaditola to Yogidih main road under Chandankiyari block. Chandankiyari Block Chandankiyari East 15,97,200.00 Completed
488 2022-23 Construction of PCC road from PV Gundari to Madhra border of Simulia GP Chandankiyari Block Simuliya 53,05,000.00 Completed
489 2022-23 Construction of PCC road till chandipur village gawai river crematorium of Kusumkiyari GP Chandankiyari Block Kusumkiyari 83,60,500.00 Completed
490 2022-23 Construction of PCC road from Banerdih Bajrangbali Temple to Jodia of Kumardoba Panchayat Chandankiyari Block Kumirdoba 70,99,800.00 On going
491 2022-23 Construction of Pond at Bandio Panchayat under Chandrapura Block District Bokaro Chandrapura Block Bandio 10,17,400.00 Completed
492 2022-23 Construction of Pond at Taranga Panchayat in Mission Amrit Sarovar under Chandrapura Block District Bokaro Chandrapura Block Taranga 21,23,600.00 Completed
493 2022-23 Construction of Pond at Dugda East Panchayat under Chandrapura Block District Bokaro Chandrapura Block Dugda East 17,71,200.00 Completed
494 2022-23 Construction of Pond at Armo Panchayat under Bermo Block District Bokaro Bermo Block Armo 19,60,000.00 Completed
495 2022-23 Construction of PCC Road and Culvert at Baradih Panchayat from Panchayat Bhawan Baradih to Manu Karmali via Kasturba School under Jaridih Block District Bokaro Jaridih Block Baradih 85,70,000.00 Completed
496 2022-23 Construction of PCC Road from Main Road Tupkadih Ashok Mahto Hotel to Sawswati Shishu Vidya Mandir School Tupkadih via Tilu Mahto Pani Tanki at Tantri South Panchayat under Jaridih Block District Bokaro Jaridih Block Tatri South 60,34,200.00 Completed
497 2022-23 Construction of PCC Road and Drain from Near Panchayat Sachiwalay to H/o Kumhardih Bhagirath Saw at Tantri Uttari Panchayat under Jaridih Block District Bokaro Jaridih Block Tatri North 87,29,700.00 Completed
498 2022-23 Construction of PCC Road from H/o Binod Thakur to H/o Mukund Singh at Tantri Uttari Panchayat under Jaridih Block District Bokaro Jaridih Block Tatri North 17,42,700.00 Completed
499 2022-23 Construcion of Boundary Wall and Beautification Vikash Bhawan at Ravidas Tola in Tantri Uttari Panchayat under Jaridih Block District Bokaro Jaridih Block Tatri North 16,93,500.00 Completed
500 2022-23 Construction of Daskarma Ghat at Janghi Joriya in Tantri Panchayat under Jaridih Block District Bokaro Jaridih Block Tatri North 12,69,800.00 Completed
501 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Panchayat Deogram under Chandankiyari Block District Chandankiyari Block Devgram 5,25,800.00 Completed
502 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Panchayat Boriyadih under Chandankiyari Block District Chandankiyari Block Boriyadih 5,25,800.00 Completed
503 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in Lipingdih, Putkadih Peterwar Block Ulgadda 5,25,800.00 Completed
504 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Upgraded Middle School of Tenughat Peterwar Block Tenughat 5,25,800.00 Completed
505 2022-23 Construction of playground in Middle School, Pichari Peterwar Block Pichari South 5,25,800.00 Completed
506 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at the land of sarwajanik maidan (Rangamati) Peterwar Block Patki 5,25,800.00 Yet to Start
507 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Kusumkiyari under Chandankiyari Block District Chandankiyari Block Kusumkiyari 5,25,800.00 Completed
508 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Chandankiyari East under Chandankiyari Block District Chandankiyari Block Chandankiyari East 5,25,800.00 Completed
509 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Laghala under Chandankiyari Block District Chandankiyari Block Laghla 5,25,800.00 Completed
510 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Barai under Nawadih Block District Nawadih Block Barai 5,25,800.00 Completed
511 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Penk under Nawadih Block District Nawadih Block penk 5,25,800.00 Completed
512 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Kachho under Nawadih Block District Nawadih Block kacho 5,25,800.00 Completed
513 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Birni under Nawadih Block District Nawadih Block birni 5,25,800.00 Completed
514 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Ulgadda under Petarwar Block District Peterwar Block Ulgadda 5,25,800.00 Completed
515 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Pichhari North under Petarwar Block District Peterwar Block Pichari North 5,25,800.00 Completed
516 2022-23 Beautification of Pond with Construction of Guard Wall on both side of Bada Talab & Construction of Snan Ghat in Gunjardih Panchayat under Nawadih Block District Bokaro Nawadih Block Gunjardih 88,82,900.00 Completed
517 2022-23 Construction of Boundary Wall at Panchayat Alargo Primary School, Sarayatand-2 under Chandrapura Block District Bokaro Chandrapura Block Alargo 19,54,000.00 On going
518 2022-23 Construction Of Paver Block Road At Vil - Alargo Near Vivah Mandap, Simrakulhi Panchayat- Alargo Under Chandrapura Block, Distt.- Bokaro Chandrapura Block Alargo 12,63,400.00 Completed
519 2022-23 Construction P.C.C Road from Alargo Packs to Govind Mahto Field at Alargo Panchayat under Chandrapura Block, District Bokar Chandrapura Block Alargo 9,06,200.00 Completed
520 2022-23 Construction of PCC Raod at Bhaski Panchayat, Village Jilingtand from Bhola Baba Mandir to Dahibadad More under Jaridih Block District Bokaro Jaridih Block Bhaski 53,03,000.00 Completed
521 2022-23 Construction of RCC Drain with Slab at Jainamore Masjid to Project Girls Schoole at Jaina Panchayat under Jaridih Block Distric Bokaro Jaridih Block Jaina 47,71,700.00 Completed
522 2022-23 Construction of PCC Road from H/o Radhucharan Mahto to H/o Hiralal Mahto via Kadakata at Village Tandra in Bhaski Panchayat under Jaridih Block District Bokaro Jaridih Block Bhaski 42,65,400.00 Completed
523 2022-23 Preparation of Playground, Construction of changing room with two units toilets and Boring installation with hand pump. Nawadih Block Bhalmara 5,25,800.00 Completed
524 2022-23 Preparation of Playground, Construction of changing room with two units toilets and Boring installation with hand pump. Nawadih Block Gunjardih 5,25,800.00 Completed
525 2022-23 Preparation of Playground, Construction of changing room with two units toilets and Boring installation with hand pump. Nawadih Block Birni 5,25,800.00 Completed
526 2022-23 Construction of RCC Drain with Slab Punarvas Area Bermo Road, Rajput Tola, H/o Ashok Singh to front of Baijnath Singh House at Jaina Panchayat under Jaridih Block District Bokaro Jaridih Block jaina 27,63,300.00 Completed
527 2022-23 Construction PCC Road and Drain with Slab, Punarvas Area, Rajput Tola, H/o Gandhi Ray to H/o Ranjan Gupta at Jaina Panchayat under Jaridih Block District Bokaro Jaridih Block Jaina 26,20,200.00 Completed
528 2022-23 Construction of PCC Road and Drain near Aryan Hotel NH-23 to front H/o Ashok Singh via H/o Mukesh Kumar at Tand Mohanpur Panchayat under Jaridih Block District Bokaro Jaridih Block tand mohanpur 23,64,600.00 Completed
529 2022-23 Construction of PCC Road from H/o Murari Gupta to H/o Dara Singh at Malhantand in Jaina Panchayat under Jaridih Block District Bokaro Jaridih Block Jaina 17,99,600.00 Completed
530 2022-23 Construction of Ghat at Das Tola Pond in Jaina Panchayat under Jaridih Block District Bokaro Jaridih Block Jaina 10,78,700.00 Completed
531 2022-23 Construction of Guard Wall and RCC Culvert in Dahiyari Vill+Panchayat- Purani Dahiyari to Connecting Road of Gomo (Chattayeengadha) Under Nawadih Block in Distt-Bokaro Nawadih Block Dahiyari 24,80,100.00 Completed
532 2022-23 Strengthening of the Road from Naya Dahiyari to Purana Dahiyari at Dahiyari Panchayat Under Nawadih Block in Distt-Bokaro Nawadih Block Dahiyari 24,73,600.00 Completed
533 2022-23 Renovation of Purni Pokhar Bandh at ,Panchayat-Birni Block- Nawadih in Distt-Bokaro Nawadih Block birni 23,72,600.00 Completed
534 2022-23 Renovation of Bade Ahar at Panchayat-Plamu Block- Nawadih in Distt-Bokaro Nawadih Block Palamu 18,45,300.00 Completed
535 2022-23 Construction of Four Numbers Room at Binod Bihari Mahto Sarswati Vidya Mandir, Gunjardih Mungo, Panchayat Chapari under Nawadih Block district Bokaro Nawadih Block Chapri 21,06,100.00 Completed
536 2022-23 Construction of Two Numbers Room at Upgraded Middle Schoole, Bagdegwa, Panchayat Chapari under Nawadih Block district Bokar Nawadih Block Chapri 15,93,400.00 Completed
537 2022-23 Construction of Guard Wall and RCC Culvert in Dahiyari Vill+Panchayat- Purani Dahiyari to Connecting Road of Gomo (Chattayeengadha) Under Nawadih Block in Distt-Bokaro Jaridih Block Bhaski 49,73,000.00 Completed
538 2022-23 Implementation of Phusro Water Supply Scheme. Bermo Block Phusro 26,16,75,700.00 Completed
539 2022-23 Construction of Gate Board, Beautification, and installation of signage board in Bermo sub-division area, Damodar Bridge, Phusro Over Bridge, and other areas of Bikaro district. Bermo Block Bermo East 1,18,40,120.00 Completed
540 2022-23 Supply of Fire Extinguisher in Gov. Offices, Schools, Hospitals, Clinic, PHC and CHC in the Bokaro Distict Bokaro District Bokaro District 46,43,568.00 Completed
541 2022-23 Engagement of support staff (doctors, paramedical staff & etc.) around District. Phase-1 Bokaro Steel City Sector-1 1,74,42,000.00 Completed
542 2022-23 Renovation of Kastuba Gandhi Girls hostel Building at Petwar, Bokaro Peterwar Block Peterwar 24,97,000.00 Completed
543 2022-23 Renovation of Kastuba Gandhi Girls hostel Building at Nawadih, Bokaro Peterwar Block Peterwar 20,14,000.00 Completed
544 2022-23 Construction work of Dinning Hall and PCC Work Kasturba Gandhi Girls Hostel Building at Gomia, Bokaro Gumia Block Gomia 24,91,500.00 Completed
545 2022-23 Renovation of Kastuba Gandhi Girls hostel Building at Gomia, Bokaro Gumia Block Gomia 24,81,900.00 Completed
546 2022-23 Renovation of Kastuba Gandhi Girls hostel Building at Chas, Bokaro Chas Block Kandra 24,94,400.00 Completed
547 2022-23 Renovation of Kastuba Gandhi Girls hostel Building at Chandankiyari, Bokaro Chandankiyari Block Chandankiyari East 24,89,800.00 Completed
548 2022-23 Construction of Culvert between station road Tupkadih and sima tand of karani west GP of Chas block. Chas Block Kanari West 72,85,200.00 Completed
549 2022-23 Preparation of Playground, Construction of changing room with two units toilets and Boring installation with hand pump. Nawadih Block Kacho 5,25,800.00 Completed
550 2022-23 Preparation of Playground, Construction of changing room with two units toilets and Boring installation with hand pump. Chandrapura Block Taranga 5,25,800.00 Completed
551 2022-23 Preparation of Playground, Construction of changing room with two units toilets and Boring installation with hand pump. Chandrapura Block Telo East 5,25,800.00 Completed
552 2022-23 Preparation of Playground, Construction of changing room with two units toilets and Boring installation with hand pump. Chandrapura Block Telo Middle 5,25,800.00 Completed
553 2022-23 Preparation of Playground, Construction of changing room with two units toilets and Boring installation with hand pump. Chandrapura Block Karma Tand 5,25,800.00 Completed
554 2022-23 Preparation of Playground, Construction of changing room with two units toilets and Boring installation with hand pump. Chandrapura Block Sijua 5,25,800.00 Completed
555 2022-23 Purchase of 1 nos of Cardiac Ambulance for sub divisional hospital, Bermo. Bokaro District Bokaro District 34,00,000.00 Completed
556 2022-23 Construction of Gate Board, Beautification, and installation of signage board. Bermo Block Bermo East 40,20,000.00 Completed
557 2022-23 Construction of ECO park in Chharchhariyan Dham (Luguburu Dham) pond of kodwa tand GP under Gomia Block Gumia Block Kodwa Tand 83,34,200.00 Completed
558 2022-23 Construction of boundary wall of the livelihood resource centre, Kasmar, Bokaroo Kasmar Block Kasmar 99,31,100.00 Completed
559 2022-23 BALA Painting at Upgraded Middle School, Pipradih Gumia Block Sawang South 8,88,230.00 Completed
560 2022-23 BALA Painting at Upgraded Middle School, Behragoda Peterwar Block Angwali South 11,04,774.99 Completed
561 2022-23 BALA Painting at Middle School, Gumia Gumia Block Palihaari Gurudih 10,80,240.00 Completed
562 2022-23 BALA Painting at Middle School, Alargo Chandrapura Block Alargo 8,88,230.00 Completed
563 2022-23 BALA Painting at Middle School, Shibutand Chas Block Kanari West 11,04,774.99 Completed
564 2022-23 BALA Painting at Primary School, Kaswagada Gumia Block Khamhara 10,80,240.00 Completed
565 2022-23 BALA Painting at Middle School, Chapri Nawadih Block Chapri 11,39,180.00 Completed
566 2022-23 BALA Painting at Sports Complex, Chandnkiyari, Bokaro Chandankiyari Block Chandankiyari East 11,75,790.00 Completed
567 2022-23 BALA Painting at +2 High School, Pindajora Chas Block Pindrajora 24,72,610.00 Completed
568 2022-23 BALA Painting at Middle School, Pichhri Peterwar Block Pichari South 10,99,420.00 Completed
569 2022-23 BALA Painting at New Primary School, Mirchatand Chandrapura Block Telo West 5,55,170.00 Completed
570 2022-23 BALA Painting at Government Middle School, Dhori Bermo Block Bermo East 12,81,490.00 Completed
571 2022-23 BALA Painting at Middle School, Tenughat Peterwar Block Tenughat 10,94,590.00 Completed
572 2022-23 BALA Painting at Middle School, Chakuliya Chas Block Chakuliya 5,55,170.00 Completed
573 2022-23 BALA Painting at Middle School, Gunjardih Nawadih Block Gunjardih 13,01,054.99 Completed
574 2022-23 BALA Painting at Middle School, Khetko, Petarwar Peterwar Block Khetko 13,70,250.00 Completed
575 2022-23 BALA Painting at Middle School, Kanjkio, Nawadih Nawadih Block Kanjkiro 12,25,000.00 Completed
576 2022-23 BALA Painting at Upgraded Middle School, Punnu, Gomia Gumia Block Gomia 12,25,455.00 Completed
577 2022-23 BALA Painting at Middle School, Birni, Nawadih Nawadih Block Birni 12,55,240.00 Completed
578 2022-23 BALA Painting at Middle School, Gangjori, Jaridih Jaridih Block Gangjori 12,37,670.00 Completed
579 2022-23 BALA Painting at Middle School, Pathuria, Jaridih Jaridih Block Araldih 14,08,925.00 Completed
580 2022-23 BALA Painting at Middle School, Junaui, Chandrapura Chandrapura Block Chandrapura 12,56,010.00 Completed
581 2022-23 BALA Painting at +2 High School, Gomia Gumia Block Gomia 13,78,475.00 Completed
582 2022-23 BALA Painting at Middle School, Sijua, Chandrapura Chandrapura Block Sijua 10,30,435.00 Completed
583 2022-23 BALA Painting at Upgraded Middle School, Block Colony, Petarwar Peterwar Block Peterwar 10,66,205.00 Completed
584 2022-23 Supply of Bunk Beds in hostels of residential schools located in mining affected areas/blocks. Bokaro District Bokaro District 1,10,92,255.00 Completed
585 2022-23 Construction of 330 feet of guard wall from the land of Ramakant Sharma to Pokhara pond in Birni GP of Nawadih Block Nawadih Block Birni 13,50,800.00 Completed
586 2022-23 Renovation of Pipra pond in Kanjkiro GP under Nawdih block Nawadih Block Kanjkiro 30,72,800.00 Completed
587 2022-23 Construction of 300 feet of guard wall at pond of Sarubeda Ganjutola in Bhalmara GP of Nawadih Block Nawadih Block Bhalmara 38,03,700.00 Completed
588 2022-23 Renovation of Raja pond in Alargo GP under Chandrapura block Chandrapura Block Alargo 40,17,500.00 Completed
589 2022-23 Construction of the High School Building at Dhori under Bermo Block Bermo Block Bermo East 4,94,88,500.00 Completed
590 2022-23 Construction of 16 nos of Additional Classroom and 2 nos of Multipurpose rooms in 10+2 High School, Mahal under Chandrakiyari Block Chandankiyari Block Mahal East 3,64,34,700.00 Completed
591 2022-23 Construction of 16 nos of Additional Classroom and 2 nos of Multipurpose rooms in 10+2 High School, Gumia under Gumia Block Gumia Block Gomia 3,64,34,700.00 Completed
592 2022-23 Construction of 4 nos of Additional Classroom and 2 nos of Multipurpose rooms in 10+2 High School Chandrapura, Dugda under Chandrapura Block Chandrapura Block Dugda North 1,53,04,400.00 Completed
593 2022-23 Construction of 4 nos of Additional Classroom and 2 nos of Multipurpose rooms in Kartik Chandra Sharma High School, Kalapathar under Chas Block Chas Block Kalapathar 1,53,04,400.00 Completed
594 2022-23 Purchase of ANC KIT for 121 nos centres in hospitals, PHC, CHC, sub-center & Anganwadi Kendra Bokaro District Bokaro District 74,68,725.00 Completed
595 2022-23 Renovation of Badka Talab near Bahadurpur Shiv Mandir under Jaridih Block Jaridih Block Baradih 24,94,800.00 Completed
596 2022-23 Purchase of Self-Propelled Road Sweeping Machine for Nagar parishad Phusro Bermo Block Bermo East 5,27,04,310.00 Completed
597 2022-23 Establishment of Lemon Grass Distillation unit at Arjuva GP under Peterwar Block Peterwar Block Arjuba 18,97,999.00 Completed
598 2022-23 Construction of Dwar Pattika and Signage with necessary structure Bermo Block Bermo East 1,60,80,000.00 Completed
599 2022-23 Supply of 50 nos of Bunk beds in the hostel of Kasturba Gandhi girls residential schools, Gumia Gumia Block Sarhachiya 12,98,859.00 Completed
600 2022-23 Supply of 25 nos of Bunk beds in the hostel of Kasturba Gandhi girls residential schools, Jaridih Jaridih Block Baradih 6,49,429.50 Completed
601 2022-23 Supply of 25 nos of Bunk beds in the hostel of Kasturba Gandhi girls residential schools, Chandankiyari Chandankiyari Block Chandankiyari East 6,49,429.50 Completed
602 2022-23 Supply of 25 nos of Bunk beds in the hostel of Kasturba Gandhi girls residential schools, Nawadih Nawadih Block Nawadih 6,49,429.50 Completed
603 2022-23 Supply of 25 nos of Bunk beds in the hostel of Kasturba Gandhi girls residential schools, Peterwar Peterwar Block Tenughat 6,49,429.50 Completed
604 2022-23 Supply of 50 nos of Bunk beds in the hostel of Kasturba Gandhi girls residential schools, Kasmar Kasmar Block Kamlapur 12,98,859.00 Completed
605 2022-23 Supply of 25 nos of Bunk beds in the hostel of Kasturba Gandhi girls residential schools, Chas Municipal Corporation Chas Ward No.-31 6,49,429.50 Completed
606 2022-23 Supply of 35 nos of Bunk beds in the hostel of Backward caste boys welfare hostel, Chas College, Chas Chas Block Kura 9,09,201.30 Completed
607 2022-23 Supply of 20 nos of Bunk beds in the hostel of Scheduled caste boys kalyan hostel, BS City, Sector-6 Bokaro Steel City Sector-6 5,19,543.60 Completed
608 2022-23 Supply of 50 nos of Bunk beds in the hostel of Minority boys welfare hostel (BS City, Sector-6) Bokaro Steel City Sector-6 12,98,859.00 Completed
609 2022-23 Supply of 30 nos of Bunk beds in the hostel of Minority boys welfare hostel (Madrasa Hanfia Garib Nawaz Siwandih) Chas Block Basgora West 7,79,315.40 Completed
610 2022-23 Supply of 30 nos of Bunk beds in the hostel of Minority integration hostel, Balidih, Chas Chas Block Balidih 7,79,315.40 Completed
611 2022-23 Supply of 50 nos of Bunk beds in the hostel of Archery / Athletics Training Centre Chandankiyari Block Chandankiyari East 12,98,859.00 Completed
612 2022-23 BALA Painting at Kasturba Gandhi Girls Redidential School, Chas, Ward no-31 Chas Block Ward No.-31 49,48,125.00 Completed
613 2022-23 BALA Painting at Primary School, Parvatpur, Chandankiyari Chandankiyari Block Nayawon 4,73,620.00 Completed
614 2022-23 BALA Painting at Upgraded Middle School, Brahan, Lghla, Chandankiyari Chandankiyari Block Laghla 13,04,975.00 Completed
615 2022-23 BALA Painting at Primary School, Central Colony, Dhori, Bermo Bermo Block Bermo East 5,56,045.00 Completed
616 2022-23 BALA Painting at Primary School, Jawahar Nagar, Bermo Bermo Block Bermo East 8,94,040.00 Completed
617 2022-23 BALA Painting at Upgraded Middle School, Bodia Bermo Bermo Block Bermo East 7,94,465.00 Completed
618 2022-23 BALA Painting at Upgraded Middle School, Pipradih, Nawadih Nawadih Block Kanjkiro 13,10,120.00 Completed
619 2022-23 BALA Painting at NEO Primary School, Malatongaria, Bermo Bermo Block Bermo East 2,91,830.00 Completed
620 2022-23 BALA Painting at Upgraded Middle School, Jagasur, Aaldih, Jaridih Jaridih Block Araldih 12,37,040.00 Completed
621 2022-23 Repair of Community Health Centre, Gomia Gumia Block Gomia 92,99,000.00 On going
622 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Tua Tongri in Kusumdih, Armo Bermo Block Armo 5,25,800.00 Completed
623 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Aadar Pathar in Boriyadih Chandankiyari Block Boriyadih 5,25,800.00 Completed
624 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at middle school of Muktapur Chandankiyari Block Boriyadih 5,25,800.00 Completed
625 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Durgapur Chowk of Asansol Chandankiyari Block Devgram 5,25,800.00 Completed
626 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Devgram Chandankiyari Block Devgram 5,25,800.00 Completed
627 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Middle school of Devgram Chandankiyari Block Devgram 5,25,800.00 Completed
628 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in front of Sansad Bhawan of Nayawan Chandankiyari Block Nayawon 5,25,800.00 Completed
629 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Upgraded school of Nayawan Chandankiyari Block Nayawon 5,25,800.00 Completed
630 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Tilatand village of Silfore Chandankiyari Block Silfor 5,25,800.00 Yet to Start
631 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Fatehpur village of Silfore Chandankiyari Block Silfor 5,25,800.00 Yet to Start
632 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Chikchiki Tand village of Silfore Chandankiyari Block Silfor 5,25,800.00 Yet to Start
633 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Talgadia village of Silfore Chandankiyari Block Silfor 5,25,800.00 Completed
634 2022-23 Construction of a Playground under the scheme of Veer Shaheed Poto ho in front of Jhgrahibad Shiv Mandir Chandrapura Block Dugda East 5,25,800.00 Completed
635 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Kumbhari Chas Block Kumhari 5,25,800.00 Completed
636 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Pindrajora Chas Block Pindrajora 5,25,800.00 Completed
637 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Putkadih of Badkiputru Tola Gumia Block Badki Chidri 5,25,800.00 Completed
638 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Dhadri of Badki Punnu Gumia Block Badki Chidri 5,25,800.00 Completed
639 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho behind of ungraded middle school in bandh Gumia Block Bandh 5,25,800.00 Completed
640 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Israel Ansari High School of Jhirke Gumia Block Jhirke 5,25,800.00 Completed
641 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at new primary school of siyari Gumia Block Siyari 5,25,800.00 Completed
642 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Belhor dera of Kaso Gumia Block Siyari 5,25,800.00 Completed
643 2022-23 Construction of Playground ground leveling work under the scheme of Veer Shaheed Poto ho of sindhu kandu in Kasiadih village Gumia Block Tikahara 5,25,800.00 Completed
644 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Dania village Gumia Block Tilaiya 5,25,800.00 Completed
645 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Panchayat Tillaiya, Modho village Gumia Block Tilaiya 5,25,800.00 Completed
646 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Kundrumghutu (Khntri) Jaridih Block Khutri 5,25,800.00 Yet to Start
647 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Ambedkar Nagar Jaridih Block Tatri South 5,25,800.00 Completed
648 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Kasmar Kasmar Block Kasmar 5,25,800.00 Completed
649 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in front of sapahitand of Binod bihari mahato collage Kasmar Block Manjura 5,25,800.00 Completed
650 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in Parsabeda at Goiyato Nawadih Block Goniyato 5,25,800.00 Completed
651 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in gobardih at Kacho GP Nawadih Block Kacho 5,25,800.00 Completed
652 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Palamu Ansh Nawadih Block Palamu 5,25,800.00 Completed
653 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in Upgraded High School, Patki Khata 01 plot 581 Peterwar Block Patki 5,25,800.00 Completed
654 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in Upgraded High School, Rangamati Peterwar Block Patki 5,25,800.00 Completed
655 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in the land of Sarwajanik, Mirjapur Peterwar Block Patki 5,25,800.00 Completed
656 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in Rangmati, Nawadih Peterwar Block Patki 5,25,800.00 Completed
657 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in the land of Mayapur Peterwar Block Mayapur 5,25,800.00 Yet to Start
658 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Gandko Bermo Block Armo 5,25,800.00 Completed
659 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Mayapur under Petarwar Block District Peterwar Block mayapur 5,25,800.00 Completed
660 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Khetko under Petarwar Block District Peterwar Block khetko 5,25,800.00 Completed
661 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Bagula Chandankiyari Block Bagula 5,25,800.00 Completed
662 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at behind of Deultand UMV Chandankiyari Block Lalpur 5,25,800.00 Completed
663 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Upgraded Primary School, Beda Basti Chandrapura Block Dugda East 5,25,800.00 Completed
664 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at badki pannu Gumia Block Badki Chidri 5,25,800.00 Completed
665 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in Chaspania of Banchas Jaridih Block Araldih 5,25,800.00 Completed
666 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in Penghata Ghat of Bhandara Nawadih Block Baradih 5,25,800.00 Completed
667 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Upgraded High School, Kartik Chandra Sharma Chas Block Pupunki 5,25,800.00 Completed
668 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Upgraded High School, Chandankiyari Chandankiyari Block Mahal East 5,25,800.00 Completed
669 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Upgraded High School, Dugda, Chandrapura Chandrapura Block Dugda East 5,25,800.00 Completed
670 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho at Upgraded High School, Gumia Gumia Block Gomia 5,25,800.00 Completed
671 2022-23 Construction of 4 nos of shade (11 nos of Gazebo) in Kasmar Kasmar Block Kasmar 27,18,800.00 Completed
672 2022-23 BALA Painting at Middle School, Amlabad, Chandankiyari Chandankiyari Block Amlabad 18,39,670.00 Completed
673 2022-23 BALA Painting at Kasturba Gandhi Girls Residential School, Bermo, Durga East, Chandrapura Chandankiyari Block Dugda East 38,56,335.00 Completed
674 2022-23 BALA Painting at Kasturba Gandhi Girls Residential School, Peterwar, Tenughat, Peterwar Peterwar Block Tenughat 54,41,485.00 Completed
675 2022-23 BALA Painting at Kasturba Gandhi Girls Residential School, Chandankiyari Chandankiyari Block Chandankiyari East 54,71,200.00 Completed
676 2022-23 BALA Painting at Kasturba Gandhi Girls Residential School, Gomia, Sarhachiya, Gomia Gumia Block Sarhachiya 56,28,980.00 Completed
677 2022-23 BALA Painting at Kasturba Gandhi Girls Residential School, Nawadih Nawadih Block Nawadih 45,78,840.00 Completed
678 2022-23 BALA Painting at Kasturba Gandhi Girls Residential School, Jaridih, Baradih, Jaridih Jaridih Block Baradih 47,48,275.00 Completed
679 2022-23 Construction of Playground under the scheme of Veer Shaheed Poto ho in Aadiwasi High school, Chhappargada Peterwar Block Dharwa Tand 5,25,800.00 Completed
680 2023-24 Construction of PCC road from Raja Babu's house to the Graveyard. Chas Block Karhariya 22,63,600.00 Completed
681 2023-24 Construction of PCC road at Dumarghutu of kanari west GP of Chas Block. Chas Block Kanari West 21,95,700.00 Completed
682 2023-24 Construction of Guardwall and road from Gwai river bridge under rani chidka to kulhi hari temple in chas block. Chas Block Kumardhaga 14,28,800.00 On going
683 2023-24 Construction of stair and bathing step in Bagraibera near Garga river under udkrit GP of Chas block. Chas Block Ukrid 22,00,000.00 Completed
684 2023-24 Construction of Hall of Rajkiyakrit Middle School at Jaridih Bazar, Block Bermo Bermo Block Jaridih East 22,31,500.00 Completed
685 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Champi under Petarwar Block District Peterwar Block Chapi 5,25,800.00 Completed
686 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Chalkari under Petarwar Block District Peterwar Block Chalkari North 5,25,800.00 Completed
687 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Pichhari South under Petarwar Block District Peterwar Block Angwali South 5,25,800.00 Completed
688 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Angwali South under Petarwar Block District Peterwar Block Angwali South 5,25,800.00 Completed
689 2022-23 Preparation of Playground and Construction of Changing Room with Two Units Toilets and Boring Installation with Hand Pump at Angwali North under Petarwar Block District Peterwar Block Angwali North 5,25,800.00 Completed
690 2022-23 Construction of Poto Ho Playground at Kalyneshwari High School, Bahadurpur Chas Block Sonabad 5,25,800.00 Completed
691 2022-23 Installation of modern materials & equipment related to Smart Classes for 62 nos of schools in Bokaro District. Bokaro District Bokaro District 54,000.00 Completed
692 2023-24 Construction of CLF building at Panchayat Uttasara Peterwar Block Uttasara 65,82,800.00 On going
693 2023-24 Construction of AWC building at Lahatand,Panchayat Ulgaddha, Petarwar Peterwar Block Ulgadda 11,72,600.00 Yet to Start
694 2023-24 Construction of AWC building at Partand Khetko Peterwar Block Khetko 11,72,600.00 On going
695 2023-24 Construction of AWC building at Veerchua Khetko Peterwar Block Khetko 11,72,600.00 On going
696 2023-24 Construction of AWC building at Thakur Tola, Panchayat Khetko Peterwar Block Khetko 11,72,600.00 Completed
697 2023-24 Construction of Road and Bridge from Ambedkar Colony to Baal Bekar to Marriage Mandap (Bagicha) Bermo Block Bermo East 2,41,10,400.00 Completed
698 2023-24 Construction of PCC road & RCC drain with cover slab from shop of Binod naik to dargah and from H/o Sanjay Thakur to H/o Chowkidar via Dargah at Khetko GP of Peterwar Block Peterwar Block Khetko 1,34,19,600.00 Completed
699 2023-24 Construction of 2km road from bahadurpur pipe factory to khanjo river road end at Baridih GP of Jaridih block Jaridih Block Baradih 99,63,100.00 Completed
700 2023-24 Construction of Boundary wall at Pindrajora +2 school under chas block Chas Block Pindrajora 90,94,400.00 Completed
701 2023-24 Construction of PCC road from Dungri Goda Hatia Maida to Jehra Sthal Hutupatthar via Sunta Railway gate of Chas Block Chas Block Sunta 98,36,800.00 Completed
702 2023-24 Construction of PCC road till kanari west kanari from west village barodih tola GP of chas block Chas Block Kanari West 31,58,000.00 Completed
703 2023-24 Construction of PCC road from Barodih's RWD road to Khedabeda of Chas Block Chas Block Chainpur 35,73,273.00 Completed
704 2023-24 Construction of PCC road over west GP from Jhikalpa to shikaridih via parsadih, Knari of Chas Block Chas Block Kanari West 99,64,000.00 Completed
705 2023-24 Construction of PCC road from Sunta GP of Sudani toppo to public distribution of dugrigoda system shop of Chas Block Chas Block Sunta 18,31,000.00 Completed
706 2023-24 Construction of PCC road from Sunta tola kashitand to the house of late Ram Prasad in Chas block Chas Block Sunta 13,74,000.00 Completed
707 2023-24 Construction of PCC road from Manjhithan to the house of Mangroo Manjhi in the village of barudih of Chainpur GP of chas block Chas Block Chainpur 8,71,000.00 Completed
708 2023-24 Construction of PCC road from the house of Birju Ghatwar to the house of bhulu dhobi in chas block Chas Block Karhariya 38,11,700.00 On going
709 2023-24 Construction of Chhath Ghat in Bhagat Pond in Gumia GP of Gumia Block Gumia Block Gomia 15,00,000.00 Completed
710 2023-24 Construction of PCC road, culvert and guardwall on both sides from Mahendra Bhandari's house to Madhya Durga Temple in Gomia GP of Gomia Block Gumia Block Gomia 23,50,000.00 Completed
711 2023-24 Construction of 1.25km PCC road from Old cinema hall in Palihari Gurudih GP of Gomia block to Railway Station Gomia. Gumia Block Palihaari Gurudih 60,00,000.00 Completed
712 2023-24 Construction of 600m PCC road from CPP power plant to the crematorium in Kathara GP of Gomia block. Gumia Block Kathara 30,00,000.00 Completed
713 2023-24 Construction of PCC road froom pipradih panch mandir to railway line on the way to Gomia station in Swang west GP of Gomia Block Gumia Block Sawang North 48,70,000.00 Completed
714 2023-24 Construction of 500 m drain with cover from seva sadan hospital to railway line in Palihari Gurdih GP of Gomia Block Gumia Block Palihaari Gurudih 40,00,000.00 Completed
715 2023-24 Construction of 2km PCC road and guard wall from Dam Basti main road to Bokaro river in Bandh GP of Gomia block. Gumia Block Bandh 99,50,000.00 Completed
716 2023-24 Construction of Auditorium Hall (500 seats) at Kasturba gandhi Girl High School under Chas Block Chas Block Ward No - 28 2,03,80,800.00 Completed
717 2023-24 Construction of Auditorium Hall (500 seats) at Kasturba gandhi Girl High School under Gumia Block Gumia Block Tenughat 2,03,80,800.00 Completed
718 2023-24 Construction of Auditorium Hall (500 seats) at Kasturba gandhi Girl High School under Chandrapura Block Chandrapura Block Chandrapura 2,03,80,800.00 On going
719 2023-24 Construction of Auditorium Hall (500 seats) at Kasturba gandhi Girl High School under Peterwar Block Peterwar Block Tenughat 2,03,80,800.00 Completed
720 2023-24 Construction of Auditorium Hall (500 seats) at Kasturba gandhi Girl High School under Chandankiyari Block Chandankiyari Block Chandankiyari East 2,03,80,800.00 Completed
721 2023-24 Construction of PCC road up to Gawai river crematorium in Chandipur village of Kusumkiyari Panchayat in Chandankiyari Block under Bokaro District Chandankiyari Block Kusumkiyari 99,80,300.00 Completed
722 2023-24 Construction of guard wall on Bajrangbali Mandir mor singh tola via railway line main road of mahal village under Chandankiyari block. Chandankiyari Block Mahal East 93,85,300.00 Completed
723 2023-24 Construction of waiting hall and Miscellaneous work at Campus of Sadar Hospital Bokaro Bokaro Steel City Sector-1 96,83,000.00 Completed
724 2023-24 Construction of Civil and Electrical work for installation of lift at Sadar Hospital Bokaro Chas Block Sector-1 13,96,400.00 Completed
725 2023-24 Repairing and Renovation of Palash Mart at Bokaro Bokaro Steel City Sector-1 21,46,900.00 Completed
726 2023-24 Renovation and redevelopment of Sadar Hospital, Bokaro Bokaro Steel City Sector-1 2,39,58,000.00 Completed
727 2023-24 Construction of PCC road from Baudih more to Khergora, of Chainpur Panchayat of Chas Block under Bokaro District. Chas Block Chainpur 43,44,800.00 Completed
728 2023-24 Construction of PCC road from Lalpur Panchayat Jhabra Community building to Bhelatand Sati Dhan River Ghat under Bokaro District (1.750 km) Chandankiyari Block Lalpur 99,20,800.00 On going
729 2023-24 Construction of PCC path and Guard wall from Bokaro Thermal Station to Chhat Ghat Bermo Block Govindpur F 61,31,100.00 Completed
730 2023-24 Construction of PCC road and drain from DBC office to Akhilesh Singh's residence up to Hirak Road near Bermo Durga Mandap. Bermo Block Basgora East 45,53,200.00 Completed
731 2023-24 Construction of PCC road at Hanslata village of Dantu GP under Kasmar block from Hanslata REO road to new purabtand. Kasmar Block Daatu 55,30,200.00 Completed
732 2023-24 Construction of PCC road at Hanslata village of Dantu GP under Kasmar block from Bajrangbali Temple to the house of Sadhu Singh Kasmar Block Daatu 48,97,300.00 Completed
733 2023-24 Construction of PCC Road from Nuniyadih village of Kusumkiyari Panchayat under Bokaro District to Chandipur Village Kusumkiyari Bara Dam. (0.850 km) Chandankiyari Block Kusumkiyari 99,80,300.00 Completed
734 2023-24 Construction of road in Chando village of Chalkari GP from Kalikaran road to Ragnigoda mokhapani kali manjhi's house up to the canal bridge. Peterwar Block Chalkari North 2,12,14,000.00 Completed
735 2023-24 Construction of PCC road from Pachora mod to Chirubeda in the Mango GP under Chas block. Chas Block Mango 99,43,100.00 Completed
736 2023-24 Construction of PCC road from the land of Manohar Kumar to the house of Amit kumar at Baradih GP under Jaridih Block Jaridih Block Baradih 8,15,800.00 On going
737 2023-24 Construction of AWC building at Asnapani Center no - 517, Panchayat Kanthnan, Gomiya, Bokaro Gumia Block Kathara 11,72,600.00 Completed
738 2023-24 Construction of AWC building at Dudhmatia Center no - 518, Panchayat Banth, Gomila Gumia Block Bandh 11,72,600.00 Completed
739 2023-24 Construction of AWC building at Palani (Mini) Center no - 525, Panchayat Bandh, Gomiya Gumia Block Bandh 11,72,600.00 Yet to Start
740 2023-24 Construction of AWC building at Rathtand Center no - 704, Panchayat Hosir Gomiya, Gumia Block Hosir East 11,72,600.00 Completed
741 2023-24 Construction of AWC building at Dhende Niche Tola Center no - 707 Gumia Block Hosir East 11,72,600.00 Yet to Start
742 2023-24 Construction of AWC building at Keri Niche Tola Center no - 824 Gumia Block Lalpaniya 11,72,600.00 Completed
743 2023-24 Construction of AWC building at Badki Punnu Center no - 1022 Gumia Block Badki Punnu 11,72,600.00 Completed
744 2023-24 Construction of AWC building at Tongari Basti Center no - 1027 Gumia Block Badki Punnu 11,72,600.00 Yet to Start
745 2023-24 Construction of AWC building at Post Office Mohalla, GP Badkipunnu block Gomia Center no - 1030 Gumia Block Badki Punnu 11,72,600.00 Completed
746 2023-24 Construction of AWC building at Harijan Tola Center no - 629 Gumia Block Jhirke 11,72,600.00 Yet to Start
747 2023-24 Construction of AWC building at Yadav Tola Center no - 630 Gumia Block Jhirke 11,72,600.00 Completed
748 2023-24 Construction of AWC building at Bich Tola Center no - 631 Gumia Block Jhirke 11,72,600.00 Yet to Start
749 2023-24 Construction of AWC building at Lahariya Tand Center no - 13 Bermo Block Govindpur A 11,72,600.00 Completed
750 2023-24 Construction of AWC building at Raja Bajar -1 Center no-14 Bermo Block Govindpur A 11,72,600.00 Yet to Start
751 2023-24 Construction of AWC building at Jarangdih Bajar Center no - 19 Bermo Block Jarangdih North 11,72,600.00 Yet to Start
752 2023-24 Construction of AWC building at Lahariya Tand Center no - 13 Bermo Block Jarangdih South 11,72,600.00 Completed
753 2023-24 Construction of AWC building at Bermo Basti Center no - 189 Bermo Block Bermo East 11,72,600.00 On going
754 2023-24 Construction of AWC building at Pipal Jhopadpatti Centre no - 204 Bermo Block Govindpur A 11,72,600.00 Yet to Start
755 2023-24 Construction of AWC building at Nishan Haat Center no - 205 Bermo Block Govindpur B 11,72,600.00 Completed
756 2023-24 Construction of AWC building at Manjhi Tola Center No - 212 Bermo Block Jarangdih South 11,72,600.00 Completed
757 2023-24 Construction of AWC building at Mansa Nagar Center no - 223 Bermo Block Jarangdih South 11,72,600.00 Completed
758 2023-24 Construction of AWC building at Six Unit Center no - 224 Bermo Block Govindpur A 11,72,600.00 Completed
759 2023-24 Construction of AWC building at Phase - 2, Center no - 225 Bermo Block Govindpur B 11,72,600.00 Completed
760 2023-24 Construction of AWC building at Turiyo GP under Chandrpura Block Chandrapura Block Turio 11,72,600.00 Completed
761 2023-24 Construction of AWC building at Karmatand GP under Chandrapura Block Chandrapura Block Karma Tand 11,72,600.00 Completed
762 2023-24 Construction of AWC building at Middle Telo GP under Chandrapura Block Chandrapura Block Telo Middle 11,72,600.00 On going
763 2023-24 Construction of AWC building at East Telo GP under Chandrapura Block Chandrapura Block Telo East 11,72,600.00 On going
764 2023-24 Construction of AWC building at Paplo GP under Chandrapura Block Chandrapura Block Paplo 11,72,600.00 On going
765 2023-24 Construction of AWC building at Telo West GP under Chandrapura Block Chandrapura Block Telo West 11,72,600.00 Completed
766 2023-24 Construction of AWC building at Bandiyo GP under Chandrapura Block Chandrapura Block Bandio 11,72,600.00 Completed
767 2023-24 Construction of Check Dam in the drain located near of Surya Mandir at Baidhkaro East GP under Bermo Block of Bokaro District Bermo Block Baidhkaro East 64,08,600.00 Completed
768 2023-24 Construction of Chhat Ghat in the drain located near of Surya Mandir at Baidhkaro East GP under Bermo Block of Bokaro District Bermo Block Baidhkaro East 10,73,100.00 Completed
769 2023-24 Construction of AWC building at Dantu GP under Kasmar Block (Center no - 115) Kasmar Block Daatu 11,72,600.00 On going
770 2023-24 Construction of AWC building at Kasmar Chatti of Kasmar GP under Kasmar Block (Center no - 127) Kasmar Block Kasmar 11,72,600.00 Yet to Start
771 2023-24 Construction of AWC building at Kumri Tola of Kasmar GP under Kasmar Block (Center no - 129) Kasmar Block Kasmar 11,72,600.00 Yet to Start
772 2023-24 Construction of AWC building at Surajdih Muslim tola of Kasmar GP under Kasmar Block (Center no - 131) Kasmar Block Kasmar 11,72,600.00 Completed
773 2023-24 Construction of AWC building at Bandotand of Kasmar GP under Kasmar Block (Center no - 132) Kasmar Block Kasmar 11,72,600.00 Yet to Start
774 2023-24 Construction of AWC building at Baraitola Ghasi tola of Baraikala GP under Kasmar Block (Center no - 313) Kasmar Block Barikala 11,72,600.00 Yet to Start
775 2023-24 Construction of AWC building at Muslim Tola, Tantri Center no - 2 Jaridih Block Tatri South 11,72,600.00 Yet to Start
776 2023-24 Construction of AWC building at Tupkadih Khas Center no - 10 Jaridih Block Tatri South 11,72,600.00 Completed
777 2023-24 Construction of AWC building at Kukurtopa, Chilgadda GP at Jaridih block Jaridih Block Chilgadda 11,72,600.00 Completed
778 2023-24 Construction of AWC building at Baradih Nichetola Center no - 105 Jaridih Block Baradih 11,72,600.00 On going
779 2023-24 Construction of AWC building at Kendua tola of Bandh GP under Gomia Block Gumia Block Bandh 11,72,600.00 Yet to Start
780 2023-24 Construction of AWC building at Chatki Punnu of Badki Punnu GP under Gomia Block Gumia Block Badki Punnu 11,72,600.00 Yet to Start
781 2023-24 Construction of AWC building at Tarwagada Muslim Tola of Badki Punnu GP under Gomia Block Gumia Block Badki Punnu 11,72,600.00 Yet to Start
782 2023-24 Construction of AWC building at Chatniya Tola of Badki Punnu GP under Gomia Block Gumia Block Badki Punnu 11,72,600.00 Yet to Start
783 2023-24 Construction of AWC building at Amba Tola of Badki Punnu GP under Gomia Block Gumia Block Badki Punnu 11,72,600.00 Yet to Start
784 2023-24 Construction of AWC building at Prajapati Tola of Hajari GP under Gomia Block Gumia Block Hazari 11,72,600.00 Completed
785 2023-24 Construction of AWC building at Lattkutha of Palihari Gurudih GP under Gomia Block Gumia Block Palihaari Gurudih 11,72,600.00 Completed
786 2023-24 Construction of AWC building at Kothitand of Palihari Gurudih GP under Gomia Block Gumia Block Palihaari Gurudih 11,72,600.00 Yet to Start
787 2023-24 Construction of AWC building at Bhadwa Khet of Palihari Gurudih GP under Gomia Block Gumia Block Palihaari Gurudih 11,72,600.00 Completed
788 2023-24 Construction of AWC building at Kothitand Maidan of Palihari Gurudih GP under Gomia Block Gumia Block Palihaari Gurudih 11,72,600.00 Completed
789 2023-24 Construction of AWC building at Choudhary Tola of Gomia GP under Gomia Block (Center No-416) Gumia Block Gomia 11,72,600.00 Yet to Start
790 2023-24 Construction of AWC building at Harijan Tola of Gomia GP under Gomia Block (Center No-417) Gumia Block Gomia 11,72,600.00 On going
791 2023-24 Construction of AWC building at Padaria of Gomia GP under Gomia Block (Center No-418) Gumia Block Gomia 11,72,600.00 Completed
792 2023-24 Construction of AWC building at Bangla Tand of Gomia GP under Gomia Block (Center No-419) Gumia Block Gomia 11,72,600.00 Completed
793 2023-24 Construction of AWC building at Modi Tola of Gomia GP under Gomia Block (Center No-421) Gumia Block Gomia 11,72,600.00 Completed
794 2023-24 Construction of AWC building at Prajapati Tola of Gomia GP under Gomia Block (Center No-422) Gumia Block Gomia 11,72,600.00 Yet to Start
795 2023-24 Construction of AWC building at Karmali Tola of Gomia GP under Gomia Block (Center No-423) Gumia Block Gomia 11,72,600.00 Yet to Start
796 2023-24 Construction of AWC building at Kali Mandir Post Office Mohalla of Gomia GP under Gomia Block (Center No-424) Gumia Block Gomia 11,72,600.00 Yet to Start
797 2023-24 Construction of AWC building at Dharwatand Upar Tola, Petarwar Peterwar Block Dharwa Tand 11,72,600.00 Completed
798 2023-24 Construction of AWC building at Ghararitand Peterwar Block Chapi 11,72,600.00 Yet to Start
799 2023-24 Renovation of Krishi Vigyan Kendra (KVK) located in Petarwar block under Bokaro District Peterwar Block Bundu 99,48,000.00 Completed
800 2023-24 Construction of AWC building at Rohaniya Tand-2 of Amlabad GP under Chandankiyari Block (Center No-311) Chandankiyari Block Amlabad 11,72,600.00 Completed
801 2023-24 Construction of AWC building at Premnagar of Amlabad GP under Chandankiyari Block (Center No-312) Chandankiyari Block Amlabad 11,72,600.00 Completed
802 2023-24 Construction of AWC building at Aaluwada-2 of Batbinor GP under Chandankiyari Block (Center No-197) Chandankiyari Block Batbinor 11,72,600.00 Completed
803 2023-24 Construction of AWC building at Mahato Tola of Batbinor GP under Chandankiyari Block (Center No-254) Chandankiyari Block Batbinor 11,72,600.00 Completed
804 2023-24 Construction of AWC building at Ankadogoda of Chandra GP under Chandankiyari Block (Center No-68) Chandankiyari Block Chandra 11,72,600.00 Yet to Start
805 2023-24 Construction of AWC building at Karkatta-2 of Chandra GP under Chandankiyari Block (Center No-248) Chandankiyari Block Chandra 11,72,600.00 Completed
806 2023-24 Construction of AWC building at Karkatta Musmil Tola-1 of Chandra GP under Chandankiyari Block (Center No-260) Chandankiyari Block Chandra 11,72,600.00 Yet to Start
807 2023-24 Construction of AWC building at Chandra Gorai tola of Chandra GP under Chandankiyari Block (Center No-268) Chandankiyari Block Chandra 11,72,600.00 Completed
808 2023-24 Construction of AWC building at Chandankiyari Bawri tola of Chandankiyari West GP under Chandankiyari Block (Center No-62) Chandankiyari Block Chandankiyari West 11,72,600.00 Completed
809 2023-24 Construction of AWC building at Asansol of Debgram GP under Chandankiyari Block (Center No-15) Chandankiyari Block Devgram 11,72,600.00 Completed
810 2023-24 Construction of AWC building at Upar Bandh of Debgram GP under Chandankiyari Block (Center No-16) Chandankiyari Block Devgram 11,72,600.00 Completed
811 2023-24 Construction of AWC building at Simultand of Debgram GP under Chandankiyari Block (Center No-141) Chandankiyari Block Devgram 11,72,600.00 Completed
812 2023-24 Construction of AWC building at Gandharbdih Modi tola of Debgram GP under Chandankiyari Block (Center No-235) Chandankiyari Block Devgram 11,72,600.00 Completed
813 2023-24 Construction of AWC building at Chandipur-1 of Kusumkiyari GP under Chandankiyari Block (Center No-89) Chandankiyari Block Kusumkiyari 11,72,600.00 Completed
814 2023-24 Construction of AWC building at Gahira of Mahal West GP under Chandankiyari Block (Center No-19) Chandankiyari Block Mahal West 11,72,600.00 Completed
815 2023-24 Construction of AWC building at Nawdiha of Nawdiha GP under Chandankiyari Block Chandankiyari Block Nawdiha 11,72,600.00 Yet to Start
816 2023-24 Construction of AWC building at Hussaindih of Nawdiha GP under Chandankiyari Block (Center No-201) Chandankiyari Block Nawdiha 11,72,600.00 Completed
817 2023-24 Construction of AWC building at Talgadia of Silfor GP under Chandankiyari Block (Center No-05) Chandankiyari Block Silfor 11,72,600.00 On going
818 2023-24 Construction of AWC building at Beltand of Silfor GP under Chandankiyari Block (Center No-195) Chandankiyari Block Silfor 11,72,600.00 On going
819 2023-24 Construction of AWC building at Rangmatia-1 of Simuliya GP under Chandankiyari Block (Center No-56) Chandankiyari Block Simuliya 11,72,600.00 Completed
820 2023-24 Construction of AWC building at Rangmatia-2 of Simuliya GP under Chandankiyari Block (Center No-191) Chandankiyari Block Simuliya 11,72,600.00 Completed
821 2023-24 Construction of AWC building at Lututand of Simuliya GP under Chandankiyari Block (Center No-214) Chandankiyari Block Simuliya 11,72,600.00 Completed
822 2023-24 Construction of AWC building at Simuliya-2 of Simuliya GP under Chandankiyari Block (Center No-221) Chandankiyari Block Simuliya 11,72,600.00 Completed
823 2023-24 Construction of AWC building at Simuliya Mahato Tola of Simuliya GP under Chandankiyari Block (Center No-269) Chandankiyari Block Simuliya 11,72,600.00 Completed
824 2023-24 Construction of AWC building at Simuliya Mahato Tola of Simuliya GP under Chandankiyari Block (Center No-270) Chandankiyari Block Simuliya 11,72,600.00 Completed
825 2023-24 Construction of AWC building at Bandhtand Harijan Tola of Simuliya GP under Chandankiyari Block (Center No-302) Chandankiyari Block Simuliya 11,72,600.00 On going
826 2023-24 Construction of AWC building at Harijan Basti of Karmatand GP under Chandrapura Block Chandrapura Block Karma Tand 11,72,600.00 Completed
827 2023-24 Construction of AWC building at Budhidih-2 of Karmatand GP under Chandrapura Block Chandrapura Block Karma Tand 11,72,600.00 Completed
828 2023-24 Construction of AWC building at Budhidih-3 of Karmatand GP under Chandrapura Block Chandrapura Block Karma Tand 11,72,600.00 Completed
829 2023-24 Construction of AWC building at Sarayatand of Taranga GP under Chandrapura Block Chandrapura Block Taranga 11,72,600.00 Completed
830 2023-24 Construction of AWC building at Gadibasti-2 of Taranga GP under Chandrapura Block Chandrapura Block Taranga 11,72,600.00 Yet to Start
831 2023-24 Construction of AWC building at Tarmi-1 of Tarmi GP under Chandrapura Block Chandrapura Block Tarmi 11,72,600.00 Yet to Start
832 2023-24 Construction of AWC building at Tarmi-3 of Tarmi GP under Chandrapura Block Chandrapura Block Tarmi 11,72,600.00 Yet to Start
833 2023-24 Construction of AWC building at Tarmi-4 of Tarmi GP under Chandrapura Block Chandrapura Block Tarmi 11,72,600.00 Completed
834 2023-24 Construction of AWC building at Binod Chowk of Tarmi GP under Chandrapura Block Chandrapura Block Tarmi 11,72,600.00 On going
835 2023-24 Construction of AWC building at Turiyo Ghoda of Turiyo GP under Chandrapura Block Chandrapura Block Turio 11,72,600.00 On going
836 2023-24 Construction of AWC building at Chirudih-2 of Turiyo GP under Chandrapura Block Chandrapura Block Turio 11,72,600.00 Yet to Start
837 2023-24 Construction of AWC building at Saraya Tand Pakhoriya of Turiyo GP under Chandrapura Block Chandrapura Block Turio 11,72,600.00 On going
838 2023-24 Construction of AWC building at Bhandaridah Pakhoriya of Turiyo GP under Chandrapura Block Chandrapura Block Turio 11,72,600.00 Yet to Start
839 2023-24 Construction of AWC building at Rajabora Pakhoriya of Turiyo GP under Chandrapura Block Chandrapura Block Turio 11,72,600.00 Yet to Start
840 2023-24 Construction of Guardwall and Ghat in Mahato Tola, Rohaniyatand of Penk GP under Nawadih Block Nawadih Block Penk 44,58,100.00 Completed
841 2023-24 Construction of PCC road and Guardwall from Barwapani Doctor's house to the main road via river in Penk GP under Nawadih Block Nawadih Block Penk 54,14,700.00 Completed
842 2023-24 Construction of Boundary Wall, Street Light, Gazebo and Leveling of Ground at Residential High School Mirdha under Chas Block Chas Block Mirdha 63,34,300.00 Completed
843 2023-24 Construction of Market Complex in Garri GP under Kasmar Block Kasmar Block Garri 3,14,81,000.00 On going
844 2023-24 Construction of Boundary Wall, Toilet and Gallery and leveling work of playground in the upgraded high school Sonabad under Chas block of Bokaro District. Chas Block Sonabad 64,14,800.00 Completed
845 2023-24 Construction of toilets, Gallery and leveling work of the playground in Sarvodaya +2 High School, Pindrajora under Chas Block of Bokaro District. Chas Block Pindrajora 34,55,800.00 Completed
846 2023-24 Construction of Boundary Wall, toilet and Gallery in Upgraded Government High School, Goniato under Nawadih Block of Bokaro District. Nawadih Block Goniyato 50,10,000.00 Completed
847 2023-24 Construction of Boundary Wall, Toilet, Gallery and Sports Playground in the Upgraded Government High School, Penk under Nawadih Block of Bokaro District. Nawadih Block Penk 59,07,500.00 Completed
848 2023-24 Construction of Boundary Wall, Toilet, Gallery and Sports Playground in the Upgraded Government High School, Birni under Nawadih Block of Bokaro District. Nawadih Block Birni 28,83,500.00 Completed
849 2023-24 Construction of Boundary Wall and Toilet in the Government High School, Mango under Chas Block of Bokaro District. Chas Block Mango 36,55,100.00 Completed
850 2023-24 Construction of Panchayat Building At Arjua GP under Peterwar Block Peterwar Block Arjuba 99,89,000.00 Completed
851 2023-24 Construction of Panchayat Building At Kasmar GP under Kasmar Block Kasmar Block Kasmar 99,89,000.00 Completed
852 2023-24 Construction of Panchayat Building At Ponda GP under Kasmar Block Kasmar Block Ponda 99,89,000.00 Completed
853 2023-24 Construction of Panchayat Building At Sonpura GP under Kasmar Block Kasmar Block Sonpura 99,89,000.00 Completed
854 2023-24 Construction of Panchayat Building At Tantri South GP under Jaridih Block Jaridih Block Tatri South 99,89,000.00 On going
855 2023-24 Construction of Panchayat Building At Kumir Dobha GP under Chandankiyari Block Chandankiyari Block Kumirdoba 99,89,000.00 Completed
856 2023-24 Construction of Panchayat Building At Kusumkiyari GP under Chandankiyari Block Chandankiyari Block Kusumkiyari 99,89,000.00 On going
857 2023-24 Construction of Panchayat Building At Sunata GP under Chas Block Chas Block Sunta 99,89,000.00 Completed
858 2023-24 Construction of Panchayat Building At Khamarbendi GP under Chas Block Chas Block Khamar Bendi 99,89,000.00 Completed
859 2023-24 Construction of Paver Block and other miscellaneous works in Gandhi Gram premises of Siyari panchayat under Gomia Block. Gumia Block Siyari 68,70,000.00 Completed
860 2023-24 Engagement of support staff (doctors, Medical staff & etc.) around District. Phase-2 Bokaro District Bokaro District 60,36,000.00 Completed
861 2023-24 Repairing and renovation of Scheduled caste boys welfare hostels (4nos) at Mirdha under Chas Block Chas Block Mirdha 91,90,800.00 Completed
862 2023-24 Construction of CLF building at Panchayat Manjura Kasmar Block Manjura 65,82,800.00 Completed
863 2023-24 Strengthening of source by Construction of intake well, Gangway supplying & layinig raw water raising main from konar river to existing WTP for Gomia Rural Water Supply Scheme Gumia Block Gomia 4,50,78,091.00 On going
864 2023-24 Installation of Modular OT at Sadar Hospital Bokaro Bokaro District Bokaro District 60,54,091.00 Completed
865 2023-24 Renovation of Primary Health Centre Hospital at Sijua, Chandrapura Chandrapura Block Sijua 2,26,11,400.00 Completed
866 2023-24 Construction of road from Chatugada Keshayari to Champi Amba tola at Champi Panchayat under Peterwar Block Peterwar Block Chapi 3,86,07,400.00 On going
867 2023-24 Construction of toilet in UPG Rajkiyakrit High School, Gunjardih under Nawadih Block Nawadih Block Gunjardih 13,41,500.00 Completed
868 2023-24 Construction of 1.05 KM road from REO road Lalpania, Beldih Chowk Etoram Kisku's house to REO main road Mithun Hembram's house via Beldih Bich tola. Gumia Block Barki Punu 94,61,800.00 Completed
869 2023-24 Construction of Boundary wall and Toilet in UPG Rajkiyakrit High School, Tangotna, under Kasmar Block Kasmar Block Tangtona 18,09,000.00 Completed
870 2023-24 Construction of Boundary wall and Toilet in +2 High School, Dantu, under Kasmar Block Kasmar Block Daatu 35,94,200.00 Completed
871 2023-24 Construction of Boundary wall, welcome gate, toilet, leveling and developing of playground of upgraded Government High School, Baraikala, Kasmar Kasmar Block Barikala 45,53,900.00 Completed
872 2023-24 Construction of Panchayat Sachivalaya building at Panchayat Angwali South Peterwar Block Angwali South 99,89,000.00 Completed
873 2023-24 Construction of Panchayat Sachivalaya building at Panchayat Patki Peterwar Block Patki 99,89,000.00 On going
874 2023-24 Construction of Panchayat Sachivalaya building at Panchayat Mayapur Peterwar Block Mayapur 99,89,000.00 On going
875 2023-24 Construction of Panchayat Sachivalaya building at Panchayat Devgram Chandankiyari Block Devgram 99,89,000.00 Completed
876 2023-24 Construction of Panchayat Sachivalaya building at Panchayat Chilgadda Jaridih Block Chilgadda 99,89,000.00 Completed
877 2023-24 Construction of PCC road from PWD road to Baradih Panchayat Bhawan under Bhendra GP of Nawadih Block. Nawadih Block Bhendra 54,44,800.00 Completed
878 2023-24 Construction of PCC road from Kaleshwar Prasad's house to Laxman Vishwakarma's house (Length 0.350KM) in Bhendra Panchayat under Nawadih Block Nawadih Block Bhendra 46,44,400.00 On going
879 2023-24 Construction of PCC road from Shankar Chaurasia's house to Water tower (length 1.030KM) in Bhendra Panchayat under Nawadih Block Nawadih Block Bhendra 99,90,500.00 Completed
880 2023-24 Construction of PCC road from Ajit Viswakarma's hotel to Rajatand Yatri (length 0.760 KM) in Bhendra Panchayat under Nawadih Block Nawadih Block Bhendra 99,95,500.00 On going
881 2023-24 Construction of PCC road from Bandhubarg Library to Yadav tola Jamuniya bridge (length 1.200 KM) in Bhendra Panchayat under Nawadih Block Nawadih Block Bhendra 90,78,400.00 Completed
882 2023-24 Construction of AWC building at Armo-1 village of Armo GP under Bermo Block Bermo Block Armo 11,72,600.00 Completed
883 2023-24 Construction of AWC building at Bondhkaro village of Bondhkaro East GP under Bermo Block Bermo Block Baidhkaro East 11,72,600.00 On going
884 2023-24 Construction of AWC building at Bondhkaro village of Bondhkaro West GP under Bermo Block Bermo Block Baidhkaro West 11,72,600.00 Yet to Start
885 2023-24 Construction of AWC building at Bermo-2 village of Bermo South GP under Bermo Block Bermo Block Bermo South 11,72,600.00 On going
886 2023-24 Construction of AWC building at Bermo-3 village of Bermo South GP under Bermo Block Bermo Block Bermo South 11,72,600.00 Completed
887 2023-24 Construction of AWC building at Barwabeda village of Bermo West GP under Bermo Block Bermo Block Bermo West 11,72,600.00 Completed
888 2023-24 Construction of AWC building at Lodharbeda village of Bermo West GP under Bermo Block Bermo Block Bermo West 11,72,600.00 On going
889 2023-24 Construction of AWC building at Rajendranagar village of Bodiya South GP under Bermo Block Bermo Block Bodiya South 11,72,600.00 Completed
890 2023-24 Construction of AWC building at Choudhary Tola village of Bodiya South GP under Bermo Block Bermo Block Bodiya South 11,72,600.00 Completed
891 2023-24 Construction of AWC building at Bhalatgariya village of Bodiya South GP under Bermo Block Bermo Block Bodiya South 11,72,600.00 Completed
892 2023-24 Construction of AWC building at Jarwa Basti - 1 village of Govindpur-B GP under Bermo Block Bermo Block Govindpur B 11,72,600.00 Yet to Start
893 2023-24 Construction of AWC building at Jarwa Basti - 2 village of Govindpur-B GP under Bermo Block Bermo Block Govindpur B 11,72,600.00 Completed
894 2023-24 Construction of AWC building at Govindpur-C GP under Bermo Block Bermo Block Govindpur C 11,72,600.00 Completed
895 2023-24 Construction of AWC building at Pikhatand village of Govindpur-C GP under Bermo Block Bermo Block Govindpur C 11,72,600.00 Completed
896 2023-24 Construction of AWC building at Baisakhi Colony of Govindpur-D GP under Bermo Block Bermo Block Govindpur D 11,72,600.00 Completed
897 2023-24 Construction of AWC building at Janata Nagar of Govindpur-D GP under Bermo Block Bermo Block Govindpur D 11,72,600.00 Yet to Start
898 2023-24 Construction of AWC building at Birsa Nagar of Govindpur-D GP under Bermo Block Bermo Block Govindpur D 11,72,600.00 Yet to Start
899 2023-24 Construction of AWC building at Govindpur Basti of Govindpur-E GP under Bermo Block Bermo Block Govindpur E 11,72,600.00 Completed
900 2023-24 Construction of AWC building at Govindpur Uppar Tola of Govindpur-E GP under Bermo Block Bermo Block Govindpur E 11,72,600.00 Yet to Start
901 2023-24 Construction of AWC building at Ettabhata of Govindpur-E GP under Bermo Block Bermo Block Govindpur E 11,72,600.00 Completed
902 2023-24 Construction of AWC building at Govindpur Niche Tola of Govindpur-E GP under Bermo Block Bermo Block Govindpur E 11,72,600.00 On going
903 2023-24 Construction of AWC building at Raja Bazar - 2 of Govindpur-A GP under Bermo Block Bermo Block Govindpur A 11,72,600.00 Yet to Start
904 2023-24 Construction of AWC building at Raja Bazar Niche Tola of Govindpur-A GP under Bermo Block Bermo Block Govindpur A 11,72,600.00 Yet to Start
905 2023-24 Construction of AWC building at TaTA block of Jarangdih South GP under Bermo Block Bermo Block Jarangdih South 11,72,600.00 Yet to Start
906 2023-24 Construction of AWC building at Bazar - 1 of Jaridih East GP under Bermo Block Bermo Block Jaridih East 11,72,600.00 Yet to Start
907 2023-24 Construction of AWC building at Bazar - 2 of Jaridih East GP under Bermo Block Bermo Block Jaridih East 11,72,600.00 Yet to Start
908 2023-24 Construction of AWC building at Niche Bazar of Jaridih East GP under Bermo Block Bermo Block Jaridih East 11,72,600.00 Yet to Start
909 2023-24 Construction of AWC building at Imlipatti of Jaridih East GP under Bermo Block Bermo Block Jaridih East 11,72,600.00 Completed
910 2023-24 Construction of AWC building at Loharpatti of Jaridih East GP under Bermo Block Bermo Block Jaridih East 11,72,600.00 On going
911 2023-24 Construction of AWC building at Harijan Tola of Jaridih West GP under Bermo Block Bermo Block Jaridih West 11,72,600.00 Yet to Start
912 2023-24 Construction of AWC building at Dihwa of Jaridih West GP under Bermo Block Bermo Block Jaridih West 11,72,600.00 On going
913 2023-24 Construction of AWC building at Kalali Road of Jaridih West GP under Bermo Block Bermo Block Jaridih West 11,72,600.00 Completed
914 2023-24 Construction of AWC building at Kurpaniya Basti of Kurpaniya GP under Bermo Block Bermo Block Kurpaniya 11,72,600.00 On going
915 2023-24 Construction of AWC building at Chatti Durga Mandir of Kurpaniya GP under Bermo Block Bermo Block Kurpaniya 11,72,600.00 Completed
916 2023-24 Construction of Panchayat Bhawan at Siyari GP of Gomia Block Gumia Block Siyari 99,89,000.00 On going
917 2023-24 Construction of Panchayat Bhawan at Lalpaniya GP of Gomia Block Gumia Block Lalpaniya 99,89,000.00 Completed
918 2023-24 Construction of Panchayat Bhawan at Tikahara GP of Gomia Block Gumia Block Tikahara 99,89,000.00 Completed
919 2023-24 Construction of Panchayat Bhawan at Goniyato GP of Gomia Block Gumia Block Goniyato 99,89,000.00 On going
920 2023-24 Construction of Panchayat Bhawan at Mahal West GP of Chandnankiyari Block Chandankiyari Block Mahal West 99,89,000.00 Completed
921 2023-24 Construction of PCC road from Khedan Kandu's house to Gomia Old Cinema Hall of Palihari Gurudih. (Length - 0.320km) Gumia Block Palihaari Gurudih 22,76,800.00 Completed
922 2023-24 Construction of PCC path (Length - 350KM) from Babli Swarnkar's house to Madhya Durga Temple. Gumia Block Gomia 23,75,000.00 Completed
923 2023-24 Construction of PCC road from Hanuman Temple in Gomia Basti to ONGC plant via Banglatand (Length - 1.050 km) Gumia Block Gomia 46,46,000.00 Completed
924 2023-24 Construction of PCC road from Mahavir Sthan main road to Konal River in village - Swang under Gomia Block (Length - 1.00 km) Gumia Block Sawang North 64,27,300.00 Completed
925 2023-24 Construction of Boundary Wall of Sharmik High School with play ground, Pamchayat - Tantri South Jaridih Block Tatri North 80,01,000.00 Completed
926 2023-24 Construction of Netaji Subash Chandra Bose Residential School at Tetuliya District Bokaro Chas Block Tentuliya 3,79,25,300.00 Completed
927 2023-24 Construction of Bhendra Cluster Blacksmith workshop at Nawadih, Bokaro Nawadih Block Bhendra 2,99,99,592.00 Completed
928 2023-24 Construction of PCC Road in Mayapur Panchayat in Village Khedguru Peterwar Block Mayapur 38,36,500.00 Completed
929 2023-24 Construction of PCC Road from Baradih to Black Road Peterwar Block Chalkari South 34,25,600.00 Completed
930 2023-24 Construction of PCC Road from Karmachowki to Hokabeda Chowk REO road Peterwar Block Angwali South 99,62,600.00 Completed
931 2023-24 Construction of PCC Road from the house of Rajkumar to Beliyatand Kasmar Block 24,96,500.00 Completed
932 2023-24 Construction of AWC building at Amlabad Harijan Tola of Amlabad GP under Chandankiyari Block Chandankiyari Block Amlabad 11,72,600.00 On going
933 2023-24 Construction of AWC building at Kodadih village of Amlabad GP under Chandankiyari Block Chandankiyari Block Amlabad 11,72,600.00 On going
934 2023-24 Construction of AWC building at Sabaldih village of Badajor GP under Chandankiyari Block Chandankiyari Block Badajor 11,72,600.00 Completed
935 2023-24 Construction of AWC building at Badajor village of Badajor GP under Chandankiyari Block Chandankiyari Block Badajor 11,72,600.00 Yet to Start
936 2023-24 Construction of AWC building at Chamudih Muslim Tola village of Chandra GP under Chandankiyari Block Chandankiyari Block Chandra 11,72,600.00 Completed
937 2023-24 Construction of AWC building at Ojha Tola village of Chndankiyari west GP under Chandankiyari Block Chandankiyari Block Chandankiyari West 11,72,600.00 On going
938 2023-24 Construction of AWC building at Nawadih Debgram village of Debgram GP under Chandankiyari Block Chandankiyari Block Devgram 11,72,600.00 Yet to Start
939 2023-24 Construction of AWC building at Murludih village of Kumirdoba GP under Chandankiyari Block Chandankiyari Block Kumirdoba 11,72,600.00 Completed
940 2023-24 Construction of AWC building at Sigdadih village of Kumirdoba GP under Chandankiyari Block Chandankiyari Block Kumirdoba 11,72,600.00 Completed
941 2023-24 Construction of AWC building at Bhumihar Tola village of Kumirdoba GP under Chandankiyari Block Chandankiyari Block Kumirdoba 11,72,600.00 Completed
942 2023-24 Construction of AWC building at Nuniyadih village of Kusumkiyari GP under Chandankiyari Block Chandankiyari Block Kusumkiyari 11,72,600.00 Completed
943 2023-24 Construction of AWC building at Nuniyadih middle Kulhi village of Kusumkiyari GP under Chandankiyari Block Chandankiyari Block Kusumkiyari 11,72,600.00 Yet to Start
944 2023-24 Construction of AWC building at Kanchanpur village of Laghla GP under Chandankiyari Block Chandankiyari Block Laghla 11,72,600.00 Completed
945 2023-24 Construction of AWC building at Tetul Ghuttu village of Laghla GP under Chandankiyari Block Chandankiyari Block Laghla 11,72,600.00 Completed
946 2023-24 Construction of AWC building at Laghla Kharayi Ghuttu village of Laghla GP under Chandankiyari Block Chandankiyari Block Laghla 11,72,600.00 On going
947 2023-24 Construction of AWC building at Darida village of Lalpur GP under Chandankiyari Block Chandankiyari Block Lalpur 11,72,600.00 Completed
948 2023-24 Construction of AWC building at Barsabad village of Lalpur GP under Chandankiyari Block Chandankiyari Block Lalpur 11,72,600.00 Completed
949 2023-24 Construction of AWC building at Lalpurdih village of Lalpur GP under Chandankiyari Block Chandankiyari Block Lalpur 11,72,600.00 On going
950 2023-24 Construction of AWC building at Mahal Bauri Tola village of Mahal East GP under Chandankiyari Block Chandankiyari Block Mahal East 11,72,600.00 Yet to Start
951 2023-24 Construction of AWC building at Mahal Niche Tola village of Mahal East GP under Chandankiyari Block Chandankiyari Block Mahal East 11,72,600.00 Yet to Start
952 2023-24 Construction of AWC building at Nawdiha Kachi Tola village of Nawdiha GP under Chandankiyari Block Chandankiyari Block Nawdiha 11,72,600.00 Yet to Start
953 2023-24 Construction of AWC building at Nawdiha Khan Tola village of Nawdiha GP under Chandankiyari Block Chandankiyari Block Nawdiha 11,72,600.00 Yet to Start
954 2023-24 Construction of AWC building at Nawdiha Dom Tola village of Nawdiha GP under Chandankiyari Block Chandankiyari Block Nawdiha 11,72,600.00 Yet to Start
955 2023-24 Construction PCC road from Lalpur to Kranti Mod in Hazari panchayat in Gram Ganjudih in Gomia Block Gumia Block Hazari 64,26,500.00 On going
956 2023-24 Construction of PCC road in Bandh Panchayat from Dudhmatia harizan Tola Bandh to Bokaro River Gumia Block Bandh 99,77,500.00 On going
957 2023-24 Construction of PCC road in Hazari GP from Kathara Gomia Chilka Pul to Nearest Shamshan Ghat Gumia Block Hazari 33,55,200.00 On going
958 2023-24 Construction of PCC road in Ghutri Panchayat from ward no. 15 ( Purna Tand) to Bhurkutu Jaridih Block Khutri 66,43,200.00 On going
959 2023-24 Construction of PCC road in Ghutri Panchayat from main road to Mangladih via Mehilal Marandi's house to Gitritad ( balidih) Jaridih Block Khutri 52,88,300.00 Completed
960 2023-24 Construction of PCC road in Ghutri Panchayat from Auhdar Tola Kamlesh Thakur's House to Jehra Sthal Jaridih Block Khutri 40,60,700.00 On going
961 2023-24 Construction of PCC road in Ghutri Panchayat from Main Road to Baskanari Jaridih Block Khutri 26,01,600.00 Completed
962 2023-24 Construction of Guardwal and PCC road from Rani Chirka Dilip Master's House to Gawai River Sagadiya Ghat Chas Block Kumardhaga 84,03,564.00 On going
963 2023-24 Construction of Pulia Guardwal and PCC road in Kanjkiro GP Village Piparadih from Trasformer to Arjun Mahto's House Nawadih Block Kanjkiro 74,10,200.00 On going
964 2023-24 Construction of library in Gomia GP Gumia Block Gomia 1,73,08,600.00 On going
965 2023-24 Renovation of Library at Chandankiyari Block Bokaro Chandankiyari Block Chandankiyari Block 18,92,100.00 Completed
966 2023-24 Construction of classroom extension of KGBV at jaridih Jaridih Block 1,99,08,200.00 On going
967 2023-24 Renovation of Building and construction of Boundry wall in sector 12 Rajkiye Kukut Prachetra in Chas Block Chas Block Ukrid 2,07,53,700.00 On going
968 2023-24 Construction of classroom extension of KGBV in Paterwar Peterwar Block Peterwar Block 1,54,39,700.00 Completed
969 2023-24 Training & Placement in Mining Sector Programs Bokaro District Bokaro District 4,84,24,120.00 On going
970 2023-24 Training & Placement in Iron & Steel Sector Programs Bokaro District Bokaro District 4,83,01,477.00 On going
971 2023-24 Training of AWC Sevika & Sahaika Bokaro District Bokaro District 3,09,76,000.00 On going
972 2023-24 Construction of PPC Road, Rajwardih Teacher Colony to Bharat Kumar Mahto House Jaridih Block Badhadih 18,77,000.00 Completed
973 2023-24 Construction of 200 feet RCC Guard wall Nawadih Block Penk 24,06,200.00 Completed
974 2023-24 Construction of 300 Feet RCC Guard Wall Nawadih Block Penk 11,89,400.00 On going
975 2023-24 Construction of 300 Feet RCC Guard Wall & Drain Nawadih Block Penk 24,09,800.00 On going
976 2023-24 Construction of PCC Road in Tantri Dakshin, from Parsadih Sahdev Manjhi House to Nahar Jaridih Block Tatri South 17,34,300.00 Completed
977 2023-24 Construction of PCC Road in Tantri Dakshin, from Jawa Mahto House to Panchayat Bhawan Jaridih Block Tatri South 23,15,100.00 Completed
978 2023-24 Construction of PCC Road in Tantri Dakshin, from Rajendra Mahto House to Puranatand Shankar Das House. Jaridih Block Tatri South 24,72,900.00 Completed
979 2023-24 Construction of PCC Road in Tantri Dakshin, from Kula Mahto House to Kumhardih Pull. Jaridih Block Tatri South 24,46,900.00 Completed
980 2023-24 Rennovation of pond at Rohaniatand, Amlabad Panchayat, Chandankiyari Chandankiyari Block Amlabad 13,58,000.00 Completed
981 2023-24 Renovation of Nutan Bandh at Silfor, Panchayat, Chandankiyari Chandankiyari Block Silfor 12,96,000.00 Completed
982 2023-24 Renovation of Shahab Bandh at Silfor, Panchayat, Chandankiyari Chandankiyari Block Silfor 10,84,000.00 Completed
983 2023-24 Renovation of Modi Godiya pond at Bagula Panchayat, Chandankiyari Chandankiyari Block Bagula 13,28,000.00 Completed
984 2023-24 Renovation of Shikhar Godiya pond at Lalpur Panchayat, Chandankiyari Chandankiyari Block Lalpur 12,23,000.00 Completed
985 2023-24 Renovation of Bhawala Godiya pond at Lalpur Panchayat, Chandankiyari Chandankiyari Block Lalpur 11,62,000.00 Completed
986 2023-24 Renovation of Koylabari pond at Lalpur Panchayat, Chandankiyari Chandankiyari Block Lalpur 13,36,000.00 Completed
987 2023-24 Renovation of Purana Sayar pond at Lalpur Panchayat, Chandankiyari Chandankiyari Block Lalpur 13,83,000.00 Completed
988 2023-24 Renovation of Sinath Godiya pond at Boriydih Panchayat, Chandankiyari Chandankiyari Block Boriyadih 11,64,000.00 Completed
989 2023-24 Renovation of Hind Godiya pond at Kushumkiyari Panchayat, Chandankiyari Chandankiyari Block Kusumkiyari 13,26,000.00 Completed
990 2023-24 Renovation of Gadiwa Bandh at Alargo Panchayat, Chandrapura Chandrapura Block Alargo 11,73,800.00 Completed
991 2023-24 Renovation of Khalcho Purni Bandh at Telo West Panchayat, Chandrapura Chandrapura Block Telo West 11,00,600.00 Completed
992 2023-24 Renovation of Bahiyaarhir Pond at Telo West Panchayat, Chandrapura Chandrapura Block Telo West 11,00,600.00 Completed
993 2023-24 Renovation of Chirudih, Kanari Pond at Turio Panchayat, Chandrapura Chandrapura Block Turio 11,00,600.00 Completed
994 2023-24 Renovation of Kadamara Pond at Turio Panchayat, Chandrapura Chandrapura Block Turio 16,15,900.00 Completed
995 2023-24 Renovation of Chirudih, Giritola Bandh Khata No. 78 at Turio Panchayat, Chandrapura Chandrapura Block Turio 11,00,600.00 Completed
996 2023-24 Renovation of Nawabandh Pond at Tarmi Panchayat, Chandrapura, Khata No. 99 Chandrapura Block Tarmi 10,56,700.00 Completed
997 2023-24 Renovation of Khodkhoswa Bandh at Tarmi Panchayat, Chandrapura Chandrapura Block Tarmi 11,73,800.00 Completed
998 2023-24 Renovation of Pond at Hathwajwa Part 1 in Armo Panchayat, Bermo Bermo Block Armo 7,54,300.00 Completed
999 2023-24 Renovation of Pond at Hanthwajwa Part - 2 in Armo Panchayat, Bermo Bermo Block Armo 5,15,200.00 Completed
1000 2023-24 Renovation of Pond at Bodiya East in Bermo Bermo Block Bermo Block 15,45,000.00 Completed
1001 2023-24 Renovation of Pond Behind Panchayat Bhawan Jaridih East in Bermo Bermo Block Jaridih East 7,83,500.00 Completed
1002 2023-24 Renovation of Pond at Baidhkaro Basti in Baidhkaro East in Bermo Bermo Block Baidhkaro East 5,88,400.00 Completed
1003 2023-24 Renovation of Pond at Vanchas in Alardih Panchayat in Jaridih Jaridih Block Araldih 7,34,700.00 Completed
1004 2023-24 Renovation of Pond at Dangrigoda in Alardih Panchayat in Jaridih Jaridih Block Araldih 7,13,300.00 Completed
1005 2023-24 Renovation of Pond at Kalyanpur Dhawalgada in Baru in Jaridih Jaridih Block Baru 10,56,700.00 Completed
1006 2023-24 Renovation of Pond at Kortand in Gaychhanda Panchayat in Jaridih Jaridih Block Gaychhanda 9,46,100.00 Completed
1007 2023-24 Renovation of Budhi Bandh at Gaychhanda Panchayat in Jaridih Jaridih Block Gaychhanda 10,86,000.00 Completed
1008 2023-24 Renovation of Jalova Pond at Araldih Panchayat in Jaridih Jaridih Block Araldih 6,27,400.00 Completed
1009 2023-24 Renovation of Pond at Ganjhhugodiya in Bandhdih Panchayat in Jaridih Jaridih Block Bandhdih North 11,00,600.00 Completed
1010 2023-24 Renovation of Ranasot Pond at Barai Panchayat in Nawadih Nawadih Block Barai 5,30,400.00 Completed
1011 2023-24 Renovation of Pond at Katartand in Daatu Panchayat in Kasmar Kasmar Block Daatu 17,59,200.00 Completed
1012 2023-24 Renovation of Pond at Chhagari Kanari in Sonpura Panchayat in Kasmar Kasmar Block Sonpura 14,07,900.00 Completed
1013 2023-24 Renovation of Jolahabandh in Kasmar Panchayat in Kasmar Kasmar Block Kasmar Block 12,71,000.00 Completed
1014 2023-24 Renovation of Sokadbandh in Baraikala Panchayat in Kasmar Kasmar Block Barikala 7,96,300.00 Completed
1015 2023-24 Renovation of Punjgadi Pond in Chalkari North Panchayat in Petewar Peterwar Block Chalkari North 11,73,000.00 Completed
1016 2023-24 Renovation of Salgobi Pond in Chalkari North Panchayat in Petewar Peterwar Block Chalkari North 7,93,300.00 Completed
1017 2023-24 Renovation of Pipal Bandh in Angawali North Panchayat in Nawadih Peterwar Block Angwali North 11,06,000.00 Completed
1018 2023-24 Renovation of Paildih Purna Bandh in Belunja Panchayat in Chas Chas Block Belunja 13,55,000.00 Completed
1019 2023-24 Renovation of Gulu Bandh in Pindrajora Panchayat in Chas Chas Block Pindrajora 12,93,000.00 Completed
1020 2023-24 Renovation of Pond in front of Quarter at Jarangdih Panchayat in Bermo Block Bermo Block Jarangdih North 5,88,400.00 Completed
1021 2023-24 Renovation of Pond Behind Panchayat Bhawan at Jaridih Panchayat in Bermo Block Bermo Block Jaridih East 17,36,000.00 Completed
1022 2023-24 Renovation of Pond Gobar Gadda part 2 at Jaridih West Panchayat in Bermo Block Bermo Block Jaridih West 6,27,400.00 Completed
1023 2023-24 Renovation of Pond Sotartand at Jaridih Panchayat in Bermo Block Bermo Block Jaridih East 14,07,900.00 Completed
1024 2023-24 Renovation of Kadam Bandh at Jaridih Panchayat in Bermo Block Bermo Block Jaridih East 11,44,500.00 Completed
1025 2023-24 Renovation of Sonpura Pond at Kasmar Panchayat in Kasmar Block Kasmar Block Sonpura 24,00,000.00 Completed
1026 2023-24 Renovation of Hetsarai Bandh at Tupra Panchayat in Chas Block Chas Block Tupra 13,22,000.00 Completed
1027 2023-24 Installation of 275 Lightning Conductor in Schools Bokaro District Bokaro District 4,95,00,000.00 Completed
1028 2023-24 Construction of AWC Building at Bodro Village + Panchayat - Alkusha Chas Block Alkusha 11,72,600.00 On going
1029 2023-24 Construction of AWC Building at Village + Panchayat - Alkusha Chas Block Alkusha 11,72,600.00 Yet to Start
1030 2023-24 Construction of AWC Building at Hajra Tola Village + Panchayat - Alkusha Chas Block Alkusha 11,72,600.00 Completed
1031 2023-24 Construction of AWC Building at Shyampur, Village + Panchayat - Alkusha Chas Block Alkusha 11,72,600.00 Completed
1032 2023-24 Construction of AWC Building at Karitand, Village + Panchayat - Alkusha Chas Block Alkusha 11,72,600.00 Completed
1033 2023-24 Construction of AWC Building at Aadamdih, Village + Panchayat - Alkusha Chas Block Alkusha 11,72,600.00 Completed
1034 2023-24 Construction of AWC Building at Basbodro, Village + Panchayat - Alkusha Chas Block Alkusha 11,72,600.00 Completed
1035 2023-24 Construction of AWC Building at Dumradaha-1, Village + Panchayat - Belunja Chas Block Belunja 11,72,600.00 On going
1036 2023-24 Construction of AWC Building at Pailadih, Village + Panchayat - Belunja Chas Block Belunja 11,72,600.00 On going
1037 2023-24 Construction of AWC Building at Dhampura, Village + Panchayat - Chainpur centre - 191 Chas Block Chainpur 11,72,600.00 Completed
1038 2023-24 Construction of AWC Building at Deva Tola, Village + Panchayat - Chainpur centre - 192 Chas Block Chainpur 11,72,600.00 Completed
1039 2023-24 Construction of AWC Building at Kocha Kulhi, Village + Panchayat - Chainpur centre - 193 Chas Block Chainpur 11,72,600.00 Completed
1040 2023-24 Construction of AWC Building at Chaipur - 1, Village + Panchayat - Chainpur Chas Block Chainpur 11,72,600.00 On going
1041 2023-24 Construction of AWC Building at Gurguri, Village + Panchayat - Chainpur Chas Block Chainpur 11,72,600.00 Yet to Start
1042 2023-24 Construction of AWC Building at Jhoparo - 2, Village + Panchayat - Chainpur Chas Block Chainpur 11,72,600.00 On going
1043 2023-24 Construction of AWC Building at Gorai, Village + Panchayat - Ghatiyali West Chas Block Ghatiyali West 11,72,600.00 Yet to Start
1044 2023-24 Construction of AWC Building at Kewat Tola, Village + Panchayat - Ghatiyali West Chas Block Ghatiyali West 11,72,600.00 On going
1045 2023-24 Construction of AWC Building at Jala Kumhar Tola, Village + Panchayat - Ghatiyali West Chas Block Ghatiyali West 11,72,600.00 On going
1046 2023-24 Construction of AWC Building at Mandaladih, Village + Panchayat - Ghatiyali West Chas Block Ghatiyali West 11,72,600.00 On going
1047 2023-24 Construction of AWC Building at village - Manjhidih, Panchayat - Godawali North Chas Block Godawali North 11,72,600.00 Yet to Start
1048 2023-24 Construction of AWC Building at village - Baridih, Panchayat - Godawali South Chas Block Godawali South 11,72,600.00 Yet to Start
1049 2023-24 Construction of AWC Building at village - Chirudih, Panchayat - Karhariya Chas Block Karhariya 11,72,600.00 On going
1050 2023-24 Construction of AWC Building at village - Aamtand (Mini), Panchayat - Karhariya Chas Block Karhariya 11,72,600.00 On going
1051 2023-24 Construction of AWC Building at village - Muslim Tola, Panchayat - Karhariya Chas Block Karhariya 11,72,600.00 On going
1052 2023-24 Construction of AWC Building at village - Baniya Tola, Panchayat - Karhariya Chas Block Karhariya 11,72,600.00 Yet to Start
1053 2023-24 Construction of AWC Building at village - Ghatwar Tola, Panchayat - Karhariya Chas Block Karhariya 11,72,600.00 On going
1054 2023-24 Construction of AWC Building at Harilagoda, village + Panchayat - Kolbendi. Chas Block Kolbendi 11,72,600.00 Yet to Start
1055 2023-24 Construction of AWC Building at Mamrkudar, village + Panchayat - Kolbendi. Chas Block Kolbendi 11,72,600.00 Yet to Start
1056 2023-24 Construction of AWC Building at Harilagoda Uper Tola, village + Panchayat - Kolbendi. Chas Block Kolbendi 11,72,600.00 Yet to Start
1057 2023-24 Construction of AWC Building at Tiyara - 2, village + Panchayat - Kolbendi. Chas Block Kolbendi 11,72,600.00 On going
1058 2023-24 Construction of AWC Building at Ranichirka, village + Panchayat - Kumardaga Chas Block Kumardhaga 11,72,600.00 On going
1059 2023-24 Construction of AWC Building at Kadamkulhi, village + Panchayat - Kumardaga Chas Block Kumardhaga 11,72,600.00 On going
1060 2023-24 Construction of AWC Building at Domkulhi, village + Panchayat - Kumardaga Chas Block Kumardhaga 11,72,600.00 Completed
1061 2023-24 Construction of AWC Building at Kumhari Khas, village + Panchayat - Kumhari Chas Block Kumhari 11,72,600.00 Yet to Start
1062 2023-24 Construction of AWC Building at Kumhari Bhuaa Tola, village + Panchayat - Kumhari Chas Block Kumhari 11,72,600.00 Yet to Start
1063 2023-24 Construction of AWC Building at Kumhari Das Tola, village + Panchayat - Kumhari Chas Block Kumhari 11,72,600.00 On going
1064 2023-24 Construction of AWC Building at Bauri Tola, village + Panchayat - Madhuniya Chas Block Madhuniya 11,72,600.00 Yet to Start
1065 2023-24 Construction of AWC Building at Paratand - 2, village + Panchayat - Madhuniya Chas Block Madhuniya 11,72,600.00 On going
1066 2023-24 Construction of AWC Building at Muslim Tola (Mini Centre), village + Panchayat - Mango Chas Block Mango 11,72,600.00 Yet to Start
1067 2023-24 Construction of AWC Building at Chhatmara, village + Panchayat - Narayanpur Chas Block Narayanpur 11,72,600.00 On going
1068 2023-24 Construction of AWC Building at village + Panchayat - Narayanpur Chas Block Narayanpur 11,72,600.00 Yet to Start
1069 2023-24 Construction of AWC Building at Chauda - 1, village + Panchayat - Narayanpur Chas Block Narayanpur 11,72,600.00 On going
1070 2023-24 Construction of AWC Building at Muslim Tola, village + Panchayat - Narayanpur Chas Block Narayanpur 11,72,600.00 Yet to Start
1071 2023-24 Construction of AWC Building at Bartand, village + Panchayat - Narayanpur Chas Block Narayanpur 11,72,600.00 Yet to Start
1072 2023-24 Construction of AWC Building at Jaytara - 1, village + Panchayat - Pokhanna Chas Block Pokhanna 11,72,600.00 Completed
1073 2023-24 Construction of AWC Building at Sidhatand, village + Panchayat - Pokhanna Chas Block Pokhanna 11,72,600.00 On going
1074 2023-24 Construction of AWC Building at Pokhanna - 1, village + Panchayat - Pokhanna Chas Block Pokhanna 11,72,600.00 On going
1075 2023-24 Construction of AWC Building at Kashitand, village + Panchayat - Pokhanna Chas Block Pokhanna 11,72,600.00 On going
1076 2023-24 Construction of AWC Building at Pokhanna - 2 , village + Panchayat - Pokhanna Chas Block Pokhanna 11,72,600.00 On going
1077 2023-24 Construction of AWC Building at Jaytara - 2, village + Panchayat - Pokhanna Chas Block Pokhanna 11,72,600.00 Yet to Start
1078 2023-24 Construction of AWC Building at Kadubihata, village + Panchayat - Pokhanna Chas Block Pokhanna 11,72,600.00 On going
1079 2023-24 Construction of AWC Building at Aamdih, village + Panchayat - Pokhanna AWC -307 Chas Block Pokhanna 11,72,600.00 Completed
1080 2023-24 Construction of AWC Building at Kewat Tola, village + Panchayat - Pupunki Chas Block Pupunki 11,72,600.00 Yet to Start
1081 2023-24 Construction of AWC Building at Regagoda, village + Panchayat - Tupra Chas Block Tupra 11,72,600.00 On going
1082 2023-24 Construction of AWC Building at Harijan Tola, village + Panchayat - Tupra Chas Block Tupra 11,72,600.00 Yet to Start
1083 2023-24 Construction of AWC Building at Oran Tola, village + Panchayat - Tupra Chas Block Tupra 11,72,600.00 Completed
1084 2023-24 Construction of AWC Building at Keliyadabar, Muslim Tola, village + Panchayat - Tupra Chas Block Tupra 11,72,600.00 On going
1085 2024-25 Supply of Breast pump with initiation technology in 9 healthcare facilities in CHCs, sub divisional hospitals and district hospitals Bokaro District Bokaro District 36,09,000.00 On going
1086 2024-25 Training & Placement of candidates in MS Office, English Speaking & Graphic Designers (MES/Q0601) (Target 600 candidates) Bermo Block Bermo Block 2,20,65,528.00 Completed
1087 2024-25 Training & Placement of candidates in Basic English for employability and MS Office (MEP/N9991 v1.0) (Target 750 candidates) Bermo Block Bermo Block 25,13,400.00 On going
1088 2024-25 Training & Placement of candidates in English speaking , Tally Beginner to Advance MS Office (MEP/Q0211) (Target 900 candidates) Bermo Block Bermo Block 2,79,92,090.00 On going
1089 2024-25 Training & Placement of candidates in Basic English For Office Operation Executive short handling, Typing, Steno & MS Office (MEP/Q0207)(Target 750 candidates) Bermo Block Bermo Block 2,64,02,028.00 On going
1090 2024-25 Designing, Engineering, Supply, Installation, and Testing, of High Mast Light of 16 mtr. With 8 floodlight with all accessories including 5 years O&M of (42 Units) Bokaro District Bokaro District 5,41,19,520.00 Completed
1091 2024-25 Renovation of Schedule trib residential boys hostel under peterwar block Peterwar Block Peterwar Block 49,20,400.00 On going
1092 2024-25 Construction of PCC road from Mandir mohalla from C.V. singh's house to Joriya nala in chandrapura block Chandrapura Block Chandrapura Block 27,81,700.00 On going
1093 2024-25 Construction of PCC road from Church Road Milan Chauk to under ground bridge in Chandrapura block Chandrapura Block Chandrapura Block 22,99,000.00 On going
1094 2024-25 Construction of boundary wall in panchyat bhavan of chandrpura panchayat in Chandrapura block Chandrapura Block Chandrapura Block 18,44,900.00 Completed
1095 2024-25 Construction of PCC road from Church Road railway boundary till joriya nala in Chandrapura block Chandrapura Block Chandrapura Block 28,93,800.00 On going
1096 2024-25 Construction of PCC road in chandrapura panchayat's Jikurghutu Chiranjeet singh's house till joriya nala in Chandrapura block Chandrapura Block Chandrapura Block 71,32,300.00 On going
1097 2024-25 Setting up Mathematics & Science Labs in 90 government schools, Bokaro District Bokaro District Bokaro District 47,78,894.00 Completed
1098 2024-25 Construction of PCC road in Baru panchayt from Dhadkidih primary school near khatri Gora via khanjo river in Jaridih block lenth 1.120 KM Jaridih Block Baru 98,34,900.00 On going
1099 2024-25 Supply of learning Kits in 2260 Government AWC in Bokaro district Bokaro District Bokaro District 1,78,92,780.00 Completed
1100 2024-25 Supply of Generator in 31 Panchyats of Bokaro district Bokaro District Bokaro District 3,80,78,600.00 Completed
1101 2024-25 Upgradation of Residential School into Smart Model Residential School in SC/ST Boys Hostel, Peterwar block Peterwar Block Peterwar Block 67,55,500.00 Completed
1102 2024-25 Implementation of future classroom in all KGBV and Netaji Shubhash in Bermo, Jeridih, Nawadih, Gomiya, Peterwar, Chas Chadankiyari and Chandrapura Bokaro District Bokaro District 3,43,97,000.00 Completed
1103 2024-25 Upgradation of 227 AWC in Bermo, Jeridih, Nawadih, Gomiya and Chandrapura block Bokaro District Bokaro District 1,15,33,647.54 On going
1104 2024-25 Supply, Installation & Maintenance of digital Mat in 312 AWC at Chandankyari, Chas gramin, Kasmar, Jeradih & Chandrapura Bokaro District Bokaro District 3,92,45,856.00 On going
1105 2024-25 Supply, Installation & Maintenance of digital Mat in 363 AWC at Peterwar, Bermo, Nawadih & Gomiya Bokaro District Bokaro District 4,56,61,044.00 Completed
1106 2024-25 Supply of 2300 bench desk in 150 govt schools, Bokaro Bokaro District Bokaro District 88,61,900.00 Completed
1107 2024-25 Designing, Engineering, Supply, Installation, and Testing, of High Mast Light of 12 Mtr., 16 mtr. And street light (25 Units) in Peterwar, Jaridih and Chas block Bokaro District Bokaro District 2,30,10,000.00 On going
1108 2024-25 Construction of Additional room in primary school,Makhtab at Bermo block Bermo Block 38,83,100.00 Yet to Start
1109 2024-25 Construction of extra room in Dalahitand, in Chandankyari Chandankiyari Block 38,83,100.00 Yet to Start
1110 2024-25 Construction of extra room in,Maganpur at Chas block Chas Block 38,83,100.00 Yet to Start
1111 2024-25 Construction of extra room Tupara at Chas block Chas Block 38,83,100.00 Yet to Start
1112 2024-25 Construction of extra room Dhatkibeda at Nawadih block Nawadih Block 38,83,100.00 Yet to Start
1113 2024-25 Construction of extra room Jamuniya Tand, Khurd chando at Peterwar block Peterwar Block 38,83,100.00 Yet to Start
1114 2024-25 Construction of extra room Ambadih at Gomia block Gumia Block 38,83,100.00 On going
1115 2024-25 Construction of extra room in Barwakocha at Gomia block Gumia Block 38,83,100.00 On going
1116 2024-25 Construction of extra room in Kathwari at Chas block Chas Block 54,80,000.00 On going
1117 2024-25 Construction of PCC road at Ghatyali from Kenduwadih tola to Bodi dam, at Chas block Chas Block Ghatiyari 42,05,600.00 Yet to Start
1118 2024-25 Extention of Doctors and paramedical stffs, Bokaro Bokaro District 91,09,056.00 Completed
1119 2024-25 Supply of need-based healthcare equipments to the civil surgeon Bokaro Bokaro District Bokaro District 2,76,86,576.00 Completed
1120 2024-25 Installation of 150 Lightning Conductors in 260 Schools ( Nawadih & Kasmar) Bokaro District Bokaro District 4,68,00,000.00 Completed
1121 2024-25 Supply the weight Machines, Thermometer, BP Meter, Hemoglobin, Hemoglobin Strip, Ambu Bag, Nebulizer etc. Bokaro District Bokaro District 4,81,27,167.00 Completed
1122 2024-25 Bala Painting in 1186 AWC centers (Kasmar -105, Jaridih- 99, Gomia - 176, Chas-80, Bermo-52, Nawadih - 142, Chandrapura - 82 Peterwar - 142) Bokaro District Bokaro District 6,70,70,589.00 Completed
1123 2024-25 Capacity building through up skilling training program to existing farmers engaged in animal husbandary segment for their livelihood Enhancement in the district Bokaro Bokaro District Bokaro District 2,48,16,456.00 Completed
1124 2024-25 Establishment of a Training Center cum Prodction unit to generate livelihood of 400 Women of SHGs & Belong from SC/ST/OBC/EWS category in Jainmore Cluster Phase-01 Jaridih Block jaina 4,89,86,000.00 On going
1125 2024-25 Establishment of a Training Center cum Prodction unit to generate livelihood of 400 Women of SHGs & Belong from SC/ST/OBC/EWS category in Bermo Cluster Phase-02 Bermo Block Bermo Block 4,89,86,000.00 On going
1126 2024-25 Construction of drainage with slab at Bermo block in Jaridih East GP behind Pucca Building(200m). Bermo Block Jaridih East 7,48,100.00 On going
1127 2024-25 Construction of Paver blocks both side from yogesh tea stall to Bank more in Jaridih East GP in Bermo Block (0.430KM) Bermo Block Jaridih East 36,89,500.00 On going
1128 2024-25 Construction of PCC road from Deepak singh house to hirak road in Bermo Block in Bokaro district Bermo Block Baidhkaro East 30,67,700.00 On going
1129 2024-25 Construction of drain with slab in Bermo block in Bokaro district from 3 No. Hind street nandlal shop by primary school Bermo Block Baidhkaro East 24,99,950.00 On going
1130 2024-25 Installation of 75 Lightning Conductor in Schools Bokaro District Bokaro District 4,05,00,000.00 Completed
1131 2024-25 Installation of 50 Lightning Conductor in Schools Bokaro District Bokaro District 90,00,000.00 Completed
1132 2024-25 Renovation of Sonhar Dam at GP Sonpura in Kasmar block Kasmar Block Sonpura 13,65,500.00 Completed
1133 2024-25 Renovation of Damangodiya Pond at GP Sonabad, Haridih in Chas block Chas Block Sonabad 9,51,000.00 Completed
1134 2024-25 Renovation of Naryahi Pond at GP Hurlung in Karmatand in Gomia block Gumia Block Karma Tand 7,34,700.00 Completed
1135 2024-25 Renovation of Kamarpenda Pond Jaridih block Jaridih Block Jaridih Block 7,80,800.00 Completed
1136 2024-25 Installation of 72 Lightning Conductor in Schools Bokaro District Bokaro District 1,29,60,000.00 Completed
1137 2024-25 Supply, Installation and Maintenance of multiple cages for developing the aquaculture park in tenughat dam and other large water bodies Gumia Block Gumia Block 4,92,39,000.00 On going
1138 2024-25 Supply of Installation & Maintenance of Tab Lab in 60 Government school of Bokaro Bokaro District Bokaro District 4,98,07,800.00 Completed
1139 2024-25 Supply of Installation & Maintenance of VR Lab in 20 Government school of Bokaro Bokaro District Bokaro District 4,99,14,000.00 Completed
1140 2024-25 Supply of Installation & Maintenance of VR Lab in 20 Government school of Bokaro Bokaro District Bokaro District 4,99,14,000.00 Completed
1141 2024-25 Designing, Engineering, Supply, Installation, and Testing, of High Mast Light of 12 Mtr., 16 mtr. And street light (11 Units) in Jaridih block Bokaro District Bokaro District 1,01,24,400.00 On going
1142 2024-25 Designing, Engineering, Supply, Installation, and Testing, of High Mast Light of 12 Mtr., 16 mtr. And street light (11 Units) in Jaridih and Nawadih block Bokaro District Bokaro District 1,01,24,400.00 On going
1143 2024-25 Supply of Installation & Maintenance of VR Lab in 20 Government school of Bokaro Bokaro District Bokaro District 4,99,14,000.00 Completed
1144 2024-25 BALA Painting of Govt. Schools in Kasmar(18) and Jaridih (8) total 26 schools Bokaro District Bokaro District 4,90,93,555.00 Completed
1145 2024-25 Construction of PCC road at KalaPatthar GP under chas block from modidih to Chiksiya Shokhathan Chas Block Chas Block 30,07,170.00 On going
1146 2024-25 Designing, Engineering, Supply, Installation, and Testing, of High Mast Light of 12 Mtr., 16 mtr. And street light (06 Units) in Jaridih and Nawadih block Bokaro District Bokaro District 55,22,400.00 On going
1147 2024-25 Supply of need-based healthcare equipments to the civil surgeon Bokaro Bokaro District Bokaro District 4,57,29,925.00 Completed
1148 2024-25 One Year Salary Payment of Engaged support staff (Medical professionals staff) around District. (Phase-2) Bokaro District Bokaro District 18,12,660.00 Completed
1149 2024-25 Renovation of Bangalihir Pond at GP Siyari in Gomia block Gumia Block Siyari 1,56,04,250.00 On going
1150 2024-25 Renovation of Badka Aahaar Pond at GP Hosir East in Gomia block Gumia Block Hosir East 2,49,02,150.00 On going
1151 2024-25 Supply, Installation, Maintenance of 2 HP & 5 HP Solar Lift in 62 locations Bokaro District Bokaro District 4,72,38,296.00 On going
1152 2024-25 Supply, Installation, Maintenance of 2 HP & 5 HP Solar Lift in 43 locations Bokaro District Bokaro District 3,80,77,102.00 On going
1153 2024-25 Construction of 2 nos of Additional Classrooms in UPG Rajkiyakrit high school Araju in Jaridih block Jaridih Block Araju 26,36,000.00 On going
1154 2024-25 Construction of 6 nos of Additional Classrooms in Rajkiyakrit Middle school Bhendra in Nawadih block Nawadih Block Bhendra 55,78,400.00 On going
1155 2024-25 Construction of 2 nos of Additional Classrooms in UPG Rajkiyakrit high school Gaychhanda in Jaridih block Jaridih Block Gaychhanda 31,96,800.00 On going
1156 2024-25 Construction of 4 nos of Additional Classrooms in UPG Rajkiyakrit high school Sunday Bazar in Bermo block Bermo Block Bermo Block 46,61,700.00 On going
1157 2024-25 Construction of 6 nos of Additional Classrooms in UPG Rajkiyakrit high school at Chanpi in Bermo block Bermo Block Chapi 55,78,400.00 On going
1158 2024-25 Construction of 8 nos of Additional Classrooms in UPG Basic high school at Sonabad in Chas block Chas Block Sonabad 76,59,000.00 On going
1159 2024-25 Construction of 2 nos of Additional Classrooms in SS high school Kasmar in Kasmar block Kasmar Block kasmar 26,36,000.00 On going
1160 2024-25 Construction of 2 nos of Additional Classrooms in KGBV Kasmar in Kasmar block Kasmar Block kasmar 26,36,000.00 On going
1161 2024-25 Construction of 4 nos of Additional Classrooms in Rajkiyakrit Middle school at Angwali in Peterwar block Peterwar Block Angwali North 46,61,700.00 On going
1162 2024-25 Construction of 2 nos of Additional Classrooms in UPG Rajkiyakrit high school Chilgadda in Jaridih block Jaridih Block Chilgadda 26,36,000.00 On going
1163 2024-25 Construction of 01 nos of Additional Classrooms in UPG Rajkiyakrit PS Mahal(Urdu) in Chandankiyari block Chandankiyari Block Mahal East 8,89,100.00 On going
1164 2024-25 Construction of 06 nos of Additional Classrooms in UPG Rajkiyakrit High School Koria in Chandankiyari block Chandankiyari Block Mahal East 55,78,400.00 On going
1165 2024-25 Laying of Paver Block at Both Sides of road at GMT and HMT Colony in Govindpur C Panchayat, Bermo Block. Bermo Block Govindpur-c 24,99,700.00 Completed
1166 2024-25 Constructin of Boundary wall Alongwith laying of paver block besides Panchayat Sachivalaya of Govindpur C Panchayat, Bermo Block. Bermo Block Govindpur-c 23,02,300.00 On going
1167 2024-25 BALA Painting at Sadar Hospital Chas, SDH Chas, & Bermo and 4 MTC center in Bokaro District Bokaro District Bokaro District 0.00 On going
1168 2024-25 Construction and extention of CHC under block chas Bokaro Bokaro District Bokaro District 99,96,900.00 On going
1169 2024-25 Construction of 1500 ft guard wall in Koriyabeda checkdam in GP Chanpi under Peterwar Block Peterwar Block Chapi 1,23,41,800.00 On going
1170 2024-25 Construction of PCC road and drain from 4 lane's mohan sigh house to Anand murmu house under Jaridih block in Jaina GP Jaridih Block Jaina 46,65,900.00 On going
1171 2024-25 Designing, Engineering, Supply, Installation, and Testing, of High Mast Light of 12 Mtr., 16 mtr. And street light (14 Units) in Jaridih and Peterwar block Bokaro District Bokaro District 1,28,85,600.00 On going
1172 2024-25 Construction of PCC road at Amlabad GP under chandankiyari block from shubhas bauri shop to shahdev bauri house Chandankiyari Block Amlabad 7,14,630.00 On going
1173 2024-25 Construction of PCC road at Amlabad GP under chandankiyari block from Bhiguram Shekhar house to Jivan Bauri house Chandankiyari Block Amlabad 84,88,820.00 On going
1174 2024-25 Construction of PCC road at Amlabad GP under chandankiyari block from Suresh bauri shop to Hirak road Chandankiyari Block Amlabad 99,93,470.00 On going
1175 2024-25 Supply, Installation, and maintanance of Modular Kitchen equipment in residential school/ hostels in Bokaro district Bokaro District Bokaro District 2,46,00,000.00 On going
1176 2024-25 Implementation of a Coaching Project for Prepration of Competitive Exams & Government Services Exams for the 426 students from Disadvantaged communities of Mining Bokaro District Bokaro District 4,57,88,000.00 On going
1177 2024-25 BALA Painting at Upgraded Middle School, Pipradih, Nawadih Nawadih Block Kanjkiro 4,79,04,780.00 Completed
1178 2024-25 Diagnostic Laboratory Equipment & Infrastructure Solution with (3 years) O&M at Block Bermo in Bokaro district Bermo Block Bermo Block 4,09,49,120.00 On going